2.
After opening is cut, set the combustible flooring base
into opening.
3. Check fiberglass strips on the combustible flooring base
to make sure they are properly glued and positioned.
4.
Lower supply air plenum into the combustible flooring
base until plenum flanges seal against fiberglass strips.
er opening is
NOTE:
Be careful not to damage fiberglass strips. Check
for
a
tight seal.
5. Set the furnace over the plenum.
6. Ensure that the seal between the furnace and plenum
is adequate.
Installation on Cooling Coil Cabinet (Figure 16)
NOTE:
Downflow combustible flooring kit is not used.
1.
Refer to reverse-flow coil installation instructions for
correctly sized opening in floor and installation of
cabinet.
2. When cooling cabinet is in place, set and secure the
furnace according to the instructions that are provided
with the cooling coil. Secure the furnace to the cabinet.
3. Seal the cabinet and check for air leaks.
Return Air Opening - Downflow Units
Return air may be brought in only through the top opening of
a furnace installed in the downflow position. The following
steps should be taken when installing plenum:
1. Bottom edge of plenum should be flanged with a
hemmed edge (See Figure 17 or 18).
2. Sealing strips should be used to ensure an airtight seal
between the cabinet and the plenum.
3. In all cases, plenum should be secured to top of furnace
using sheet metal screws.
4. Make certain that an adequate seal is made.
Combustible Flooring Base Opening Size
Table 2
Cabinet
Width
Catalog
Number
Front to Rear
Side to Side
in.
mm
in.
mm
B Cabinet
(17.5")
11M60
22
559
18 − 3/4
476
C Cabinet
(21")
11M61
22
559
22 − 3/4
578
Figure 16
COOLING COIL
PLENUM
PROPERLY
SIZED FLOOR
OPENING
FURNACE
Figure 17
SECURE FROM
OUTSIDE CABINET
PLENUM
(Field Provided)
SEALING STRIP
(Field Provided)
Side View
CABINET
SIDE PANEL
Figure 18
SECURE FROM
INSIDE CABINET
PLENUM
(Field Provided)
SEALING STRIP
(Field Provided)
Side View
CABINET
SIDE PANEL
Figure 15
FURNACE
SUPPLY AIR
PLENUM
COMBUSTIBLE
FLOORING BASE
PROPERLY
SIZED FLOOR
OPENING
FLOORING
COMBUSTIBLE
Содержание 95G1DFE
Страница 29: ...507277 02 Page 29 of 52 Issue 1621 Figure 43 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 35: ...507277 02 Page 35 of 52 Issue 1621 Typical Wiring Diagram Figure 50 For A95DF1E 95G1DFE ...
Страница 46: ...507277 02 Page 46 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation ...
Страница 47: ...507277 02 Page 47 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation continued ...
Страница 48: ...507277 02 Page 48 of 52 Issue 1621 Troubleshooting Cooling Sequence of Operation ...
Страница 49: ...507277 02 Page 49 of 52 Issue 1621 Troubleshooting Continuous Fan Sequence of Operation ...