31
|
P a g e
HYDRAULIC
LEVELING
SYSTEM
(CONTINUED)
Leveling
System
Maintenance
Failure
to
follow
the
instructions
provided
in
this
manual
may
result
in
death,
serious
personal
injury,
severe
product
or
property
damage
or
voiding
of
the
component
warranty.
The
unit
should
be
supported
at
both
front
and
rear
axles
with
jack
stands
before
working
underneath.
Failure
to
do
so
may
result
in
death,
serious
personal
injury,
severe
product
or
property
damage
or
voiding
of
the
component
warranty.
Always
wear
eye
protection
when
performing
service
or
maintenance
to
the
unit.
Other
safety
equipment
to
consider
would
be
hearing
protection,
gloves
and
possibly
a
full
‐
face
shield,
depending
on
the
nature
of
the
service.
Moving
parts
can
pinch,
crush
or
cut.
Keep
clear
and
use
caution.
Maintenance
Items
o
Dexron
III
or
Mercon
V
Class
“A”
automatic
transmission
fluid
o
Electrical
contact
cleaner
o
Lint
‐
free
cloth
o
Zip
ties
Maintenance
Steps
1. Check
the
fluid
in
reservoir
every
12
months.
If
fluid
is
a
clear
red
color,
do
not
change.
If
fluid
is
milky,
pink
and
murky,
drain
reservoir
and
add
new
fluid.
Hydraulic
fluid
should
be
changed
at
a
minimum
every
5
years.
NOTE
:
Check
the
fluid
only
when
all
the
jacks
are
fully
retracted.
NOTE
:
When
checking
the
hydraulic
fluid
level,
fill
to
within
½”
of
fill
spout.
2. Inspect
and
clean
all
power
unit
electrical
connections
every
12
months.
If
corrosion
is
evident,
spray
power
unit
electrical
connections
with
electrical
contact
cleaner.
3. Remove
dirt
and
road
debris
from
jacks
as
needed.
4. If
jacks
are
down
for
extended
periods,
spray
exposed
jack
rods
with
a
silicone
lubricant
every
3
months
for
protection.
If
the
unit
is
in
a
salty
environment,
spray
the
rods
every
4
to
6
weeks.
Содержание Paradigm
Страница 1: ...Obsessed with providing the best RV ownership experience OWNER S GUIDE Version 2 4 20 ...
Страница 103: ...97 P a g e AWNINGS CONTINUED Awning Component Breakdown GO TO TOP ...
Страница 126: ...120 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Connecting to City Water GO TO TOP ...
Страница 127: ...121 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing GO TO TOP ...
Страница 128: ...122 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing Continued GO TO TOP ...
Страница 129: ...123 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing Continued GO TO TOP ...
Страница 130: ...124 P a g e PLUMBING AND UTILITIES CONTINUED Rinsing Holding Tanks Tank Flush GO TO TOP ...
Страница 131: ...125 P a g e PLUMBING AND UTILITIES CONTINUED Rinsing Holding Tanks Tank Flush Continued GO TO TOP ...