![Allied 95G1DFE Скачать руководство пользователя страница 1](http://html.mh-extra.com/html/allied/95g1dfe/95g1dfe_installation-instructions-manual_2901744001.webp)
507277-02
Page 1 of 52
Issue 1621
This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in
manuals, be alert to the potential for personal injury or death.
This manual must be left with the homeowner for future reference.
INSTALLATION INSTRUCTIONS
A95DF1E & 95G1DFE
Warm Air Gas Furnace
Downflow Air Discharge
TABLE OF CONTENTS
Manufactured By
Allied Air Enterprises LLC
A Lennox International, Inc. Company
215 Metropolitan Drive
West Columbia, SC 29170
As with any mechanical equipment, personal injury can
result from contact with sharp sheet metal edges. Be
careful when you handle this equipment.
CAUTION
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, personal
injury or loss of life. Installation and service must
be performed by a licensed professional installer (or
equivalent), service agency or the gas supplier.
WARNING
(P) 507277-02
*P507277-02*
Unit Dimensions .............................................................. 2
A95DF1E & 95G1DFE Parts Arrangement...................... 3
Gas Furnace .................................................................... 4
Shipping and Packing List ............................................... 4
Safety Information ........................................................... 4
Use of Furnace as Construction Heater .......................... 5
General ............................................................................ 6
Combustion, Dilution & Ventilation Air ............................. 6
Setting Equipment ........................................................... 9
Filters ............................................................................. 12
Duct System .................................................................. 12
Pipe & Fittings Specifications
........................................ 12
Joint Cementing Procedure ........................................... 14
Venting Practices ........................................................... 14
Vent Piping Guidelines .................................................. 15
Gas Piping ..................................................................... 30
Electrical ........................................................................ 33
Unit Start-Up .................................................................. 36
Gas Pressure Adjustment .............................................. 38
High Altitude Information ............................................... 38
Other Unit Adjustments.................................................. 41
Blower Motor Performance ............................................ 42
Service........................................................................... 43
Planned Service ............................................................ 45
Diagnostic Codes .......................................................... 45
Repair Parts List ............................................................ 50
Start-Up & Performance Check List .............................. 51
Содержание 95G1DFE
Страница 29: ...507277 02 Page 29 of 52 Issue 1621 Figure 43 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 35: ...507277 02 Page 35 of 52 Issue 1621 Typical Wiring Diagram Figure 50 For A95DF1E 95G1DFE ...
Страница 46: ...507277 02 Page 46 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation ...
Страница 47: ...507277 02 Page 47 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation continued ...
Страница 48: ...507277 02 Page 48 of 52 Issue 1621 Troubleshooting Cooling Sequence of Operation ...
Страница 49: ...507277 02 Page 49 of 52 Issue 1621 Troubleshooting Continuous Fan Sequence of Operation ...