background image

6

THE CONCRETE OPERATOR PAD 

Installation requires the presence of a suitable concrete pad as a base for 
the operator.  The dimensions of this pad should be sufficient to allow 
at least 6" of clearance from each edge of the pad to the nearest 
operator mounting hole.  The top of the pad should be 3" above grade to 
raise the operator above any standing water, while the depth of the pad 
below grade is dependent on the weight and size of the gate and the soil 
conditions at the site of the installation.  The LP1000 cover is 24" high 
and is removed by lifting it vertically off the operator.  THE SITE FOR 
THE OPERATOR SHOULD BE CHOSEN WITH AT LEAST 24" OF 
CLEARANCE ABOVE THE TOP OF THE UNIT.  

If no suitable concrete base exists, a pad must be poured.  See Figures 5 

and 6 for plans for this pad.  Consult local building codes for depth of 
base.  Typical depths range from 24 to 36 inches.  In either case, if 
vehicles are going to be operated in the vicinity of the operator, 
consider installation of protection posts in front of the operator.   

If a suitable concrete base already exists for mounting the operator it 

will be necessary only to drill mounting holes for the LP1000.  3/4" 
mounting holes are located on each side of the operator.  Four redhead 
bolts, 3/8" or 1/2" in diameter, should be used for mounting the 
operator.  The bolt pattern for the LP1000 is 12-3/16" wide by 12-1/4" 
long. The two rear bolts, (closest to the gate), should be no closer than 
5-1/2" from the near side of the gate to allow sufficient clearance for 
the operator's cover.  The rear bolts should also be no farther than 7-
1/2" from the gate if the chain brackets provided with the operator are 
to be used. 

ELECTRICAL POWER REQUIREMENTS 

NOTE:    Before  connecting  the  operator,  use  a  voltmeter  to                 
insure that the electrical service is 115 VAC.  Connection to 220 
VAC service is the most common cause of board failure in new 
installations and is NOT covered by the warranty. 

The LP1000 requires a 3-wire (Hot, Common, Ground), 115 VAC, 
electrical circuit with a 15 Amp breaker for proper operation.  In 
installations with more than one operator, each operator must have a 
separate service from the breaker panel.  Powering multiple operators 
from the same service can result in having to "de-sensitize" the 
obstruction sensing adjustment to prevent one operator from 
overloading the other.  The electrical hookup is made in the junction 
box located in the left front corner of the frame.  See Figure 7, Page 7. 

Figure 5:  Pad Configuration 

106713 

Figure 6:  Operator Footprint 

106724 

               

 WARNING! 

AVOID ELECTROCUTION:  

DO NOT ROUTE LOW VOLTAGE WIRES IN SAME 

CONDUIT AS HIGH VOLTAGE WIRES.  FOLLOW 

ALL LOCAL ELECTRICAL CODES OR THE 

NATIONAL ELECTRICAL CODE.  

WIRE SIZE 

NOMINAL DISTANCE 

#14 

100’ 

#12 

150’ 

#10 

250’ 

#8 

400’ 

#6 

600’ 

#4 

1000’ 

#2 

1600’ 

Figure 6a:  Parallel Placement 

104883 

 B

: PREPARING THE SITE 

Содержание LEADER PLUS LP1000

Страница 1: ...rements for Vehicular gate operators LEADER PLUS Model LP1000 Heavy Duty Vehicular Slide Gate Operator READ THIS MANUAL CAREFULLY BEFORE INSTALLATION OR USE SAVE THESE INSTRUCTIONS 107063 Serial Date...

Страница 2: ...there to protect you and your equipment Pay close attention to these boxes as you follow the manual WARNING Indicates a MECHANICAL hazard of INJURY OR DEATH Gives instructions to avoid the hazard CAU...

Страница 3: ...TE TESTED ON THE LOG LOCATED ON PAGE 2 OF THIS MANUAL See Figure 1 pg 2 Connections for External Entrapment Prevention Sensors Because all gate system installations are different the LP1000 control pa...

Страница 4: ...IAL HAZARD CAN BE MINIMIZED BY INSTALLING A MESH SCREEN ON THE GATE Allstar strongly recommends the entire gate and adjacent fence area the gate covers when open be meshed or guarded such that a handh...

