Gland & Conduit Installation
1.
 Select appropriate glands to replace the plugs on the underside of the SolShare. (See Appendix for details)
2.   Replace plugs with input gland and required number of output glands. 

- The number of output glands required will depend on the number of units connected to the SolShare.  

- One gland for every 2 units is recommended. However, fewer glands may be used if cable gauge permits.

3. Run input conduit from inverter to SolShare input (via Solar Main Switch)
4. Run output conduits from out glands to Unit Solar Circuit Breakers

TO METER 

PANEL

FROM  

INVERTER

PRE-EXISTING  

EARTH CONNECTIONS

TO ENCLOSURE

Important

The Unit Solar Circuit Breakers can be mounted on the meter panel or in a separate enclosure adjacent 

to meter panel (as pictured on page 8)

Important

-   No wiring loops of excess conductor length are allowed to be made. Field wiring of all circuits must maintain 

1/4” separation from all other circuits

-  All electrical connections including sensor circuits, made between the Allume Energy SolShare 100 and  

an electrical distribution panel shall be run through conduit or another type of NEC compliant raceway

Содержание SolShare 100

Страница 1: ...1 SolShare Installation Manual...

Страница 2: ...itten permission of Allume Energy and end users may not divulge the information contained herein or use this manual for purposes other than those strictly connected with correct use of the equipment A...

Страница 3: ...n B Installation III Electrical connection A Input Output connections B Output connection to main switchboard C Running current transformer tails D Current transformers to SolShare connections E Curre...

Страница 4: ...the past As a result please follow the guidelines in this manual carefully Your system is designed to meet all United States conditions regulations and codes This guide provides the general instructio...

Страница 5: ...on Serial Number Installer name Company SolShare Connection Unit Connected eg Apt 1 Unit B Common light power No connection Unit number 1 L1 2 L2 3 L1 4 L2 5 L1 6 L2 7 L1 8 L2 9 L1 10 L2 Unit Connecti...

Страница 6: ...elf with the symbols and their meaning before installing or operating the system Important xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx Important xxxxx xxxx xxxx xxx xxxx xx xxxx xxx xxxx Warning xxxxx x...

Страница 7: ...ease contact your dealer immediately Carefully check that all of the components have been supplied If anything is missing contact your dealer I What s in the box Mounting bracket Fastener Split curren...

Страница 8: ...ly units The SolShare takes a single split phase input from a grid connected solar inverter s and connects to each participating unit on a single line L1 or L2 to the load side of their Unit Main Swit...

Страница 9: ...serve and operate location 90 Mounted Vertically 90 Mounted Vertically 1200 mm To minimise cabling required the SolShare should be mounted as close to the main switchboard tenancy isolator board as po...

Страница 10: ...s below to mount the brackets and enclosure 1 Firmly secure the mounting brackets to the chosen wall for installation Allume Energy recommend using the provided fasteners to attach the brackets into a...

Страница 11: ...rds and away from you then allow to slide down back into place A Input Output Connections 1 Lift up cover to reveal the lower section of the box where the electrical connections are made INPUT SOLAR O...

Страница 12: ...Main Switch 4 Run output conduits from out glands to Unit Solar Circuit Breakers TO METER PANEL FROM INVERTER PRE EXISTING EARTH CONNECTIONS TO ENCLOSURE Important The Unit Solar Circuit Breakers can...

Страница 13: ...length 14mm Tightening torque 18 lb in 2Nm Earth Connection Please refer to Appendix p19 for Conductor Specification options 1 Run input earth from inverter and connect to the SolShare s earth bar as...

Страница 14: ...output power cables to appropriate length to reach from SolShare output to Unit Solar Circuit Breakers Label both ends of these cables with the unit apmt number 3 Run cables between SolShare and Unit...

Страница 15: ...ure clear labeling in the main switchboard of the location of solar circuit breakers The outputs from the solar must be wired to the solar circuit breakers The outputs of the solar circuit breakers mu...

Страница 16: ...s of the red phase 3 Repeat steps 1 2 for white and blue phase connector blocks 4 Plug each CT connector block into the corresponding socket of the SolShare Important Make sure colours and orientation...

Страница 17: ...re Fasten shut by replacing the 4 screws on the underside of the SolShare that were removed in section III A 1 2 Switch on all solar circuit breakers and unit main switches 3 Switch on inverter main s...

Страница 18: ...orresponds to the solar input Parameter Specification Panel thickness 4 4 5mm CT Hole Diameter 33mm Solar Input Output hole diameter 32mm Flammability rating minimum UL94 HB Temperature rating minimum...

Страница 19: ...OF 55 14 0 COMPRESSION CONNECTORS WITH 1 2 STUD HOLE MAX TONGUE WIDTH OF 44 4 0 BARE COPPER WIRE FROM 14 AWG TO 4 AWG Appendix B Ground Bar Connection Diagram 1 Tightening Torque IN LBS N m Conductor...

Страница 20: ...gths Bent tongue and narrow tongue options are available Diagram 3 Appendix C Terminal Block Connection Connection data Metric US Tightening Torque 2 Nm 18 lb in Conductor Cross Section Stranded min 4...

Страница 21: ...d between the inverter and the building s meter panel It requires no change to their existing smart meter infrastructure or the utility s billing system and is designed to make installation as simple...

Страница 22: ...C Max nominal current per phase 100 A Voltage Range phase to neutral 100 260 VAC Voltage Drop I is nominal current 0 9 002 I Mains frequency range 50 60 Hz Overcurrent rating 30 kA Max input at 240V...

Страница 23: ...This manual is intended for installations in the USA Specifications are subject to changes without advanced notification Allume Energy Ltd www allumeenergy com au info allumeenergy com 61 394 270 005...

Отзывы: