63
|
P a g e
ELECTRICAL
(CONTINUED)
Power
Control
Center
Safety
Features
REVERSE
BATTERY
PROTECTION
CIRCUIT
–
If
a
battery
is
accidentally
hooked
up
backwards,
the
converter
will
be
protected.
Easily
accessible
ATC
type
fuses
will
blow
when
a
battery
is
connected
in
reverse.
Correct
battery
wiring
and
replace
fuses
with
the
same
type
and
rating.
THE
DC
SECTION
–
The
DC
panel
features
up
to
18
fused
positions
rated
for
up
to
30
amps,
depending
on
model,
for
accessories
including
ten
low
‐
to
‐
full
current
rated
branches.
These
can
be
used
for
lower
current
devices
such
as
smoke
and
CO
detectors.
Each
branch
has
an
optional
LED
to
indicate
a
blow
branch
fuse.
DISCONNECT
ALL
POWER
TO
THE
CONVERTER
PRIOR
TO
CHECKING
OR
CHANGING
FUSES.
FOR
CONTINUED
PROTECTION
AGAINST
RISK
OF
FIRE
OR
ELECTRICAL
SHOCK,
REPLACE
ONLY
WITH
SAME
TYPE
AND
RATING
OF
FUSE.
CONSULT
A
LICENSED
ELECTRICAL
OR
RV
TECHNICIAN
FOR
ANY
NEEDED
ASSISTANCE.
Power
Control
Center
Specifications
MODEL
PD4560(LI)
PD4575(LI)
PD4590(LI)
DC
Section
Input:
105
‐
130VAC
50/60
Hz
Input:
105
‐
130VAC
50/60
Hz
Input:
105
‐
130VAC
50/60
Hz
1,000
Watts
1,250
Watts
1,550
Watts
Output:
13.6
‐
14.6
VDC
(14.6
VDC)
Output:
13.6
‐
14.6
VDC
(14.6
VDC)
Output:
13.6
‐
14.6
VDC
(14.6
VDC)
60
Amps
75
Amps
90
Amps
Weight:
8
lbs.
Weight:
8.5
lbs.
Weight:
10
lbs.
* Maximum
continuous
loads
on
main
or
branch
circuits
not
to
exceed
80%
of
the
circuit
breaker
ratings
240/120
VAC
50
Amps
Maximum*
120
VAC
50
Amp
Maximum*
‐
12
Branch
Circuits
12
VDC
100
Amp
Max.
‐
18
Branch
Circuits
AC
Section
Converter
Section
Содержание Paradigm
Страница 1: ...Obsessed with providing the best RV ownership experience OWNER S GUIDE Version 2 4 20 ...
Страница 103: ...97 P a g e AWNINGS CONTINUED Awning Component Breakdown GO TO TOP ...
Страница 126: ...120 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Connecting to City Water GO TO TOP ...
Страница 127: ...121 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing GO TO TOP ...
Страница 128: ...122 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing Continued GO TO TOP ...
Страница 129: ...123 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing Continued GO TO TOP ...
Страница 130: ...124 P a g e PLUMBING AND UTILITIES CONTINUED Rinsing Holding Tanks Tank Flush GO TO TOP ...
Страница 131: ...125 P a g e PLUMBING AND UTILITIES CONTINUED Rinsing Holding Tanks Tank Flush Continued GO TO TOP ...