INSTALLATION
7
PHOTO #2
3. Seal the spaces between frames and side box panels by
tightening the butterfly ¼” nuts on the provided seal
brackets (see PHOTO #3 page 8).
4. Make the electrical connections (page 8) and install the
refrigeration unit (page 13).
5.
Lower the ceiling panel over the Coil Assembly Frame
and secure the ceiling to the fans top filler panel with 8/32”
bolts in the predrilled holes (see DRAWING # 5 & PHOTO
#2). Drill holes in the coil side of the ceiling through the coil
filler and secure with self-taping 8/32” stainless steel
screws.
DRAWING # 5
Содержание Blast Chiller AP40BC250-12
Страница 5: ...CONTROLLER 3...
Страница 12: ...INSTALLATION 10 PHOTO 4 PHOTO 5...
Страница 14: ...INSTALLATION 12 PHOTO 7 Door magnetic switch on the left Magnet on the right PHOTO 8...
Страница 38: ...APPENDIXES 36 Appendix 2 Electrical Schematic 1...
Страница 39: ...APPENDIXES 37 Appendix 3 Electrical Schematic 2...