B. Output Connection
to Main Switchboard
A PV Breaker (Inverter Supply) must be installed
between the SolShare output and Main Breaker
for each participating unit.
For single-phase meters this should be a single
pole main circuit breaker (MCB), for three-phase
customers this should be a three pole MCB.
Allume recommends these PV breakers be installed
in a location that is easily accessible from the main
switchboard. Ensure these breakers are labeled clearly.
The outputs from the solar must be wired to the
PV Breakers. The outputs of the PV Breakers must
be interconnected on the load side of the unit’s
Main Breaker.
Ensure each output is labelled as per the figure below.
This will help later on in the installation when wiring
the current transformers to each unit.
Important:
Make sure to label both ends of each solar cable.
Area of focus:
Main switchboard
Important:
If connecting only one line of solar to each unit, make sure the solar supplier line alternates between
each unit as shown below.
FROM SOLSHARE
FROM METERS
SERVICE SIDE
1(L1)
1(L1)
2(L2)
1(L2)
3(L3)
2(L1)
3(L1)
4(L1)
4(L4)
2(L2)
3(L2)
4(L2)
TO UNIT
LOAD SIDE
TO UNIT
LOAD SIDE
Warning:
OCPD (Over Current Protective Devices) provided between the AC line and an inverter operating
in parallel with the grid are required to be rated for bi-directional use.