m. Special Functions 
 

By pressing the 

MENU

 button, a list of options can be accessed, by pressing the +/- buttons you can scroll through the various options and to 

select press 

OK

.  

 

n. Language 

 

Allows the user to choose between Italian and English. 
 

o. Regult (management of regulation parameters) 

 

This allows you to customise the functioning parameters. 
 
CH MIN allows adjustment of the minimum central heating flow temperature. This value is used to calculate the curves used for the external 
probe. Values that are too high can cause flow temperatures that are too high on average for room central heating. 
 
OFFSET (regulation constant), constant that can be regulated from -15ºC to +15ºC and which in the presence of the optional external probe 
modifies the set flow temperature (see fig 5) set as standard at 0ºC. 
 
NOTE; if the self leaning function is enabled the offset value could be modified automatically. 
 
BUILD (dimension and build inertia), adjustable from 1 to 20, default setting is 10.It establishes the reaction speed of the system depending 
on the type of system present. 

 

Example: 

 

 

AUTO A (self learning), defines the activation of self learning, as per standard set at OFF. This function allows the Climatic remote control to 
vary the offset, adapting it to the room in which it is installed. 

Value System 

Type 

System with little heat inertia e.g. Fan Assisted Radiators 

10 

System with normal inertia e.g. Standard Radiator system 

15 

System with high heat inertia e.g. Under-floor Heating 

Содержание 3.022143

Страница 1: ...Alpha Climatic Programmable Modulating Boiler Energy Manager Part No 3 022144 Hard Wired Part No 3 022143 Radio Frequency Installation and User Instructions...

Страница 2: ...oiler is via a two core cable to the low voltage bus connection for hard wired version or via an integrated RF receiver for the RF version 2 Mounting of the Controller The controller must be mounted i...

Страница 3: ...ar casing hard wired only Re fit the front control panel lower the control cover 1 and secure the control panel using the two 10mm screws provided 3 Note If an RF controller is being used then the dat...

Страница 4: ...talling the receiver RF models only Gain access to the boiler terminal block as described in the boiler installation and service instructions section 4 10 Remove the screws from the fixing posts in th...

Страница 5: ...y 3 Heating Cooling on off temperatures 4 Reset remote settings 5 Programming menu selection 6 Menu selection 7 DHW temperature set 8 CH temperature set 9 Information e g flow temperature 10 Auto Manu...

Страница 6: ...g or cooling Holiday mode Cylinder heating in progress if present Indicates it is possible to adjust a parameter using buttons 11 and 12 Request for DHW 000 000 Describes current status Request for He...

Страница 7: ...lash using the buttons set to the correct day of the week and press OK then ESC to get back to main menu b Set Heating Programme Press the button and TIME will appear press and CH PRG will flash press...

Страница 8: ...p pressing ESC NOTE if four on off periods are not required then set the unused periods on off times the same E g On 23 00 off 23 00 d Setting the Temperature Note There are two temperature settings c...

Страница 9: ...e primary heating water temperature to the user s requirement When the dial is turned the temperature setting is displayed on the screen The primary flow temperature might not reach the temperature se...

Страница 10: ...ler will operate at minimum heating output until the room temperature has been raised to 5 6 C g External Probe optional If an external temperature probe is fitted it is possible to set a flow tempera...

Страница 11: ...value will be displayed e g DHW T 50 C if a value is not present a will be displayed The display of the INFO is subject to the boiler model and the method of connection of the programmer To get return...

Страница 12: ...ontroller or receiver and the boiler ERR TP Climatic Display Error in reading the room temperature or value measured off scale below 0 C or over 50 C E51 Boiler display Communication error between the...

Страница 13: ...t can be regulated from 15 C to 15 C and which in the presence of the optional external probe modifies the set flow temperature see fig 5 set as standard at 0 C NOTE if the self leaning function is en...

Страница 14: ...bottom of the screen This function can be deactivated by pressing the button In the event of remote telephone activation the Climatic controller will revert back to normal operation omitting the holid...

Страница 15: ...to EN 60730 II Protection rating according to EN 60529 IP 20 Connection technique 2 polarised wires Load reserve time 8 hours for hourly count with at least 2 hours of charge Connection cable max leng...

Страница 16: ...on polarised wires Connection cable supplied 280 mm with cable of 2x0 35mm2 Controller Data Dimensions LxHxD 142 x 103 x 31 Power Supply 2 x 1 5 V AA batteries Functioning room temperature 0 40 C Ware...

Страница 17: ...re 25 C Cooling Economy Temperature 40 C Room Temperature in Manual 20 C Anti Freeze 5 0 C Holiday Program HOLIDY OFF Offset OFFSET 0 C Building Inertia BUILD 10 Self Learning AUTO A OFF Room Probe AM...