NOTE:
If necessary the condensate trap may be installed
up to 5’ away from the furnace. Use PVC pipe to connect
trap to furnace condensate outlet. Piping from furnace must
slope down a minimum of 1/4” per ft. toward trap.
1. Determine which side condensate piping will exit the
unit, location of trap, field-provided fittings and length
of PVC pipe required to reach available drain.
2. Use a large flat head screw driver or an 1/2” drive socket
extension and remove plug (Figure 48) from the cold
end header box at the appropriate location on the side
of the unit. Install provided 3/4 NPT street elbow fitting
into cold end header box. Use Teflon tape or appropriate
pipe dope.
3. Install the cap over the clean out opening at the base
of the trap. Secure with clamp. See Figure 55.
4. Install drain trap using appropriate PVC fittings, glue
all joints. Glue the provided drain trap as shown in
Figure 55. Route the condensate line to an open drain.
Condensate line must maintain a 1/4” downward slope
from the furnace to the drain.
Do not use copper tubing or existing copper condensate
lines for drain line.
CAUTION
Condensate Piping
This unit is designed for either right or left side exit of
condensate piping in upflow applications. In horizontal
applications, the condensate trap must extend below the
unit. An 8” service clearance is required for the condensate
trap.
Refer to Figures 48 and 49 for condensate trap locations.
Figure 55 shows trap assembly using 1/2” PVC or 3/4” PVC.
5. Install field provided vent on trap assembly as shown
in Figures 49 through 54. Trap must extend at least
1” above the furnace condensate drain connection in
upflow applications and 4-1/2” above the bottom of the
cabinet in horizontal applications.
6. If unit will be started immediately upon completion of
installation, prime trap per procedure outlined in Unit
Start-Up section.
Figure 48
Содержание 92G1UH-P
Страница 3: ...507270 03 Page 3 of 60 Issue 1621 EXPANDED VIEW Figure 1 ...
Страница 22: ...507270 03 Page 22 of 60 Issue 1621 Figure 26 Figure 25 ...
Страница 26: ...507270 03 Page 26 of 60 Issue 1621 Figure 31 ...
Страница 27: ...507270 03 Page 27 of 60 Issue 1621 Figure 32 ...
Страница 29: ...507270 03 Page 29 of 60 Issue 1621 Figure 36 ...
Страница 30: ...507270 03 Page 30 of 60 Issue 1621 Figure 37 ...
Страница 37: ...507270 03 Page 37 of 60 Issue 1621 Figure 55 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 39: ...507270 03 Page 39 of 60 Issue 1621 Figure 58 Figure 57 ...
Страница 40: ...507270 03 Page 40 of 60 Issue 1621 Table 10 ...
Страница 43: ...507270 03 Page 43 of 60 Issue 1621 TYPICAL WIRING DIAGRAM Figure 63 ...
Страница 50: ...507270 03 Page 50 of 60 Issue 1621 ...
Страница 51: ...507270 03 Page 51 of 60 Issue 1621 ...
Страница 52: ...507270 03 Page 52 of 60 Issue 1621 BLOWER DATA A95UH1D 95F1UHD ...
Страница 53: ...507270 03 Page 53 of 60 Issue 1621 ...