13 — Maintenance and file transfers
Speed Touch 591s Technical Practices
13-7
February 2001 90-8785-01
Procedure 13-5 Configuring a loopback
MAINT — OBJECT — PORT — <U>
↵
— LOOPBACK — LOOPBACK_E — LATCHED or
TIMED
Procedure 13-6 Removing a loopback
MAINT — OBJECT — PORT — <U>
↵
— LOOPBACK — UNDO_LPBK
Procedure 13-7 Removing all loopbacks
MAINT — OBJECT — PORT — <U>
↵
— LOOPBACK — CLEAR_ALL
Loopbacks on the T1/E1 port
Two loopbacks are available on the T1 or E1 port—line and equipment loopbacks.
The line loopback tests the T1/E1 line, simultaneously transmitting data received on
the line at the T1/E1 port to the network port, looping it back to the T1/E1 port itself,
and blocking any incoming data on the network port.
The equipment loopback tests the Speed Touch 591s itself. Data received on the
SHDSL line at the network port is carried through the Speed Touch 591s, then looped
back to the network port when it reaches the T1/E1 port. An AIS is transmitted on
the T1/E1 port while the loopback is in place.
Both types of loopback can be either latched or timed. Timed loopbacks have a fixed
duration of 5 min, although the loopback can be cleared manually before the 5 min
expires.
Latched loopbacks remain in place until they are removed manually or the Speed
Touch 591s is reset.
Note — If a loopback is already active, an error message is displayed.
Caution —
When a line loopback is set up, the equipment connected
to the T1 or E1 port must provide the clock signal, because the clock
signal on the Speed Touch 591s is looped back.
Содержание Speed Touch 591s
Страница 1: ......
Страница 10: ...Foreword x Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 20: ...Mandatory regulations Speed Touch 591s Technical Practices xx February 2001 90 8785 01...
Страница 22: ......
Страница 28: ...1 Introduction 1 6 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 34: ...2 Features and typical applications 2 6 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 35: ...Speed Touch 591s Technical Practices February 2001 90 8785 01 Installation 3 Installation...
Страница 36: ......
Страница 42: ...3 Installation 3 6 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 44: ......
Страница 86: ...7 TCA profiles 7 12 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 94: ...8 Configuring the V 35 X 21 CE user port 8 8 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 98: ...9 Configuring V 35 X 21 CE connections 9 4 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 118: ...11 Configuring T1 E1 CE connections 11 4 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 128: ......
Страница 138: ...13 Maintenance and file transfers 13 10 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 144: ...14 Troubleshooting 14 6 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 160: ...15 Statistics 15 16 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 161: ...Speed Touch 591s Technical Practices A 1 February 2001 90 8785 01 App A Pin and signal assignments...
Страница 166: ...App A Pin and signal assignments A 6 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 167: ...Speed Touch 591s Technical Practices February 2001 90 8785 01 Glossary...
Страница 168: ......
Страница 176: ...Glossary GL 8 Speed Touch 591s Technical Practices 90 8785 01 February 2001...
Страница 177: ...Speed Touch 591s Technical Practices February 2001 90 8785 01 Index...
Страница 178: ......
Страница 183: ......
Страница 184: ...2001 Alcatel All rights reserved 95 5293 01 00 A...