x550 Series Installation Guide for Virtual Chassis Stacking
171
Figure 79. Installing an SFP Transceiver
5. Slide the transceiver into the slot until it clicks into place.
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining transceivers in the switch.
6. Remove the dust cover from the transceiver, as shown in Figure 80 on
Содержание AT-x550-18XSPQm
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 50: ...Chapter 1 Overview 50 ...
Страница 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Страница 90: ...Chapter 3 Beginning the Installation 90 ...
Страница 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Страница 124: ...Chapter 5 Installing the Switch on a Wall 124 ...
Страница 190: ...Appendix A Technical Specifications 190 ...