507270-03
Page 45 of 60
Issue 1621
Priming Condensate Trap
The condensate trap should be primed with water prior to
start-up to ensure proper condensate drainage. Either pour
10 fl. oz. (300 ml) of water into the trap, or follow these steps
to prime the trap:
1. Follow the lighting instructions to place the unit into
operation.
2. Set the thermostat to initiate a heating demand.
3. Allow the burners to fire for approximately 3 minutes.
4. Adjust the thermostat to deactivate the heating demand.
5. Wait for the combustion air inducer to stop. Set the
thermostat to initiate a heating demand and again allow
the burners to fire for approximately 3 minutes.
6. Adjust the thermostat to deactivate the heating demand
and wait for the combustion air inducer to stop. At this
point, the trap should be primed with sufficient water
to ensure proper condensate drain operation.
If you do not follow these instructions exactly, a fire
or explosion may result causing property damage,
personal injury or death.
WARNING
Gas Valve Operation (Figure 65)
1.
STOP
! Read the safety information at the beginning of
this section.
2. Set the thermostat to the lowest setting.
3. Turn
OFF
all electrical power to the unit.
4. This furnace is equipped with an ignition device which
automatically lights the burners. Do
not
try to light the
burners by hand.
5. Remove the upper access panel.
6. Move gas valve switch to
OFF.
See Figure 65.
7. Wait five minutes to clear out any gas. If you then
smell gas,
STOP!
Immediately call your gas supplier
from a neighbor’s phone. Follow the gas supplier’s
instructions. If you do not smell gas go to next step.
8. Move gas valve switch to
ON.
See Figure 65.
9. Replace the upper access panel.
10. Turn on all electrical power to the unit.
11. Set the thermostat to desired setting.
NOTE:
When unit is initially started, steps 1 through 11 may
need to be repeated to purge air from gas line.
12. If the appliance will not operate, follow the instructions
“Turning Off Gas to Unit” and call your service technician
or gas supplier.
Turning Off Gas to Unit
1. Set the thermostat to the lowest setting.
2. Turn off all electrical power to the unit if service is to be
performed.
3. Remove the upper access panel.
4. Move gas valve switch to
OFF.
5. Replace the upper access panel.
Failure To Operate
If the unit fails to operate, check the following:
1. Is the thermostat calling for heat?
2. Are access panels securely in place?
3. Is the main disconnect switch closed?
4. Is there a blown fuse or tripped breaker?
5. Is the filter dirty or plugged? Dirty or plugged filters will
cause the limit control to shut the unit off.
6. Is gas turned on at the meter?
7. Is the manual main shut–off valve open?
8. Is the internal manual shut–off valve open?
9. Is the unit ignition system in lockout? If the unit locks
out again, inspect the unit for blockages.
Heating Sequence Of Operation
1. When thermostat calls for heat, combustion air inducer
starts.
2. Combustion air pressure switch proves blower operation.
Switch is factory set and requires no adjustment.
3. After a 15 second prepurge, the hot surface ignitor
energizes.
4. After a 20 second ignitor warm-up period, the gas valve
solenoid opens. A 4-second “Trial for Ignition” period
begins.
5. Gas is ignited, flame sensor proves the flame, and the
combustion process continues.
6.
If flame is not detected after first ignition trial, the ignition
control will repeat steps 3 and 4 four more times before
locking out the gas valve. The ignition control will then
automatically repeat steps 1 through 6 after 60 minutes.
To interrupt the 60 minute period, move thermostat from
“Heat” to “OFF” then back to “Heat”. Heating sequence
then restarts at step 1.
Figure 65
Содержание 92G1UH-P
Страница 3: ...507270 03 Page 3 of 60 Issue 1621 EXPANDED VIEW Figure 1 ...
Страница 22: ...507270 03 Page 22 of 60 Issue 1621 Figure 26 Figure 25 ...
Страница 26: ...507270 03 Page 26 of 60 Issue 1621 Figure 31 ...
Страница 27: ...507270 03 Page 27 of 60 Issue 1621 Figure 32 ...
Страница 29: ...507270 03 Page 29 of 60 Issue 1621 Figure 36 ...
Страница 30: ...507270 03 Page 30 of 60 Issue 1621 Figure 37 ...
Страница 37: ...507270 03 Page 37 of 60 Issue 1621 Figure 55 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 39: ...507270 03 Page 39 of 60 Issue 1621 Figure 58 Figure 57 ...
Страница 40: ...507270 03 Page 40 of 60 Issue 1621 Table 10 ...
Страница 43: ...507270 03 Page 43 of 60 Issue 1621 TYPICAL WIRING DIAGRAM Figure 63 ...
Страница 50: ...507270 03 Page 50 of 60 Issue 1621 ...
Страница 51: ...507270 03 Page 51 of 60 Issue 1621 ...
Страница 52: ...507270 03 Page 52 of 60 Issue 1621 BLOWER DATA A95UH1D 95F1UHD ...
Страница 53: ...507270 03 Page 53 of 60 Issue 1621 ...