507270-03
Page 25 of 60
Issue 1621
General Guidelines for Vent Terminations
In Non–Direct Vent applications, combustion air is taken
from indoors and the flue gases are discharged to the
outdoors. This furnace is then classified as a non–direct
vent, Category IV gas furnace.
In Direct Vent applications, combustion air is taken from
outdoors and the flue gases are discharged to the outdoors.
This furnace is then classified as a direct vent, Category IV
gas furnace.
In both Non–Direct Vent and Direct Vent applications, the
vent termination is limited by local building codes. In the
absence of local codes, refer to the current National Fuel
Gas Code ANSI Z223-1/NFPA 54 in U.S.A., and current
CSA-B149 Natural Gas and Propane Installation Codes in
Canada for details.
Position termination according to location given in Figures 31
or 32. In addition, position termination so it is free from any
obstructions and 12” above the average snow accumulation.
At vent termination, care must be taken to maintain protective
coatings over building materials (prolonged exposure to
exhaust condensate can destroy protective
coatings). It
is recommended that the exhaust outlet not be located
within 6 feet (1.8 m) of a condensing unit because the
condensate can damage the painted coating.
NOTE:
See Table 7 for maximum allowed exhaust pipe
length without insulation in unconditiioned space during
winter design temperature is below 32° F (0° C). If required,
exhaust piping should be insulated with 1/2” (13 mm),
Armaflex or equivalent. In extremely cold climate areas with
temperature below 20° F (6.7° C) it is recommended that,
3/4” (19 mm) Armaflex or equivalent be used. Insulation
on outside runs of exhaust pipe may be painted or wrapped
to protect insulation from deterioration in accordance with
the insulation manufacturers recommendation. Exhaust
pipe insulation may not be necessary in some specific
applications.
NOTE:
During extremely cold temperatures, below
approximately 20° F (6.7° C), units with long runs of vent
pipe through unconditioned space, even when insulated,
may form ice in the exhaust termination that prevents the
unit from operating properly. Longer run times of at least 5
minutes will alleviate most icing problems. Also, a heating
cable may be installed on exhaust piping and termination
to prevent freeze-ups. Heating cable installation kits are
available. See unit specification sheets for part numbers.
For Canadian Installations Only:
In accordance to CSA International B149 installation
codes, the minimum allowed distance between the
combustion air intake inlet and the exhaust outlet of
other appliances shall not be less than 12 inches (305
mm).
IMPORTANT
Do not use screens or perforated metal in exhaust
terminations. Doing so will cause freeze-ups and may
block the terminations.
IMPORTANT
Table 7
Maximum Allowable Exhaust Vent Pipe Length (in ft.) Without Insulation
In Unconditioned Space For Winter Design Temperatures Single - Stage High Efficiency Furnace
Winter Design Temperatures
1
ºF (ºC)
Vent Pipe
Diameter
Unit Input Size
045
070
090
110
135
32 to 21
(0 to -6)
PVC
2
PP PVC
2
PP PVC
2
PP PVC
2
PP PVC
2
PP
2 in.
18
16
31
28
50
48
30
30
N/A N/A
2-1/2 in.
13
N/A
24
N/A
42
N/A
56
N/A N/A N/A
3 in.
9
9
18
18
35
35
47
47
52
52
20 to 1
(-7 to -17)
2 in.
9
8
18
16
32
29
30
30
N/A N/A
2-1/2 in.
5
N/A
13
N/A
24
N/A
34
N/A N/A N/A
3 in.
N/A N/A
8
8
19
19
26
26
30
30
0 to -20
(-18 to -29)
2 in.
5
3
12
10
22
19
30
27
N/A N/A
2-1/2 in.
N/A N/A
7
N/A
15
N/A
22
N/A N/A N/A
3 in.
N/A N/A N/A N/A
10
10
16
16
18
18
1
Refer to 99% Minimum Design Temperature table provided in the current edition of the ASHRAE Fundamentals Handbook.
2
Poly-Propylene vent pipe (PP) by Duravent and Centrotherm
NOTE - Concentric terminations are the equivalent of 5’ and should be considered when measuring pipe length.
NOTE- Maximum uninsulated vent lengths listed may include the termination (vent pipe exterior to the structure ) and
cannot exceed 5 linear feet or the maximum allowable intake or exhaust vent length listed in table 5 or 6.
NOTE - If insulation is required an unconditioned space, it must be located on the pipe closed to the furnace.
Содержание 92G1UH-P
Страница 3: ...507270 03 Page 3 of 60 Issue 1621 EXPANDED VIEW Figure 1 ...
Страница 22: ...507270 03 Page 22 of 60 Issue 1621 Figure 26 Figure 25 ...
Страница 26: ...507270 03 Page 26 of 60 Issue 1621 Figure 31 ...
Страница 27: ...507270 03 Page 27 of 60 Issue 1621 Figure 32 ...
Страница 29: ...507270 03 Page 29 of 60 Issue 1621 Figure 36 ...
Страница 30: ...507270 03 Page 30 of 60 Issue 1621 Figure 37 ...
Страница 37: ...507270 03 Page 37 of 60 Issue 1621 Figure 55 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 39: ...507270 03 Page 39 of 60 Issue 1621 Figure 58 Figure 57 ...
Страница 40: ...507270 03 Page 40 of 60 Issue 1621 Table 10 ...
Страница 43: ...507270 03 Page 43 of 60 Issue 1621 TYPICAL WIRING DIAGRAM Figure 63 ...
Страница 50: ...507270 03 Page 50 of 60 Issue 1621 ...
Страница 51: ...507270 03 Page 51 of 60 Issue 1621 ...
Страница 52: ...507270 03 Page 52 of 60 Issue 1621 BLOWER DATA A95UH1D 95F1UHD ...
Страница 53: ...507270 03 Page 53 of 60 Issue 1621 ...