507277-02
Page 51 of 52
Issue 1621
Gas Supply Pressure
SUPPLY
AIR
Line Voltage
GAS SUPPLY
Natural Gas
LP Propane Gas
Piping Connections Tight
Leak Tested
1
INTAKE / EXHAUST PIPE
All Joints Primed and Glued
Terminations Installed Properly
Pipes Supported
Condensate Trap Primed / Line Sloped
Heat Cable Installed and Operable (if applicable)
2
2
2
1
Horizontal Pipes Sloped (if applicable)
UNIT SET UP
3
4
Flter
RETURN AIR
Furnace:
Model Number_______________
Serial Number_________________
3
DUCT SYSTEM
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
4
VOLTAGE CHECK
Supply Voltage _____
Electrical Connections Tight
1
Start-Up & Performance Check List
Содержание 95G1DFE
Страница 29: ...507277 02 Page 29 of 52 Issue 1621 Figure 43 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 35: ...507277 02 Page 35 of 52 Issue 1621 Typical Wiring Diagram Figure 50 For A95DF1E 95G1DFE ...
Страница 46: ...507277 02 Page 46 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation ...
Страница 47: ...507277 02 Page 47 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation continued ...
Страница 48: ...507277 02 Page 48 of 52 Issue 1621 Troubleshooting Cooling Sequence of Operation ...
Страница 49: ...507277 02 Page 49 of 52 Issue 1621 Troubleshooting Continuous Fan Sequence of Operation ...