
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
79
Figure 40. Installing an SFP Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 3 to install
another SFP transceiver in the switch.
4. Remove the dust cover from the transceiver, as shown in Figure 41.
Figure 41. Removing the Dust Cover from an SFP Transceiver
Содержание GS950 PS Series
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 88: ...Chapter 7 Powering On the Switch 88...
Страница 108: ...Appendix A Technical Specifications 108...