67
in DE: to the Alpha-InnoTec customer service department ................................................................. +49 (0) 9228 9906 199
in AT: to the Alpha-InnoTec customer service department ...................................................................+43 (0) 732 24 42 014
in CH: to the Alpha-InnoTec customer service department .....................................................................+41 (0) 62 748 20 01
In all other countries:
to the manufacturer’s local partner: .......................................................................................................................................
$0.1-&5*0/3&1035"/%3&26&45'03'"$503:$0..*44*0/*/(
During factory commissioning, the system will be inspected to ensure that it is functioning properly. This ensures that all
factory specifications have been checked and that the system can operate reliably over an extended period. The factory
commissioning involves costs and is mandatory for extension of the warranty services.
q
*/*5*"-$0..*44*0/*/(
q
3&1&"5$0..*44*0/*/(
Heat pump type / serial number
Regulator type
$0/53"$503
&/%$6450.&301&3"503
q
electric
q
heating
q
other company
Company
Contact person
Last name
First name
Street address
Street address
Postcode
Head office
Postcode
City
Phone
Phone
Preferred date:
*)
Alternate date:
*)
Date
Time
Date
Time
*) The contractor must submit the completion report
along with the completely reviewed general checklist 14 business
days
prior to the desired date of commission. If there is a conflict with the date, you will be contacted by phone.
I hereby confirm that all preliminary work required for commissioning has been carried out and completed.
The system is ready for operation.
Requested commissioning
Heat pumps up to 33 kW (excluding P Series)
Heat pumps above 33 kW and P Series
IBN (Item.-No. 160 001)
q
IBN P5+
(Item.-No. 160 003)
q
IBN 5+ (Item.-No. 160 002)
q
IBN VP5+ (Item.-No. 160 004)
q
IBN VP EW (Item.-No. 160 005)
q
I, the undersigned, hereby request commissioning in return for a fee.
Invoice to
q
Contractor
q
End customer
/
operator
Location
Date
Name (block letters)
Signature
Company stamp
In the event that the system is not ready for operation and if installation work has to be performed on the system by
the commissioning technician during commissioning, this will involve charges (billed separately) to the contractor. If the
system is not ready for operation, the commissioning technician can request a repeat commissioning, which will involve
additional costs. The contractor or an authorized representative must be present during commissioning.
It is absolutely necessary that the operator is present for the one-time, free instruction that occurs during
commissioning.
A report will be prepared during commissioning.
F
A
Z
W
P
F
o
rm
b
la
tt
D
E
8
2
0
5
2
2
e
We reserve the right to modify technical specifications without prior notice.
UK830502/190901
© Alpha-InnoTec GmbH
Completion report for heat pump systems