47
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws (bearing setscrews), and nonpermanent gas connections (unions, shutoff valves,
orifices, and grounding connections). Motor and drive belts
should be
examined. Cracked or seriously frayed
belts
should be
replaced. Tighten loose V-belts when necessary. Complete operational check of controls and
valves. Complete operational check of
ALL
safety devices (door switch, lint drawer switch, sail switch, burner,
and hi-limit thermostats).
30 DAYS AFTER INSTALLATION
SHUT OFF ALL POWER TO THE DRYER.
Verify that the electrical connections to the motor contactors
and overloads are tight. This is done to accommodate the compression of the wires over time.
C. LUBRICATION
MONTHLY
The two (2) bearings that support the impellor/fan shaft
must be
lubricated. Use Shell Alvania #2 grease or its
equivalent. Generically, this grease would be described as an NLGI Grade 2 multipurpose industrial grease with
a lithium thickener and mineral base oil.
EVERY 3 MONTHS
The four (4) bearings that support the drive and idler shafts
must be
lubricated. Use Shell Alvania #2 grease or
its equivalent. Generically, this grease would be described as an NLGI Grade 2 multipurpose industrial grease
with a lithium thickener and mineral base oil.
Содержание AD-310
Страница 11: ...7 310 NON TILT GAS MODEL B DIMENSIONS AND COMPONENT LOCATION ...
Страница 12: ...8 310 NON TILT STEAM MODEL ...
Страница 14: ...10 1 Reassembly Instructions For Gas Dryer Shipped In Two 2 Pieces ...
Страница 16: ...12 2 Reassembly Instructions For Steam Dryer Shipped In Two 2 Pieces ...
Страница 22: ...18 ...
Страница 23: ...19 ...
Страница 24: ...20 ...
Страница 64: ...60 B I O BOARD INPUT AND OUTPUT L E D INDICATORS ...
Страница 80: ...76 ...
Страница 81: ...ADC 113110 1 01 04 00 20 2 05 07 01 20 ...