11
We reserve the right to modify technical specifications without prior notice.
UK830504/210627
© Alpha-InnoTec GmbH
installation of the
ventilation duct
Converting from air blower on the right to
air blower on the left
notICe.
note the air blow-out direction of the
unit.
– By default, the units ship with the air
blower on the right hand side.
Remove top front panel and set it aside on the floor.
While doing so, rotate the front panel by 180° to
protect the capillary…
“manometer”.
CautIon.
pay attention to the manometer capillary.
Remove the side panel on the top left and right by
unscrewing the 2 screws on each side…
CautIon!
Hands and fingers could be crushed during
the following tasks!
•
mount one foot each on the front and back of the
unit…
1 foot
2 lock nut
3 Adjusting screw
•
Slowly and carefully tip the unit back into the
original position…
•
Repeat procedure on the other side of the unit.
place unit at final installation location.
compensate for minor unevenness using the four
adjusting screws and align the unit horizontally.
Then tighten the lock nuts.
Содержание LWC 100
Страница 56: ......