Страница 5: ...be exposed EVEN IF THE RED POWER LIGHT IS NOT LIGHTED HIGH VOLTAGE AC MAY STILL BE PRESENT ON TERMINALS L1 AND L2 NEVER LEAVE THE INSTALLATION WITH THE CONTROL BOX COVER REMOVED x ALWAYS TURN OFF THE...

Страница 6: ...tor The bolt pattern for the LP1000 is 12 3 16 wide by 12 1 4 long The two rear bolts closest to the gate should be no closer than 5 1 2 from the near side of the gate to allow sufficient clearance fo...

Страница 7: ...ol wires MUST NEVER be routed in the same conduit as A C power wires Always consult and follow all local electrical codes 106728 Figure 8 Chain Configuration Normal Drive Figure 7 Service Conduits 106...

Страница 8: ...d in wires need not be in PVC but must have at least six 6 twists per running foot For a saw cut installation observe the method recommended in Figurez10 for the corners When installing a two loop rev...

Страница 9: ...with the operator in place Before inserting the remaining redhead bolts make sure the operator is sitting level If any corners of the operator are resting above the pad slide flat washers under the op...

Страница 10: ...100 OHMS resistance and for more than 100 milliseconds duration Two of the inputs ALTERNATE and RADIO OPEN are momentary inputs where the signal must be released and re entered to be recognized The r...

Страница 11: ...parate from the receiver s output connection This is necessary as the LP1000 control board 24 VAC is isolated from chassis ground A 3 prong receiver CANNOT be installed in association with the LP1000...

Страница 12: ...factory configured for right hand installations If it is installed in a left hand installation make sure the main power switch is off and locate the 8 pin motor wire connector in the upper center of t...

Страница 13: ...limit nut two more slots to give the operator time to stop the gate after the limit switch has been activated Release the detent plate and make sure it drops into the slots on both limit nuts Manually...

Страница 14: ...he test mode the operator control board changes to a sleep mode and a low pulsed tone is heard from the audible output You can reset the operator for a renewed 20 test cycles by turning the power off...

Страница 15: ...rol board of the LP1000 operator See Figure 22 These lights are used to verify proper operation of the LP1000 TURN ON THE MAIN POWER SWITCH Remove the white high voltage connector from the control boa...

Страница 16: ...lots in either direction to fine tune the gate s limits of travel When final adjustment has been completed insure that the detent plate is firmly seated in the slots Review Figure 18 Page 13 SETTING T...

Страница 17: ...operator should respond to an obstruction not encountered by the other the gates will temporarily get out of sync Synchronization will be restored after the next input command cycle D STARTING THE OPE...

Страница 18: ...to terminals 3 or 13 COMMON Multiple devices may be connected in parallel NAME DESCRIPTION 12 OPEN EDGE Momentary or continuous signal This input is active only when referenced to the opening directi...

Страница 19: ...19 D STARTING THE OPERATOR Figure 23 Wiring Schematic and Diagram 110146...

Страница 20: ...or Close Contact Sensor input or a Close Overload activation will cause the gate to stop pause and reverse for approximately 2 inches in the Open direction xIf the gate is moving in a Close direction...

Страница 21: ...ollowing safety features x Electric gate edges x Enclosed tracks x Vertical guard posts x Protective screen mesh x Photoelectric sensors x Instructional and precautionary signs x Covers for exposed ro...

Страница 22: ...mpensate for a poorly operating slide gate Correct all mechanical problems on the gate and gate hardware before installing the gate operator Have a qualified service technician make repairs to the gat...

Страница 23: ...r 2 EA not shown 110136 Installation Owner s Manual 1 EA 24b 111886 Box Cover 4 x 2 Duplex Raised 1 EA OPERATOR EXPLODED VIEW 110153 OPERATOR PARTS LIST RISK OF ELECTROCUTION TURN OFF THE MAIN POWER S...

Страница 24: ...purchase for multi family and commercial use To obtain service contact your dealer To obtain service under this warranty the buyer must obtain authorization instructions for the return of any goods f...

Отзывы: