Alpha InTec 40GS2 - Benchmark Scheme
BENCHMARK SCHEME
To comply with Building Regulations Part L1 (Part 6 in Scotland) the boiler should be installed in accordance
with the manufacturer’s instructions. Self-certification that the boiler has been installed to comply with Building
Regulations can be demonstrated by completing and signing the Benchmark Checklist at the back of these
instructions.
Code of Practice
For the installation, commissioning and servicing of domestic heating and hot water products.
Benchmark places responsibilities on both manufacturers and installers*. The purpose is to ensure that customers** are provided
with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer's
instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. Installers are
required to carry out work in accordance with the following:
Standards of Work
•
Be competent and qualified to undertake the work required.
•
Install, commission, service and use products in accordance with the manufacturer's instructions provided.
•
Ensure that where there is responsibility for design work, the installation is correctly sized and fit for purpose.
•
Meet the requirements of the appropriate Building Regulations. Where this involves notifiable work be a member of a
Competent Persons Scheme or confirm that the customer has notified Local Authority Control (LABC), prior to work
commencing.
•
Complete all relevant sections of the Benchmark Checklist/Service Record when carrying out commissioning or
servicing of a product or system.
•
Ensure that the product or system is left in a safe condition and, where possible, in good working order.
•
Highlight to the customer any remedial or improvement work identified during the course of commissioning or servicing work.
•
Refer to the manufacturer's helpline where assistance is needed.
•
Report product faults and concerns to the manufacturer in a timely manner.
Customer Service
•
Show the customer any identity card that is relevant to the work being carried out prior to commencement or on request.
•
Give a full and clear explanation/demonstration of the product or system and its operation to the customer.
•
Hand over the manufacturer's instructions, including the Benchmark Checklist, to the customer on completion of an installation.
•
Obtain the customer's signature on the Benchmark Checklist to confirm satisfactory demonstration and receipt of
manufacturer's instructions.
•
Advise the customer that regular product servicing is needed, in line with manufacturers' recommendations, to ensure
that safety and efficiency is maintained.
•
Respond promptly to calls from a customer following completion of their work, providing advice and assistance by
phone and, if necessary, visiting the customer.
•
Rectify any installation problems at no cost to the customer during the installer's guarantee period.
* The use of the word "installer" is not limited to installation itself and covers those carrying out installation, commissioning and/or servicing of heating and hot water
products, or the use of supporting products (such as water treatment or test equipment).
** Customer includes householders, landlords and tenants.
Benchmark Commissioning and Servicing Section
It is a requirement that the boiler is installed and commissioned to the manufacturers instructions and the data
fields on the commissioning checklist completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the
installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas Safe registered
engineer who has been trained on the boiler installed. The service details should be recorded on the Benchmark
Service Interval Record and left with the householder.
Useful contact details:
Gas Safe Register
- 0800 408 5577 - www.gassaferegister.co.uk
Alpha Heating Innovation:
General Sales Enquiries - 0344 871 8760
Technical Helpline - 0344 871 8764
www.centralheating.co.uk
Содержание InTec 40GS2
Страница 51: ...51 Alpha InTec 40GS2 Page intentionally Blank...