66
Rockwell Automation Publication 1500-UM055I-EN-P - December 2021
Chapter 4 Maintenance
Figure 61 - Isolation Switch Linkage Assembly Angle Location
5. Loosen the lock nuts at each clevis (Note: one is a left-handed thread).
6. Adjust the isolation switch mechanical threaded linkage with a wrench
until the overall travel angle of the switch link is within the required
tolerance.
7. Hold the position of the threaded linkage and tighten the lock nuts.
Figure 62 - Isolation Switch Mechanical Threaded Linkage
8. Actuate the Isolation Switch handle to verify the travel angle.
Must have
tolerance of
0/+6
degrees
Shaft Assembly
Red Glass
Polyester
Switch Link
Isolation Switch
Mechanical
Threaded Linkage
Содержание 1512B
Страница 6: ...6 Rockwell Automation Publication 1500 UM055I EN P December 2021 Notes...
Страница 74: ...74 Rockwell Automation Publication 1500 UM055I EN P December 2021 Chapter 4 Maintenance Notes...
Страница 76: ...76 Rockwell Automation Publication 1500 UM055I EN P December 2021 Chapter 5 Spare Parts Notes...
Страница 106: ...106 Rockwell Automation Publication 1500 UM055I EN P December 2021 Appendix E History of Changes Notes...