background image

18 

 

Missing 

encoder 

signal 

down 

and 

then 

press  P2  for  more 
than 3 seconds 

 
 
Er08 

 
 
Encoder error 

Flue  gas  engine  is not 

responding 

Wait 

for 

the 

furnace  to  shut 
down 

and 

then 

press  P2  for  more 
than 3 seconds 

 
 
Contact the service center 

Flue 

gas 

engine 

operates at a speed that is 
different  from  the  set 
speed 

 
 
Er011 

 
 
Clock error 

Problems  with  the 

internal clock 

 
Press  and    hold 

P2  for  more  than  3 
seconds 

Check the accuracy of the 

preset time 

 
Insufficient capacity of 

the internal battery 

Check  the  correctness  of 

programming  in  the  Chrono 
mode 

Contact the service center 

 
 
 
Er012 

 
 
 
Ignition failed 

Ignition error 

 
Wait 

for 

the 

furnace  to  shut 
down 

and 

then 

press  P2  for  more 
than 3 seconds 

Check  the  state  and 

quality of the used pellets 

During  the  ignition 

phase  adequate  temp.  of 
flue gases is not reached 

Check  contamination  and 

draft of the flue drain 

Faulty flue gas probe 

Contact the service center 

 
Er15 

 
Interruption 

of 

power supply 

Loss  of  power  supply 

during furnace operation 

Press  and  hold 

P2  for  more  than  3 
seconds 

Check to see if the system 

and installation are in order  

Contact the service center 

 
Er16 

Communication 

error 

between 

the 

electronics  and  the 
display 

Interruption  of  the 

display cable 

Press  and  hold 

P2  for  more  than  3 
seconds 

Check  the  cable  and 

display cable connectors 

Damage to the display 

cable connector 

Contact the service center 

 
 
 
 
 
Er17 

 
 
 
 
 
Primary  air  flux 

meter error 

 
 
 
 
Primary  air  flux  meter 

does  not  adjust  the 
operation of the furnace 

The 

furnace 

continues  to  run 
without  adjustment 
of primary air. 

Turn the furnace 

off  to  reactivate  the 
air  flux  meter.  Wait 
for  the  furnace  to 
shut down and then 
press  P2  for  more 
than 3 seconds 

Check  pipe  contamination 

for primary air inlet 

Check  contamination  and 

draft  of  the  flue  drain  and 
funnel 

 
Contact the service center 

 
Er39 

Primary  air  flux 

meter 

sensor 

is 

damaged 

 
Faulty sensor 

The 

furnace 

continues  to  run 
without  adjustment 
of primary air 

 
Contact the service center 

 
 
 
 
 
Er41 

 
 
 
 
The 

minimum 

primary  air  flux  is  not 
reached  during  the 
testing stage 

There is an obstacle or 

large contamination in the 
pipe for primary air inlet 

 
 
 
Wait 

for 

the 

furnace  to  shut 
down 

and 

then 

press  P2  for  more 
than 3 seconds 

Check  and  clean  the  pipe 

for primary air inlet 

Check  contamination  and 

draft  of  the  flue  drain  and 
funnel 

Obstruction of flue gas 

drain 

 
Doors  not  properly 

closed  during  the  ignition 
phase 

Check  if  the  doors  close 

well 

Contact the service center 

 
 
Er42 

 
Primary  air  flux  is 

greater 

than 

the 

maximum  permissible 
value  

 
 
Too much air intake 

 
Wait 

for 

the 

furnace  to  shut 
down 

and 

then 

press  P2  for  more 
than 3 seconds 

Check the pipe for primary 

air inlet 

Check  contamination  and 

draft  of  the  flue  drain  and 
funnel 

Contact the service center 

 

Description 

Possible solution of causes 

Содержание LUCA 12

Страница 1: ...A D METALNA INDUSTRIJA VRANJE Radni ka br 1 PELLET STOVE LUCA 12 INSTRUCTIONS FOR USE AND MAINTENANCE OF LUCA 12 ENG_v 1 0...

Страница 2: ...perature gauge 9 Using the Product 9 The necessary checks and controls for the first ignition 10 Loading the fuel 10 Control System of the Furnace 10 Electrical connection scheme 10 The control panel...

Страница 3: ...E FURNACE 19 Routine maintenance 19 CLEANING THE DISPLAY AND PARTS OF EXTERNAL INSULATION 19 CLEANING THE CERAMIC GLASS 19 ROUTINE MAINTENANCE TYPE 1 ACTIVITY 20 Special maintenance 23 SPECIAL MAINTEN...

Страница 4: ...ide The following symbols are used in this user guide ATTENTION Safety warning PROHIBITED Prohibited action INFORMATION Important information Alfa Plam bears no responsibility or liability for any dir...

