507276-03
Page 36 of 59
Issue 1621
Condensate line must slope downward away from the trap
to drain. If drain level is above condensate trap, condensate
pump must be used. Condensate drain line should be routed
within the conditioned space to avoid freezing of condensate
and blockage of drain line. If this is not possible, a heat
cable kit may be used on the condensate trap and line.
Heating cable kit is available in various lengths; 6 ft. (1.8
m) - kit no. 26K68; 24 ft. (7.3 m) - kit no. 26K69; and 50 ft.
(15.2 m) - kit no. 26K70.
Figure 52
Unit with Cooling Coil
Figure 53
Condensate Trap Locations
* Piping from furnace must slope down a minimum of 1/4” per ft. toward trap.
Figure 51
Condensate Trap Locations
(Unit shown in upflow position with remote trap)
* Piping from furnace must slope down a minimum of 1/4” per ft. toward trap.
A separate drain line must be run to the drain from the
condensate trap to ensure proper drainage and pressure
switch operation. DO NOT connect the condensate trap
drain into the drain line from the evaporator coil.
CAUTION
Do not use copper tubing or existing copper condensate
lines for drain line.
CAUTION
Содержание 95G1UHE
Страница 3: ...507276 03 Page 3 of 59 Issue 1621 EXPANDED VIEW Figure 1 ...
Страница 22: ...507276 03 Page 22 of 59 Issue 1621 Figure 25 Figure 26 ...
Страница 28: ...507276 03 Page 28 of 59 Issue 1621 Figure 34 ...
Страница 38: ...507276 03 Page 38 of 59 Issue 1621 Figure 57 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 40: ...507276 03 Page 40 of 59 Issue 1621 Figure 59 Figure 60 ...
Страница 44: ...507276 03 Page 44 of 59 Issue 1621 TYPICAL WIRING DIAGRAM Figure 65 ...
Страница 57: ...507276 03 Page 57 of 59 Issue 1621 Start Up Performance Check List ...