The AWG wire size for the electrical 
service depends on the distance of the 
operator from the breaker panel.  Refer to 
the table below to determine the correct 
wire size.  The NOMINAL column is the 
ideal distance from the breaker panel to the 
operator for a given wire size.  The 
distances shown in the NOMINAL column 
should never be exceeded.  For distances 
greater than 1600', it is recommended that 
your local utility be contacted to install a 
service feeder for the installation. 

Wiring from external controls such as guard 
shack, telephone entry, keypad or card 
reader systems should be brought to the 
operator by a conduit separate from the 115
VAC electrical hookup.  Low voltage 
control wires MUST NEVER be routed in 
the same conduit as A.C. power wires.  
Always consult and follow all local 
electrical codes. 

106728 

Figure 8: Chain Configuration - Normal Drive 

Figure 7:  Service Conduits 

106736 

ATTACHING THE CHAIN BRACKET 

The chain brackets provided with the LP1000 operator should be 
mounted on the the gate with the centerline of the slot 8" above the top 
of the operator pad.  Attach one end of the chain to the gate and thread 
the other end through the idler pulleys and drive sprocket.  Attach the 
free end to the bracket on the gate and tension the chain.  You will 
normally require a welder, or an electric drill with a 3/8" bit, for 
attaching the chain brackets to the gate.   See Figures  8 and 9. 

106729 

Figure 9: Chain Configuration - Back Drive 

B

: PREPARING THE SITE 

NOTICE:  The Installer is responsible for guarding the 

post mounted Idler Sprocket in back drive installations. 

Содержание LEADER PLUS LP1000

Страница 1: ...rements for Vehicular gate operators LEADER PLUS Model LP1000 Heavy Duty Vehicular Slide Gate Operator READ THIS MANUAL CAREFULLY BEFORE INSTALLATION OR USE SAVE THESE INSTRUCTIONS 107063 Serial Date...

Страница 2: ...there to protect you and your equipment Pay close attention to these boxes as you follow the manual WARNING Indicates a MECHANICAL hazard of INJURY OR DEATH Gives instructions to avoid the hazard CAU...

Страница 3: ...TE TESTED ON THE LOG LOCATED ON PAGE 2 OF THIS MANUAL See Figure 1 pg 2 Connections for External Entrapment Prevention Sensors Because all gate system installations are different the LP1000 control pa...

Страница 4: ...IAL HAZARD CAN BE MINIMIZED BY INSTALLING A MESH SCREEN ON THE GATE Allstar strongly recommends the entire gate and adjacent fence area the gate covers when open be meshed or guarded such that a handh...

Страница 5: ...be exposed EVEN IF THE RED POWER LIGHT IS NOT LIGHTED HIGH VOLTAGE AC MAY STILL BE PRESENT ON TERMINALS L1 AND L2 NEVER LEAVE THE INSTALLATION WITH THE CONTROL BOX COVER REMOVED x ALWAYS TURN OFF THE...

Страница 6: ...tor The bolt pattern for the LP1000 is 12 3 16 wide by 12 1 4 long The two rear bolts closest to the gate should be no closer than 5 1 2 from the near side of the gate to allow sufficient clearance fo...

Страница 7: ...ol wires MUST NEVER be routed in the same conduit as A C power wires Always consult and follow all local electrical codes 106728 Figure 8 Chain Configuration Normal Drive Figure 7 Service Conduits 106...

Страница 8: ...d in wires need not be in PVC but must have at least six 6 twists per running foot For a saw cut installation observe the method recommended in Figurez10 for the corners When installing a two loop rev...

Страница 9: ...with the operator in place Before inserting the remaining redhead bolts make sure the operator is sitting level If any corners of the operator are resting above the pad slide flat washers under the op...

Страница 10: ...100 OHMS resistance and for more than 100 milliseconds duration Two of the inputs ALTERNATE and RADIO OPEN are momentary inputs where the signal must be released and re entered to be recognized The r...

Страница 11: ...parate from the receiver s output connection This is necessary as the LP1000 control board 24 VAC is isolated from chassis ground A 3 prong receiver CANNOT be installed in association with the LP1000...

Страница 12: ...factory configured for right hand installations If it is installed in a left hand installation make sure the main power switch is off and locate the 8 pin motor wire connector in the upper center of t...

Страница 13: ...limit nut two more slots to give the operator time to stop the gate after the limit switch has been activated Release the detent plate and make sure it drops into the slots on both limit nuts Manually...

Страница 14: ...he test mode the operator control board changes to a sleep mode and a low pulsed tone is heard from the audible output You can reset the operator for a renewed 20 test cycles by turning the power off...

Страница 15: ...rol board of the LP1000 operator See Figure 22 These lights are used to verify proper operation of the LP1000 TURN ON THE MAIN POWER SWITCH Remove the white high voltage connector from the control boa...

Страница 16: ...lots in either direction to fine tune the gate s limits of travel When final adjustment has been completed insure that the detent plate is firmly seated in the slots Review Figure 18 Page 13 SETTING T...

Страница 17: ...operator should respond to an obstruction not encountered by the other the gates will temporarily get out of sync Synchronization will be restored after the next input command cycle D STARTING THE OPE...

Страница 18: ...to terminals 3 or 13 COMMON Multiple devices may be connected in parallel NAME DESCRIPTION 12 OPEN EDGE Momentary or continuous signal This input is active only when referenced to the opening directi...

Страница 19: ...19 D STARTING THE OPERATOR Figure 23 Wiring Schematic and Diagram 110146...

Страница 20: ...or Close Contact Sensor input or a Close Overload activation will cause the gate to stop pause and reverse for approximately 2 inches in the Open direction xIf the gate is moving in a Close direction...

Страница 21: ...ollowing safety features x Electric gate edges x Enclosed tracks x Vertical guard posts x Protective screen mesh x Photoelectric sensors x Instructional and precautionary signs x Covers for exposed ro...

Страница 22: ...mpensate for a poorly operating slide gate Correct all mechanical problems on the gate and gate hardware before installing the gate operator Have a qualified service technician make repairs to the gat...

Страница 23: ...r 2 EA not shown 110136 Installation Owner s Manual 1 EA 24b 111886 Box Cover 4 x 2 Duplex Raised 1 EA OPERATOR EXPLODED VIEW 110153 OPERATOR PARTS LIST RISK OF ELECTROCUTION TURN OFF THE MAIN POWER S...

Страница 24: ...purchase for multi family and commercial use To obtain service contact your dealer To obtain service under this warranty the buyer must obtain authorization instructions for the return of any goods f...

Отзывы: