
Cleaning, maintenance and repairs
110
ZG-
B
BAG0051.5 02.14
12.3
Maintenance schedule – overview
Carry out maintenance work when the first interval is
reached.
The times, continuous services or maintenance intervals of
any third party documentation shall have priority.
Before each start-up
1. Check hoses/tubes and connection pieces for any visually obvi-
ous defects/leaking connections.
2. Repair any areas of chafing on pipes and hoses.
3. Immediately replace worn or damaged hoses and pipes.
4. Immediately repair leaking connections.
After the first working run
Component
Maintenance work
see
page
Workshop work
Wheel nut check
124
X
Wheels
Check for play in the wheel hub
bearing
118
X
Hydraulic system
Check for leak tightness
Check for defective hose lines
126
X
Daily
Component
Maintenance work
see
page
Workshop work
Air reservoir for the air-
pressure brake
Drain the air reservoir
121
Control butterfly valve
Check for ease of movement and
adjust if necessary
Outlet openings
Clean
Agitator
Check for damage
Replace broken safety splints in
the shear-off safety device if
necessary
115
Spreading vanes
Condition check, replace if nec-
essary
112
Hydraulic fluid filter
Check clogging indicator, clean
or replace if necessary
130
X
Electric traffic light kit
Replace defective bulbs
131