15
We reserve the right to modify technical specifications without prior notice.
UK830502/190901
© Alpha-InnoTec GmbH
Install air flow baffles…
r
Suspend air flow baffles on the brass bushings on
the top side of the frame…
1 eyelet on air flow baffle
2 brass bushing on frame
r
Bolt air flow baffles to the frame on the switch cab-
inet side (= operator side) and water connection
side…
Return top cover to frame…
Suspend upper facing panels in the top cover. Bolt
to the frame at bottom…
The air flow baffles are now installed. You can now
carry out mounting and installation work on the
unit, and afterwards attach the lower facing panels.
(see “Electrical connection work”, “Heat pump side
connection of control and sensor wires”) )…
CAUTION.
During extended interruptions in work,
close the unit with the lower facing pan-
els.