terminal #15 (MASTER CLOSE) on the PRIMARY operator to 
terminal #7 (CLOSE) on the SECONDARY operator.  Connect 
terminal #16 (COMMON) on the PRIMARY operator to terminal #16 
(COMMON) on the SECONDARY operator . Dual 1/4" disconnect 
terminals for each input are provided for this purpose.  Use conduit 
SEPARATE from AC power service.   See Figure 15  for the correct 
wiring.  

FINAL INSTALLATION CHECKLIST 

 

1.  Use a voltmeter to assure the  service  voltage  to  the 

operator is 115 VAC.  Connection to 220 VAC service is 
the most common cause of board failure in new 
installations and is NOT COVERED BY WARRANTY! 

2.  No accessory equipment is installed in the control box. 
3.  All wires attached to the 22 position terminal strip on 

the control box are well clear of the motor V-belt and 
the limit switches. 

4. 

The junction box cover is securely fastened. 

 

LEFT- OR RIGHT-HAND INSTALLATIONS

 

The LPX1000 operator can be configured for left- or right-hand gate 
installations.  See Figure 16.  On a normal drive installation, when 
standing inside the gate and facing outwards, if the operator is on the 
right side of the gate, it's a right-hand installation.  If the operator is on 
the left side of the gate, it's a left-hand installation. 

The operator is shipped from the factory configured for right-hand 
installations.  If it is installed in a left-hand installation,  make sure the 

 

NOTICE:  A separate 3-wire (HOT, NEUTRAL and 

GROUND), 115 VAC electrical connection is required 

for each operator in a bi-parting installation 

HIGH VOLTAGE

HARNESS

CONNECTIONS

LEFT HAND

RIGHT-HAND &

LOCATION OF 

LIMITS

Figure 17: Control Board Settings for LH/RH Operation 

 D

: STARTING THE OPERATOR  

12 

110134 

Figure 16:  Left Hand vs. Right Hand Installation 

107033 

Right Hand 

Inside 

Outside 

Inside 

Outside 

Left Hand 

THE MOTOR WIRE CONNECTOR AND THE LIMIT 

HARNESS CONNECTOR MUST BOTH ALWAYS BE IN 

EITHER THE RIGHT OR LEFT POSITIONS.  IF ONE IS 

IN THE RIGHT POSITION AND THE OTHER IN THE 

LEFT POSITION, THE OPERATOR WILL NOT STOP 

THE GATE WHEN IT REACHES THE END OF TRAVEL. 

           W A R N I N G !  

110145 

16

8

7

6

COMMON

STOP

CLOSE

OPEN

BI-PARTING WIRING: PRIMARY/SECONDARY UNITS

SECONDARY OPERATOR

TERMINAL STRIP

TERMINAL STRIP

PRIMARY OPERATOR

16

COMMON

14

15

MASTER OPEN

MASTER CLOSE

Figure 15:  Bi-Parting Wiring 

Содержание LEADER PLUS LPX1000 Series

Страница 1: ...ehicular gate operators READ THIS MANUAL CAREFULLY BEFORE INSTALLATION OR USE SAVE THESE INSTRUCTIONS Serial Date Installed Your Dealer PROVEN CGA2K TECHNOLOGY INSTALLATION AND OWNER S MANUAL LEADER P...

Страница 2: ...ou and your equipment Pay close attention to these boxes as you follow the manual WARNING Indicates a MECHANICAL hazard of INJURY OR DEATH Gives instructions to avoid the hazard CAUTION Indicates a ME...

Страница 3: ...00 control panel provides independent connections for Open and Close non contact photoelectric and contact edge sensors In this way a photoelectric sensor could be utilized to guard the gate area when...

Страница 4: ...CAN BE MINIMIZED BY INSTALLING A MESH SCREEN ON THE GATE It is strongly recommended that the entire gate and adjacent fence area the gate covers when open be meshed or guarded such that a handhold or...

