507270-03
Page 36 of 60
Issue 1621
When combining the furnace and evaporator coil
drains together, the A/C condensate drain outlet must
be vented to relieve pressure in order for the furnace
pressure switch to operate properly.
IMPORTANT
Figure 52
Condensate Trap with Optional Overflow Switch
Figure 53
Evaporator Coil Using a Common Drain
Figure 54
* Piping from furnace must slope down a minimum of 1/4” per ft. toward trap.
Evaporator Coil Using a Common Drain
(Unit shown in horizontal left-hand discharge position)
Содержание 92G1UH-P
Страница 3: ...507270 03 Page 3 of 60 Issue 1621 EXPANDED VIEW Figure 1 ...
Страница 22: ...507270 03 Page 22 of 60 Issue 1621 Figure 26 Figure 25 ...
Страница 26: ...507270 03 Page 26 of 60 Issue 1621 Figure 31 ...
Страница 27: ...507270 03 Page 27 of 60 Issue 1621 Figure 32 ...
Страница 29: ...507270 03 Page 29 of 60 Issue 1621 Figure 36 ...
Страница 30: ...507270 03 Page 30 of 60 Issue 1621 Figure 37 ...
Страница 37: ...507270 03 Page 37 of 60 Issue 1621 Figure 55 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 39: ...507270 03 Page 39 of 60 Issue 1621 Figure 58 Figure 57 ...
Страница 40: ...507270 03 Page 40 of 60 Issue 1621 Table 10 ...
Страница 43: ...507270 03 Page 43 of 60 Issue 1621 TYPICAL WIRING DIAGRAM Figure 63 ...
Страница 50: ...507270 03 Page 50 of 60 Issue 1621 ...
Страница 51: ...507270 03 Page 51 of 60 Issue 1621 ...
Страница 52: ...507270 03 Page 52 of 60 Issue 1621 BLOWER DATA A95UH1D 95F1UHD ...
Страница 53: ...507270 03 Page 53 of 60 Issue 1621 ...