In an AC/Hybrid mode, the Meter 2 status shows YES, which means normal. In a DC
mode, the Meter 2 status shows YES, which means normal. Then EMS can work
normally.
Installers who haven't yet registered need to click “Register” to visit the registration
page. Please refer to “AlphaCloud Online Monitoring Webserver Installers User Manual”,
which you can get from AlphaESS sales and get license number from relevant sales from
Alpha ESS
Log in to your installer account and
choose Storage System Maintenance>
"Install new system" to register new
system at Alpha ESS.
Figure 68 Assembling of the Front Panels
Step 1
Inverter part:
please unscwer the scwews of Bracket A and hang the front
panel of the inverter onto Bracket B. Fix the front panel to Bracket B with scwews.
Battery and control box:
Push the top two guide rods into the housing and press
the buckle from the bottom right in the middle.
4.4 Assembling of the Front Panels
SYSTEM REGISTRATION
05
EMS INTRODUCTION AND SET UP
SYSTEM REGISTRATION
Note:
please assemble the front panel of the inverter at first, then HV50056 and the
batteries.
37
38