background image

6

Important Safety Instructions

   

Warning: The SolShare cover must be opened only after the input and all output circuits are individually disconnected.
Warning: Ensure the SolShare is grounded prior to operation. This product must be connected to a grounded, metal, permanent 

wiring system or an equipment-grounding conductor must be run with the circuit conductors and connected to the equipment 

grounding terminal or lead on the product.
Warning: Opening of the SolShare must only be performed by certified electrician
Caution: The unit must be operated according to the technical specification datasheet provided with the unit
Caution: HEAVY OBJECT – This product has a weight of approximately 38kg. It’s un-boxing and mounting requires 2 people.
Note: The SolShare is Type 4 rated per the UL50E standard. Where used, cable glands should be rated to minimum NEMA 4  

(or IP XX), otherwise the supplied blanking seal to remain.
Note: Use only copper conductors rated for a minimum of 90 degrees Celsius, 194 Fahrenheit.
Note: The symbol        appears at grounding points within the SolShare equipment. This symbol is also used in the manual.

Handling and Safety Instructions

Safety Symbols Information

The following safety symbols are used in this document. Familiarise yourself with the symbols and their meaning before 

installing or operating the system

:

Important

xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx 

Important

xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx 

Warning

xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx 

This symbol denotes a critical safety instruction that must 

be followed to ensure safety of installer and safe operation 

of the SolShare once commissioned. This box is sometimes 

denoted in green to provide further emphasis.

This symbol indicates an instruction which: will ensure 

proper operation of the SolShare once commissioned or 

will help with the installation efficiency. This same box is 

sometimes denoted in green to provide further emphasis. 

This guide is provided to help the installer understand  

the standard SolShare installation procedure.
Installations may vary depending on the existing electrical 

infrastructure and local electrical safety standard. It is the 

responsibility of the electrician to ensure their installation 

meets the local electrical safety standard.

During installation, testing and inspection, adherence to all  

the handling and safety instructions is mandatory. Failure  

to do so may result in injury or loss of life and damage 

to the equipment.

Warning

xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx 

SAVE THESE INSTRUCTIONS. This manual contains important instructions for the SolShare 2P-100A that shall be 

followed during installation and maintenance of the power division control system.

Содержание SolShare 100

Страница 1: ...1 SolShare Installation Manual...

Страница 2: ...itten permission of Allume Energy and end users may not divulge the information contained herein or use this manual for purposes other than those strictly connected with correct use of the equipment A...

Страница 3: ...n B Installation III Electrical connection A Input Output connections B Output connection to main switchboard C Running current transformer tails D Current transformers to SolShare connections E Curre...

Страница 4: ...the past As a result please follow the guidelines in this manual carefully Your system is designed to meet all United States conditions regulations and codes This guide provides the general instructio...

Страница 5: ...on Serial Number Installer name Company SolShare Connection Unit Connected eg Apt 1 Unit B Common light power No connection Unit number 1 L1 2 L2 3 L1 4 L2 5 L1 6 L2 7 L1 8 L2 9 L1 10 L2 Unit Connecti...

Страница 6: ...elf with the symbols and their meaning before installing or operating the system Important xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx Important xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx Warning xxxxx x...

Страница 7: ...ease contact your dealer immediately Carefully check that all of the components have been supplied If anything is missing contact your dealer I What s in the box Mounting bracket Fastener Split curren...

Страница 8: ...ly units The SolShare takes a single split phase input from a grid connected solar inverter s and connects to each participating unit on a single line L1 or L2 to the load side of their Unit Main Swit...

Страница 9: ...serve and operate location 90 Mounted Vertically 90 Mounted Vertically 1200 mm To minimise cabling required the SolShare should be mounted as close to the main switchboard tenancy isolator board as po...

Страница 10: ...s below to mount the brackets and enclosure 1 Firmly secure the mounting brackets to the chosen wall for installation Allume Energy recommend using the provided fasteners to attach the brackets into a...

Страница 11: ...rds and away from you then allow to slide down back into place A Input Output Connections 1 Lift up cover to reveal the lower section of the box where the electrical connections are made INPUT SOLAR O...

Страница 12: ...Main Switch 4 Run output conduits from out glands to Unit Solar Circuit Breakers TO METER PANEL FROM INVERTER PRE EXISTING EARTH CONNECTIONS TO ENCLOSURE Important The Unit Solar Circuit Breakers can...

Страница 13: ...length 14mm Tightening torque 18 lb in 2Nm Earth Connection Please refer to Appendix p19 for Conductor Specification options 1 Run input earth from inverter and connect to the SolShare s earth bar as...

Страница 14: ...output power cables to appropriate length to reach from SolShare output to Unit Solar Circuit Breakers Label both ends of these cables with the unit apmt number 3 Run cables between SolShare and Unit...

Страница 15: ...ure clear labeling in the main switchboard of the location of solar circuit breakers The outputs from the solar must be wired to the solar circuit breakers The outputs of the solar circuit breakers mu...

Страница 16: ...s of the red phase 3 Repeat steps 1 2 for white and blue phase connector blocks 4 Plug each CT connector block into the corresponding socket of the SolShare Important Make sure colours and orientation...

Страница 17: ...re Fasten shut by replacing the 4 screws on the underside of the SolShare that were removed in section III A 1 2 Switch on all solar circuit breakers and unit main switches 3 Switch on inverter main s...

Страница 18: ...orresponds to the solar input Parameter Specification Panel thickness 4 4 5mm CT Hole Diameter 33mm Solar Input Output hole diameter 32mm Flammability rating minimum UL94 HB Temperature rating minimum...

Страница 19: ...OF 55 14 0 COMPRESSION CONNECTORS WITH 1 2 STUD HOLE MAX TONGUE WIDTH OF 44 4 0 BARE COPPER WIRE FROM 14 AWG TO 4 AWG Appendix B Ground Bar Connection Diagram 1 Tightening Torque IN LBS N m Conductor...

Страница 20: ...gths Bent tongue and narrow tongue options are available Diagram 3 Appendix C Terminal Block Connection Connection data Metric US Tightening Torque 2 Nm 18 lb in Conductor Cross Section Stranded min 4...

Страница 21: ...d between the inverter and the building s meter panel It requires no change to their existing smart meter infrastructure or the utility s billing system and is designed to make installation as simple...

Страница 22: ...C Max nominal current per phase 100 A Voltage Range phase to neutral 100 260 VAC Voltage Drop I is nominal current 0 9 002 I Mains frequency range 50 60 Hz Overcurrent rating 30 kA Max input at 240V...

Страница 23: ...This manual is intended for installations in the USA Specifications are subject to changes without advanced notification Allume Energy Ltd www allumeenergy com au info allumeenergy com 61 394 270 005...

Отзывы: