![Amazone ZG-TS 10001Truck Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/amazone/zg-ts-10001truck/zg-ts-10001truck_operating-manual_2919793065.webp)
Commissioning
ZG-TS BAG0203.2 06.19
65
6.7
Switch-on point and switch-off point
•
The switch-on point is the position for opening the shutters
when moving out of the headlands at which the best possible
fertiliser distribution is achieved.
•
The switch-off point is the position for closing the shutters
when moving onto the headlands at which the best possible fer-
tiliser distribution is achieved..
The switch-on point and switch-off point are measured from the cen-
tre of the headlands to the centre of the spreading disc.
See the setting chart for the switch-on point and switch-off point and
enter it in the Fertiliser menu of the ISOBUS software.
Implements without SectionControl:
•
Open shutters at the switch-on point.
•
Close shutters, at the switch-off point.
Switching on point
Switch-off point positive
Switch-off point negative
If direct moving into the tramline of the headlands is desired, it may
be necessary to increase the value for the switch-off point. However
this is not positive for fertiliser distribution on the headlands.
Switch-on point and switch-off point for SectionControl
Presentation of the switch-on
point for SectionControl
Presentation of the positive
switch-off point for
SectionControl
Presentation of the negative
switch-off point for
SectionControl