x550 Series Installation Guide for Virtual Chassis Stacking
131
2. Power on all the switches in the stack at the same time. Refer to
“Powering On a Switch” on page 137.
Refer to “Power Specifications” on page 186 for the power
specifications of the switches.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
E5
3. Wait two or three minutes for the switches to select a master switch
and to assign the ID numbers.
The stack is operational. The ID numbers are automatically stored in
special files in the flash memories of the switches and are retained by
the devices even if you reset or power cycle the stack.
4. To continue with the installation, go to “Starting a Local Management
Содержание AT-x550-18XSPQm
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 50: ...Chapter 1 Overview 50 ...
Страница 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Страница 90: ...Chapter 3 Beginning the Installation 90 ...
Страница 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Страница 124: ...Chapter 5 Installing the Switch on a Wall 124 ...
Страница 190: ...Appendix A Technical Specifications 190 ...