3
3. Fixing the Programmer to the Wall
Using a small screwdriver press down on the tab at the top of the controller (4) and separate the front control panel from the rear case.
Hold the rear casing in its chosen position level against the wall and mark the fixing holes.
Drill two 5mm holes in the wall, insert the wall plugs provided and fix the rear case to the wall using the 30mm screws.
Connect the boiler data wire to the + and – terminals in the rear casing (hard
wired only).
Re-fit the front control panel, lower the control cover (1) and secure the
control panel using the two 10mm screws provided (3).
Note;
If an RF controller is being used then the data wire is not required but
two AA batteries must be fitted.
Fig 2
Installing the batteries (RF controller only)
Using a small screw driver un-clip the bottom of the battery cover (2) and
remove. Insert two Size AA batteries in the position shown in the back of the
battery compartment and refit the battery cover
Note;
The RF Climatic must not be programmed until the receiver unit is
connected to the boiler and RF communication is established.
Fig 2