
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
65
Installing the Switch on the Plywood Base
This procedure assumes that the plywood base for the switch is installed
on the wall. Please review “Reviewing Safety Precautions” on page 40 and
“Choosing a Site for the Switch” on page 46 before performing this
procedure. Allied Telesis recommends two people for this procedure, one
person to hold the switch on the wall while the other person secures it by
installing the screws.
Warning
The device is heavy. Use both hands to lift it. You might injure
yourself or damage the device if you drop it.
E94
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall.
E105
Caution
The supplied screws and anchors may not be appropriate for all wall
material. A qualified building contractor should determine the
appropriate hardware requirements for your wall before installing the
switch.
E88
To install the switch on the plywood base, perform the following procedure:
1. Place the switch on a table.
2. Install the two brackets to the sides of the unit with the eight screws
that come with the switch. Refer to Figure 30 on page 66.
Содержание GS950 PS Series
Страница 6: ...6...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 88: ...Chapter 7 Powering On the Switch 88...
Страница 108: ...Appendix A Technical Specifications 108...