507276-03
Page 13 of 59
Issue 1621
Suspended Installation of Horizontal Unit
This furnace may be installed in either an attic or a crawl
space. Either suspend the furnace from roof rafters or floor
joists, as shown in Figure 19, or install the furnace on a
platform, as shown in Figure 20. A horizontal suspension
kit (51W10) may be ordered from your distributor or use
equivalent.
NOTE:
When the furnace is installed on a platform or with
the horizontal suspension kit in a crawl space, it must be
elevated enough to avoid water damage, accommodate
drain trap and to allow the evaporator coil to drain.
Platform Installation of Horizontal Unit
1. Select location for unit keeping in mind service and other
necessary clearances. See Figure 18.
2. Construct a raised wooden frame and cover frame with a
plywood sheet. If unit is installed above finished space,
fabricate an auxiliary drain pan to be installed under unit.
Set unit in drain pan as shown in Figure 20. Leave 8
inches for service clearance below unit for condensate
trap.
3. Provide a service platform in front of unit. When
installing the unit in a crawl space, a proper support
platform may be created using cement blocks.
4. Route auxiliary drain line so that water draining from
this outlet will be easily noticed by the homeowner.
5. If necessary, run the condensate line into a condensate
pump to meet drain line slope requirements. The pump
must be rated for use with condensing furnaces. Protect
the condensate discharge line from the pump to the
outside to avoid freezing.
6. Continue with exhaust, condensate and intake piping
installation according to instructions.
Typical Horizontal Application
Figure 19
This furnace can be installed in horizontal applications with
either right or left hand air discharge.
Refer to Figure 18 for clearances in horizontal applications.
NOTE:
Heavy-gauge sheet metal straps may be used to
suspend the unit from roof rafters or ceiling joists. When
straps are used to suspend the unit in this way, support
must be provided for both the ends. The straps must not
interfere with the plenum or exhaust piping installation.
Cooling coils and supply and return air plenums must
be supported separately.
Figure 18
Horizontal Application
Installation Clearances
d
n
E
t
h
g
i
R
d
n
E
t
f
e
L
Right−Hand Discharge
Left−Hand Discharge
Top
Bottom (Floor)**
Bottom (Floor)**
d
n
E
t
h
g
i
R
d
n
E
t
f
e
L
Air
Flow
Air
Flow
Air
Flow
Air
Flow
Top
0
Front*
0
Back
0
Ends
0
Vent
0
Floor
0
‡
* Front clearance in alcove installation must be 24 in. (610 mm).
Maintain a minimum of 24 in. (610 mm) for front service access.
**An 8" service clearance must be maintained below the unit to provide
for servicing of the condensate trap.
‡
For installations on a combustible floor, do not install the furnace directly
on carpeting, tile or other combustible materials other than wood
flooring.
Содержание 95G1UHE
Страница 3: ...507276 03 Page 3 of 59 Issue 1621 EXPANDED VIEW Figure 1 ...
Страница 22: ...507276 03 Page 22 of 59 Issue 1621 Figure 25 Figure 26 ...
Страница 28: ...507276 03 Page 28 of 59 Issue 1621 Figure 34 ...
Страница 38: ...507276 03 Page 38 of 59 Issue 1621 Figure 57 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 40: ...507276 03 Page 40 of 59 Issue 1621 Figure 59 Figure 60 ...
Страница 44: ...507276 03 Page 44 of 59 Issue 1621 TYPICAL WIRING DIAGRAM Figure 65 ...
Страница 57: ...507276 03 Page 57 of 59 Issue 1621 Start Up Performance Check List ...