5.
To remove seed residues from the metering unit
housing,
Open the calibration flap
1
.
1
CMS-I-00006787
6.
Loosen the bolts
3
with the socket wrench
1
.
7.
Swivel the bolts to the side.
8.
Take the sliding shutter
2
from its parking
position.
1
3
2
CMS-I-00005255
9.
Push the sliding shutter
2
into the metering unit
housing.
10. Park the socket wrench in the holder
1
.
11.
To empty the metering unit and the metering
roller,
refer to the ISOBUS software operating manual,
"Emptying".
or
see "control computer" operating manual.
2
1
CMS-I-00005259
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
84
Содержание Centaya 3000 Special
Страница 6: ......
Страница 31: ...CMS I 00006976 CMS I 00006977 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 25...
Страница 32: ...CMS I 00006978 CMS I 00006984 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 26...
Страница 147: ...3 CMS I 00007038 10 Repairing the implement Lubricating the implement MG7508 EN GB B 1 31 08 2022 AMAZONE 141...
Страница 159: ......