Страница 5: ...2 Dimensional features...

Страница 6: ...Hz 50 Fuel Wood pellet Fuel consumption per hour kg h 2 7 5 The flow of gas masses g s 9 0 3 3 Combustion gas temperature C 128 57 Minimum withdrawal pressure Pa 12 0 12 0 Tank capacity kg 14 Autonomy...

Страница 7: ...g dm3 1 12 1 0 1 4 1 12 0 6 average mass volume Humidity 10 12 10 10 Ash 0 50 1 50 0 50 0 50 Thermal power kWh kg 5 4 86 5 42 5 4 5 Sulfur 0 04 0 08 0 04 0 05 Nitrogen 0 3 0 3 0 3 0 3 Chlorine 0 02 0...

Страница 8: ...ake all the necessary precautions particularly when children or elderly or disabled people are present ATTENTION Do not block or clogs the hot air drain in any way Do not cover the product with cloth...

Страница 9: ...made of non flammable materials is PROHIBITED Using the product in explosive and potentially explosive atmospheres is PROHIBITED Installation You must comply with all local and national laws and Euro...

Страница 10: ...cm Minimum distance from combustible rear wall B 50 cm Minimum distance from combustible side wall S 40 cm Minimum distance from combustible material on the front side Fr 150 cm Once you ve determined...

Страница 11: ...f the solutions that can be applied includes storing the furnace that uses wood pellets near the outer wall of the house so that the exhaust fumes are directly released outside Figure 2 4 Some of the...

Страница 12: ...rmful No special conditions are needed for its disposal The user is responsible for the disposal of the remaining components of the packaging The user must follow the proper disposal procedures in acc...

Страница 13: ...ATTENTION Do not let the bag with wooden pellets come into contact with hot parts of the product while you load the fuel ATTENTION Do not remove the protective grid inside the part for loading the pel...

Страница 14: ...ing Main Temp The current value of the room temperature State Functional state of the furnace Main Therm Set room temperature Comb Power Combustion power Heat Power Heating power Time Time Chrono Sche...

Страница 15: ...gnal Block Er47 Auger encoder error auger speed control failed Block Er48 Module error I O 12C Block Er52 Service error This informs that the planned period of operation has been reached after preload...

Страница 16: ...n a distant room It is visible only if the external thermostat is installed while a heating plant that uses it is set up to use an external thermostat Remote Control This menu allows turning the remot...

Страница 17: ...M In the end press P2 in order to activate the program The following is shown on the display Daily Monday ON OFF 09 30 11 1 5 00 00 00 0 0 00 00 00 0 0 This program schedules the furnace to turn on on...

Страница 18: ...up phase the initial checks of the input signals or the probity of safety probes and pressure switches of the furnace are done In this phase the flue gas engine runs at maximum speed while the auger a...

Страница 19: ...hich dispensing of pellets stops and the flue gas engine and the ambient fan operate at maximum capacity in order for the furnace to cool down as soon as possible Minimum duration of the extinguishing...

Страница 20: ...t enters running mode at the end of ignition phase Message Block ignition is shown on the display If an error occurs the system immediately goes into shutdown if P2 is pressed it is possible to immedi...

Страница 21: ...y cable connectors Damage to the display cable connector Contact the service center Er17 Primary air flux meter error Primary air flux meter does not adjust the operation of the furnace The furnace co...

Страница 22: ...t stove or vice versa The smoke extraction duct flue duct and chimney may not be clean or may be nor airtight The point for inserting the flue duct into the chimnex may be flawed The size of theflue d...

Страница 23: ...ctivities is increased in proportion to the intensity of use of the furnace ATTENTION Make sure that the ash is completely cold before you start cleaning the furnace When you make sure the ash is cold...

Страница 24: ...on chamber in the ash container and at the door 7 The inside of the section in which the ash container is located After you ve finished cleaning re assemble all the elements in reverse order from the...

Страница 25: ...22 9 Once in a month unlock the lock mechanism at back side of the stove remove and clean up the chamber lid for collecting dust on the heat exchanger...

Страница 26: ...e heat exchanger using the attached brush and a vacuum cleaner to clean up all the soot and ashes that come out of the heat exchanger After you ve finished cleaning re assemble all the elements in rev...

Страница 27: ...remove all the soot deposited on the stainless steel blade on the engine smoke 5 Vacuum up all the soot deposited inside the base of the engine smoke especially on the left side next to the stovepipe...

Страница 28: ...nd economical way to protect the system from corrosion and to ensure its efficient operation For homes that are not inhabited throughout the year it is recommended to check the stovepipe and funnel at...

Отзывы: