background image

Vertical

Platform 

Lift

Installation

Guide

Содержание Hercules 750 Residential

Страница 1: ...Vertical Platform Lift Installation Guide ...

Страница 2: ...y Conditions Step 12 Run the Platform and Verify Function Step 13 Attach the Exterior Wall Step 14 Final Placement of the Tower Step 15 Level the Tower Step 16 Anchor the Platform to the Concrete Slab Step 17 Set the Upper and Lower Landing Switches Step 18 Install and Wire Call Stations Step 19 Install and Wire the Upper Landing Gate Step 20 Adjust the Interlock Step 21 Attach Folding Ramp Contro...

Страница 3: ...instructions contained in this installation guide before installing the AmeriGlide VPL It is highly recommended to observe and adhere to all governing codes and ordinances in the job site locale This includes ensuring all work and materials comply and conform with all authorities having jurisdictions Proper installation is the responsibility of the installer and failure to follow all instructions ...

Страница 4: ...nently hazardous situation which if not avoided will result in death or serious injury WARNING Failure to follow any of WARNING is likely to result in such grave consequences as death or serious injury CAUTION Failure to follow any of CAUTION may in some cases result in grave consequences NOTE Provides information such as reminders and guidelines and do not fit into the preceding text The VPL has ...

Страница 5: ...r exceed the maximum rated lift capacity Never use the VPL to lift freight or other materials than intended by design Read and understand the installation guide prior to installing the VPL Wear appropriate safety protection equipment for your head eyes hands and feet during all phases of the installation Use extreme caution when lifting components into position to avoid personal injury and damage ...

Страница 6: ...ecommended anchor fasteners Lock the wheels of any mobility device riding on the platform Check and verify for applicable local codes and regulations NOTE Failure to comply the these Installation Safety Instructions could render the AmeriGlide Limited Warranty null and void If you have any question or concerns that are not covered in this installation guide please contact your dealer immediately 5...

Страница 7: ...drivers Philips PH1 PH2 PH3 Pozidriv PZ1 PZ2 Tork Bo Slotted 0 4 X 2 5 0 6 X 3 5 0 8 X 4 0 1 X 5 5 Hexagon 3MM 3 32 7 64 1 8 9 64 5 32 3 16 7 32 1 4 Square 1 2 3 1 4 Drive Hex Bits Philips PH2 PH3 Square 2 Extension Adapter 1 4 Hex Shank to 3 8 socket Square drive Rachet 1 4 DR X 5 LONG 1 2 DR X 8 LONG 3 8 DR X 7 LONG 1 4 Drive Hex Socket Hexagon 13MM 3 8 Drive Hex Socket Hexagon 7 16 1 2 9 16 6 ...

Страница 8: ... Aluminum Bubble Level Plumb Bob 8oz Brass Plumb Bob Zip Ties 12 Dolly Pliers Long Nose 6 Stripper 10 22 AWG Crimper 10 22 AWG insulated and non insulated terminals Fuse Puller Retaining Ring 8 Steel Retaining Ring Pliers Drill Bits and Taps Drill Bits 9 64 5 32 13 64 17 64 5 16 3 8 Concrete Drill Bit 1 4 3 8 Taps 8 32 10 24 1 4 20 5 16 18 3 8 16 Taps Holder Tap Holder or Driver Attachment for Dri...

Страница 9: ...re the protection wall fascia panel is level and flush with the edge of the landing No pinch points Electrical 120v 20a outlet do not connect supply through the GFCI outlet Concrete slab 5 x 7 x 5 Protection wall flush smooth no pinch points What You ll Need Job Site Preparation 8 Installing the Vertical Platform Lift ...

Страница 10: ... 2 U1 batteries if DC unit 1 box folding ramp arm bolts touch up paint labels guides bolts 1 installation kit box Folding ramp 2 guard panels floor under pan top cover car sling top gate interlocks call stations if applicable Parts Include 97 x 49 x 49 inches 1 000 lbs Standard 64 model 9 ...

Страница 11: ...sition PRO TIP you can also use steel bars as rollers a pry bar and mallet or walk the tower corner to move easily the platform on the concrete slab See image Step 15 Step 4 Remove the shipping blocks and fasteners C DO NOT ANCHOR THE TOWER YET If you have an extended VPL model please refer to the Extended VPL Tower Guide Scan to access 10 ...

