
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
31
POWER LED
The GS950/10PS V2 Switch has a POWER LED on the left side of the
faceplate. Refer to Figure 9.
Figure 9. POWER LED
Table 5 defines the LED states.
PoE MAX LED
The switches have a PoE MAX LED on the left side of the faceplate. Refer
to Figure 8 on page 30. Table 6 defines the states of the PoE MAX LED.
Link/Activity and
PoE LEDs
The copper ports have link/activity and PoE LEDs.The LEDs on the
GS950/10PS V2, GS950/28PS V2, and GS950/52PS V2 Switches are
located on the left side of the faceplate. The LEDs in the example in Figure
10 on page 32 are from the GS950/28PS V2 Switch.
Table 5. POWER LED
State
Description
Off
The switch is not receiving AC power or has experienced
a system failure.
Green
The switch is operating normally.
Table 6. PoE MAX LED
State
Description
Off
The total power requirements of the powered devices
connected to the ports are below the switch’s maximum
power budget. The switch is providing power to all
powered devices on its ports.
Red
The total power requirements of the powered devices
meet or exceed the switch’s maximum power budget.
The switch cannot support additional powered devices
and may be denying power to some ports.
Содержание GS950 PS Series
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 88: ...Chapter 7 Powering On the Switch 88...
Страница 108: ...Appendix A Technical Specifications 108...