
INSTALLATION
9
COLOR CODE CHART
PLUG/CONNECTOR
COLOR
PLUG/CONNECTOR DESTINATION
CABLE/WIRE
TYPE
QUICK-CONNECT (PLUG-CONNECTOR) CABLES
BLUE FANS
SOOW
YELLOW DEFROST
HEATERS
SOOW
GRAY SOLENOID
VALVE
SOOW
WHITE INTERIOR
LIGHT SOOW
GREEN UV
LIGHT
SOOW
BROWN
DOOR SWITCH
SOOW / WIRE
ORANGE
DOOR / WINDOW HEATERS
SOOW / CONN. BOX
RTD (FOOD, AIR & DEFROST) PROBES (GREY WIRE)
GREEN
PRODUCT PROBE
THERMOCOUPLE (OPTIONAL)
BLUE PRODUCT
PROBE
THERMOCOUPLE (OPTIONAL)
YELLOW PRODUCT
PROBE THERMOCOUPLE (OPTIONAL)
RED
PRODUCT PROBE
THERMOCOUPLE (STANDARD)
BROWN AIR
PROBE
THERMOCOUPLE (STANDARD)
WHITE DEFROST
PROBE
THERMOCOUPLE (STANDARD)
DRAWING #6
NOTE
: Route the micro-switch (B) wires through the wall and bring them inside the box at approx. 6” above
the door. Insulate the wall hole (s) with silicone or grommets. Take precaution to protect the heater wires
inside the door frame.
Содержание Blast Chiller AP40BC250-12
Страница 5: ...CONTROLLER 3...
Страница 12: ...INSTALLATION 10 PHOTO 4 PHOTO 5...
Страница 14: ...INSTALLATION 12 PHOTO 7 Door magnetic switch on the left Magnet on the right PHOTO 8...
Страница 38: ...APPENDIXES 36 Appendix 2 Electrical Schematic 1...
Страница 39: ...APPENDIXES 37 Appendix 3 Electrical Schematic 2...