16
Important:
It is recommended to label both ends of each cable with the appropriate tenancy name and SolShare
output name to ensure the correct cable is wired into the correct in the main switchboard.
Important:
For maintenance and troubleshooting purposes, it is recommended to write the dwellings unit’s names
corresponding to each output on the bottom plate of the SolShare (with permanent marker).
Important:
Check the order of the SolShare outputs carefully. The SolShare terminal block is configured to wire
in the order L1-1, L2-1, L1-2, L2-2, L1-3, ... etc. Ensure the connections are connected in this order.
Ensure the switches are labeled clearly and logically.
Warning:
Only one neutral shall be wired out of the SolShare, as shown in the diagram on page 13. Output
neutral and ground must be wired to main neutral bar and main earth bar respectively, located in the
main switchboard.
Warning:
- Ensure the phase of the solar supply correctly matches the phase of the unit’s supply from the grid.
- Additional circuit breakers must be sized to perform overload protection for SolShare output cables.
- The solar system max output must be less than the main circuit breaker rating of every connected unit.
- The neutral for the SolShare must be wired directly to the main neutral bar inside the main switchboard.
The neutral must not be connected to an individual tenancy’s neutral.
- Point of connection of solar should be on the supply side of tenancy main switch unless specified
otherwise by your Project SLD.