62
Rockwell Automation Publication 1500-UM055I-EN-P - December 2021
Chapter 4 Maintenance
14. Manually close the contactor by attaching locking pliers to the contactor
operating lever and pushing down until the armature plate contacts the
magnetic cores (see
). Verify that the interlock lever overlaps the
isolation switch operating lever by at least 3 mm (0.125 in.) (see
).
Figure 56 - Closing Contactor Manually (Some parts not shown)
Figure 57 - Isolation Switch Operating Lever Overlap
15. Open the contactor. Verify that the interlock lever and the rod move
freely and that the return springs move the assembly back to the starting
position.
Contactor
Interlock Rod
Contactor Plug
Contactor
Mounting Bolts
Contactor
Operating Lever
Overlap minimum
0.125 in. (3 mm)
Isolation
Switch
Operating
Lever
Interlock Lever
Содержание 1512B
Страница 6: ...6 Rockwell Automation Publication 1500 UM055I EN P December 2021 Notes...
Страница 74: ...74 Rockwell Automation Publication 1500 UM055I EN P December 2021 Chapter 4 Maintenance Notes...
Страница 76: ...76 Rockwell Automation Publication 1500 UM055I EN P December 2021 Chapter 5 Spare Parts Notes...
Страница 106: ...106 Rockwell Automation Publication 1500 UM055I EN P December 2021 Appendix E History of Changes Notes...