3.
Slide the calibration bucket
2
into the guide rails
1
so that the calibration bucket is positioned
underneath the metering unit.
2
1
CMS-I-00006785
4.
Open the calibration flap
1
.
1
CMS-I-00006787
5.
To start the calibration via the TwinTerminal
1
or the calibration button,
refer to the ISOBUS software operating manual,
"Calibration menu"
or
see "control computer" operating manual.
6.
To start the calibration via the control terminal,
refer to the ISOBUS software operating manual,
"Calibration menu"
or
see "control computer" operating manual.
1
CMS-I-00006860
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
88
Содержание Centaya 3000 Special
Страница 6: ......
Страница 31: ...CMS I 00006976 CMS I 00006977 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 25...
Страница 32: ...CMS I 00006978 CMS I 00006984 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 26...
Страница 147: ...3 CMS I 00007038 10 Repairing the implement Lubricating the implement MG7508 EN GB B 1 31 08 2022 AMAZONE 141...
Страница 159: ......