2
Pre-Installation Notes.............................................. 3
Operator Class Designation ............................ 3
Section A: Gate System Design/Installation......... 4
Section B: Preparing the Site ................................ 6
The Concrete Operator Pad............................. 6
Electrical Power Requirements ...................... 6
Attaching the Chain Bracket ........................... 7
Placing the Vehicle Detector Loops................ 8
Section C: Installing the Operator......................... 9
Placing the Leader ........................................... 9
Electrical
Hookup ............................................. 9
Accessory Equipment Hookup ......................10
Bi-Parting
Application.....................................11
Wiring
Diagram................................................19
Terminal Strip Reference Chart............. 17 & 18
Section D: Starting the Operator ..........................12
Left or Right Hand Installations .....................12
TABLE OF CONTENTS
W A R N I N G H I G H V O L T A G E
ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR
PERIODICALLY TEST SENSITIVITY OF OVERLOAD
*** READ MANUAL ***
DATES
OPERATOR
DATE TESTED
DATE TESTED
DATE TESTED
DATE TESTED
SERVICED
LOG DATE OVERLOAD TEST
READ THESE STATEMENTS CAREFULLY AND FOLLOW THE
INSTRUCTIONS CLOSELY.
The Warning and Caution boxes throughout this manual are there to protect you and
your equipment. Pay close attention to these boxes as you follow the manual.
WARNING
Indicates a MECHANICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
CAUTION
Indicates a MECHANICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
Indicates an ELECTRICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
WARNING
Indicates an ELECTRICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
CAUTION
Setting the Limit Switches ............................. 13
Setting the Obstruction Detection................. 14
Setting the Switch Selectable Options ......... 14
No Load Test Mode ........................................ 14
Indicator
Lamps.............................................. 15
Final Setting of Limit Switches...................... 16
Setting the Close Timer ................................. 16
Final Setting - Obstruction Detection ........... 16
Testing the Operator Lock ............................. 16
Maximum Run Timer ...................................... 17
Final Setting - Bi-Parting Installation ........... 17
Section E: Auxiliary Equipment........................... 20
Section F: End User Instructions ......................... 20
Operational Guide for the End User.............. 20
Safety Guide for the End User ...............21 & 22
Leader Exploded View & Parts List ...................... 23
Technical Specifications ....................................... 24
Figure 1