INDEX
1
Index
Index
....................................................................................................................................................................................... 1
A. Introduction ......................................................................................................................................................................... 2
A.1. Controller Features...................................................................................................................................................... 2
B. Installation........................................................................................................................................................................... 4
B.1. Initial Cabinet Preparation ........................................................................................................................................... 4
B.2. Single Unit Installation AP40BC250-12 And BCCP-1 ................................................................................................. 5
B.2.1. Install Coil Assembly Frame ................................................................................................................................ 5
B.2.2. Install Fan Assembly Frame ................................................................................................................................ 6
B.2.3. Electrical Connections ......................................................................................................................................... 8
B.3. Double Unit Installation AP40BC250-2-12, BCCP-2, And BCIP............................................................................... 11
C. Refrigeration Unit Installation ........................................................................................................................................... 13
C.1. Preparation................................................................................................................................................................ 13
C.2. Find The Location...................................................................................................................................................... 13
C.3. Refrigeration Lines Installation.................................................................................................................................. 14
C.3.1. Installation At The Same Level .......................................................................................................................... 15
C.3.2. Installation At Different Levels ........................................................................................................................... 15
C.4. Connect The Remote Unit......................................................................................................................................... 15
D. Programming The Controller ............................................................................................................................................ 17
D.1. Blast Chilling Modes.................................................................................................................................................. 17
D.2. PC Connection Mode ................................................................................................................................................ 17
D.3. Programming Modes ................................................................................................................................................. 18
D.4. Initial Programming ................................................................................................................................................... 18
D.4.1. Initial Programming Procedure And Parameters ............................................................................................... 18
D.5. Parameter Programming........................................................................................................................................... 21
D.5.1. Parameter Programming For Automatic Cycle.................................................................................................. 21
D.5.2. Parameter Programming For Manual Cycle ...................................................................................................... 22
D.5.3. Parameter Programming For Defrost Cycle ...................................................................................................... 23
D.5.4. Parameter Programming For UV Cycle ............................................................................................................. 24
D.5.5. Parameter Programming For Print Cycle........................................................................................................... 24
D.6. Programming The Alarms ......................................................................................................................................... 24
D.6.1. Setting The Food Probe Alarms ........................................................................................................................ 25
D.6.2. Setting The Air Probe Alarm .............................................................................................................................. 25
D.7. Recipe Names........................................................................................................................................................... 25
E. Printer (Optional) .............................................................................................................................................................. 26
E.1. Loading A Roll Of Paper............................................................................................................................................ 26
E.2. Removing A Roll Of Paper ........................................................................................................................................ 26
E.3. Operating The Printer ................................................................................................................................................ 26
E.4. Maintenance .............................................................................................................................................................. 26
E.5. Replacing The Ribbon (No Paper In The Printer) ..................................................................................................... 26
E.6. Replacing The Ribbon (With Paper In The Printer)................................................................................................... 26
E.7. Clear The Events Memory......................................................................................................................................... 27
F. Operating And Maintaining The Unit................................................................................................................................. 28
F.1. Panning And Loading ................................................................................................................................................ 28
F.2. Operating ................................................................................................................................................................... 29
F.2.1. Automatic Cycle ................................................................................................................................................. 29
F.2.2. Manual Cycle...................................................................................................................................................... 29
F.2.3. Defrost Cycle...................................................................................................................................................... 30
F.2.4. UV Cycle ............................................................................................................................................................ 31
F.2.5. Print Cycle .......................................................................................................................................................... 31
F.2.6. Error Messages And Troubleshooting................................................................................................................ 32
F.3. Maintenance And Cleaning ....................................................................................................................................... 33
G. Standard Warranty ........................................................................................................................................................... 34
Appendixes
.......................................................................................................................................................................... 35
Appendix 1 Settings Record for AP40BC250-12, AP40BC250-2-12, BCCP-1, BCCP-2, and BCIP ............................... 35
Appendix 2 Electrical Schematic 1 ................................................................................................................................... 36
Appendix 3 Electrical Schematic 2 ................................................................................................................................... 37
Appendix 4 Parts List ........................................................................................................................................................ 38
Appendix 5 Ordering Printer Supplies (Ribbon & Paper) ................................................................................................. 39
Содержание Blast Chiller AP40BC250-12
Страница 5: ...CONTROLLER 3...
Страница 12: ...INSTALLATION 10 PHOTO 4 PHOTO 5...
Страница 14: ...INSTALLATION 12 PHOTO 7 Door magnetic switch on the left Magnet on the right PHOTO 8...
Страница 38: ...APPENDIXES 36 Appendix 2 Electrical Schematic 1...
Страница 39: ...APPENDIXES 37 Appendix 3 Electrical Schematic 2...