Страница 12: ...e already on the car sling unscrew and screw B IMPORTANT Use the same bolt combination that is already on car sling C DO NOT tighten the bolts yet Scan to watch more videos can be found at youtube com ameriglide How to Attach the Car Sling 1 50 3 00 11 ...

Страница 13: ...ft the car sling slightly off the ground with the hand crank and then tighten the bolts B Fix the under pan wire in the corner of the roller arm and secure with a zip tie Step 8 Install the platform floor centered on the car sling more videos can be found at youtube com ameriglide Securing the Travel Cable 1 minute 12 Scan to watch ...

Страница 14: ...Step 9 Connect the batteries If you have an AC model jump to Step 13 A Wiring scheme available by scanning QR code 13 ...

Страница 15: ...where your problem is B QR code to access the troubleshooting guide side of the tower Scan to watch more videos can be found at youtube com ameriglide Checking the Safety Pan Circuit 4 minutes VPL Troubleshooting Guide Scan to read Tools Required P1 Accessing Internal Components P2 Testing Main Fuse P3 Testing the Breaker P4 Testing Limit Switch Connections 0 10 0 20 2 35 4 00 5 09 P5 F O Switch C...

Страница 16: ...torque after with a hand wrench B Follow installation guide for more details Step 12 Run the platform a few inches up then down to verify functionality more videos can be found at youtube com ameriglide Mount the Exterior Guard Panel 7 46 8 38 15 Scan to watch ...

Страница 17: ...l be with in of an inch from the landing wall Step 15 Level the tower A Use a level and shims to level the tower we supply stainless steel shims in the installation kit B Check the platform both legs and both sides of the tower to ensure it is leveled C After leveling double check the platform gap running clearance to be sure it has not moved Adjust if necessary 16 ...

Страница 18: ...mmer drill B Place the lag bolts in the holes and hammer them down but DO NOT tighten them yet Use the supplied Cobra concrete anchors C Perform a final verification that the platform gap is the same and that the tower is still level D Tighten the 6 lag bolts in a star pattern 17 ...

Страница 19: ... stations A Plug into the 3 pin quick connector see right for the platform panel box more videos can be found at youtube com ameriglide Upper Landing Switch Adjustment 2 minutes B pass the wires inside the conductors This protects the wires and avoid potential shorts more videos can be found at youtube com ameriglide Install Lower Landing Call Station 7 20 7 45 18 Scan to watch Scan to watch ...

Страница 20: ...connector see right or the platform panel box C Pass the wires inside the supplied conductors This protects the wires and avoid potential shorts D Fix the L bracket on each side of the gate make it even more solid Scan to watch more videos can be found at youtube com ameriglide Gates and Interlocks 3 minutes 19 ...

Страница 21: ...erlock until it locks Note there are 2 micro switches inside the interlock they both must be released non activated or the unit to run Scan to watch more videos can be found at youtube com ameriglide Exterior Door and Interlock 2 minutes Scan to watch more videos can be found at youtube com ameriglide Surface Mounting an Interlock 2 minutes Scan to watch more videos can be found at youtube com ame...

Страница 22: ...tments necessary B Be careful not to put weight on it while it is folding It ll brake it Step 22 Install facade panel tower front wall and top cover A Plug into the 3 pin quick connector see right for the platform panel box Scan to watch more videos can be found at youtube com ameriglide Folding Ramp Adjustment 2 minutes 21 ...

Страница 23: ...aveling cable under the COP cover Step 24 Attach the under pan under the platform A Make sure each micro switch is adjusted downward 4x B The switches shall only click when under pan is pushed up Scan to watch more videos can be found at youtube com ameriglide Install the Interior Guard Panel 10 24 12 59 Scan to watch more videos can be found at youtube com ameriglide Under Pan Installation 9 05 9...

Страница 24: ...Who how to call for service and the information needed for service C Emergency lowering device D How to unlock gate interlock with the override key E Beeping alarm estop engaged F Recommend to leave the unit 24 above the ground during winter to avoid it freezing to the ground G Always let the power supply on otherwise you will dry the batteries 23 ...

Страница 25: ...5110 Atlantic Ave Raleigh NC 27616 AmeriGlide com ...

Отзывы: