2.4 Power Meter
2.4.1 Meter ADL-3000 (If Applicable)
2.4.1.1ADL-3000 (without CT, without meter plug), if applicable:
The power meter should be installed and connected in the distribution box. There are
two kinds of power meters, ADL-3000 and ACR10R, which users can choose from.
ADL-3000: three-phase meter (with or without CT)
ACR10R: three-phase meter with CT
Step 10
After wiring, please open the front cover of HV50056 and turn on the molded case circuit
breaker.
Figure 35 Installation of the front panels
Figure 37 ADL-3000 Connection (without CT, without Meter Plug)
INSTALLATION
INSTALLATION
Note:
Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the Meter port on the
control box.
A PV meter will be applied in an
AC/hybrid system.
23
24