Страница 5: ...RED POWER LIGHT IS NOT LIGHTED HIGH VOLTAGE AC IS STILL PRESENT NEVER LEAVE THE INSTALLATION WITH THE HANDY BOX OR OUTER COVERS REMOVED ALWAYS TURN OFF THE POWER BEFORE ATTEMPTING SERVICE OF EITHER T...

Страница 6: ...ng adjustment to prevent one operator from overloading the other The electrical hookup is made in the junction box located in the left front corner of the frame see Figure 7 Page 7 For conduit placeme...

Страница 7: ...o one detector See Figure 8 above Two different types of installations will usually be encountered 1 If the driveway material is already in place saw cuts will be needed to accommodate the loop wires...

Страница 8: ...INSULATED WIRE WIRE SIZE SHOULD BE 16zGA STRANDED OR LARGER C INSTALLING THE OPERATOR TOOLS REQUIRED The following tools and materials are required for proper installation of the operator 1 Two 3 4 wr...

Страница 9: ...purpose Run flexible conduit from the point where the conduit exits the pad and attach it to the bottom of the right junction box at the front of the frame Review Figure 5 Page 6 If the hook up exits...

Страница 10: ...e operator side wall The actual loop is installed in the concrete or asphalt surface in accordance with the manufacturer s instructions and the information outlined earlier in this manual see Page 7 C...

Страница 11: ...now complete Connect one of the two wires for the relay to terminal 4 RADIO OPEN or terminal 3 ALTERNATE depending on the function desired see descriptions on the chart on page 17 and 18 and the othe...

Страница 12: ...nd facing outwards if the operator is on the right side of the gate it s a right hand installation If the operator is on the left side of the gate it s a left hand installation The operator is shipped...

Страница 13: ...lug it into the connector labeled LEFT HAND Locate the 3 position limit switch wire harness connector midway down on the right side of the controller board Switch it to the position labeled LEFT HAND...

Страница 14: ...nuous signal required to move the gate when in the alarm mode SWITCH 1 ON Gate does not respond to pushbutton input when in the normal mode Continuous signal required to move the gate when in the alar...

Страница 15: ...he Motor Close light stays ON 7 Connect to Terminal 11 Reversing Loop Observe that both Motor lights are ON momentarily and then the Motor Close light goes OUT and the Motor Open light stays ON 8 Conn...

Страница 16: ...re the power to the operator Restart the gate and give the leading edge a firm blow with the heal of your palm Don t stand directly in the gate s path while testing the Overload Force The obstruction...

Страница 17: ...nal for most HOLD OPEN functions Direct input to control system independent of the Loop Sockets Once activated the gate will open fully Activation while the gate is closing will cause it to re open Co...

Страница 18: ...ld be connected here and to terminals 16 COMMON Multiple devices may be connected in parallel NAME DESCRIPTION 12 OPEN EDGE Momentary or continuous signal This input is active only when referenced to...

Страница 19: ...IO OPEN ALTERNATE 16 15 13 14 12 9 10 7 8 5 6 3 4 2 1 24 VAC 24 VAC YEL YEL YEL YEL SOLENOID OPEN LIMIT RH CLOSED LIMIT RH WHT YEL RED LIMIT WIRE CONNECTIONS WHT COM COMMON RED YEL NO TRANSFORMER YEL...

Страница 20: ...and observe that the REVERSING LOOP light comes ON the operator control board and the gate reopens 2 FREE EXIT VEHICLE DETECTOR Pre test Test the vehicle detector independently using the presence lamp...

Страница 21: ...e or other need to move the gate manually without disconnecting the operator chain Take off the operator cover by first removing any lock attached to the lock tab on the operator front then lift the c...

Страница 22: ...ers for exposed rollers Each safety feature is a separate component in your gate system Read and follow all instructions for each of the components of your unique system Ensure that all instructions f...

Страница 23: ...hanical problems on the gate and gate hardware before installing the gate operator Have a qualified service technician make repairs to the gate and gate hardware AVOID ENTRAPMENT Stay away from the pa...

Страница 24: ...from the date of purchase for multi family and commercial use To obtain service contact your dealer To obtain service under this warranty the buyer must obtain authorization instructions for the retu...

Отзывы: