B. Output Connection
to Main Switchboard
A solar circuit breaker must be installed between the SolShare
output and unit main switch for each participating unit.
For single-phase meters this should be a single pole main
circuit breaker (MCB), for three-phase customers this should
be a three pole MCB.
Ideally these solar circuit breakers should be mounted within
the existing main switchboard. If there is not adequate
space to do this, Allume recommends they be installed in a
location that is easily accessible from the main switchboard.
If positioned seperately, ensure clear labeling in the main
switchboard of the location of solar circuit breakers.
The outputs from the solar must be wired to the solar circuit
breakers. The outputs of the solar circuit breakers must be
wired on the load side of the unit’s main switch.
Ensure each output is labelled as per the figure below. This
will help later on in the installation when wiring the current
transformers to each unit.
Important:
Make sure to label both ends of each solar cable.
Area of focus:
Main switchboard
Important:
Connect only one line of solar to each unit. Make sure the solar supplier line alternates between each unit
as shown below.
FROM SOLAR
FROM GRID
SERVICE SIDE
1(L1)
1(L1)
2(L2)
1(L2)
3(L3)
2(L1)
3(L1)
4(L1)
4(L4)
2(L2)
3(L2)
4(L2)
TO UNIT
LOAD SIDE
TO UNIT
LOAD SIDE
Warning:
OCPD (Over Current Protective Devices) provided between the AC line and an inverter operating in parallel
with the grid are required to be rated for bi-directional use.