............................................................................................................................................................................................................................................................
Initial circuit pack installation
Powering and initial circuit pack installation for 1665 Data
Multiplexer (1665 DMX)
2 - 2 4
365-372-304R7.1
Issue 1, November 2007
........................................................................................................................................................................................................................
1
Refer to the engineering job specification. Identify the proper function group(s) and/or
growth slot(s) where the low-speed OLIU circuit packs will be installed.
........................................................................................................................................................................................................................
2
Remove the OLIU from the packing material.
........................................................................................................................................................................................................................
3
Place the circuit pack into the shelf (slot A1, B1, C1, D1 or G1 as required). Do
NOT
engage the circuit pack in the backplane connector.
........................................................................................................................................................................................................................
4
If a companion circuit pack is required, continue with
. If not, install a blank circuit
pack into the companion circuit pack slot (A2, B2, C2, D2 or G2 as required), then
proceed to
Important!
Blank circuit packs are required in all unused slots to provide proper air
flow for cooling.
........................................................................................................................................................................................................................
5
Remove the second OLIU from the packing material.
........................................................................................................................................................................................................................
6
Place the circuit pack into the shelf (slot A2, B2, C2, D2 or G2 as required). Do
NOT
engage the circuit pack in the backplane connector.
........................................................................................................................................................................................................................
7
for each additional function group and/or growth slot to be
equipped with LNW37, LNW45, LNW49, LNW55 or LNW62 circuit packs.
........................................................................................................................................................................................................................
8
Install the SFP module per
Install pluggable transmission modules (p. 2-34)
........................................................................................................................................................................................................................
9
Check off the appropriate box in
Appendix E, “Installation checklist”
.
........................................................................................................................................................
E
N D
O
F
S
T E P S
Содержание Data Multiplexer Explore 1665
Страница 8: ... Contents v i i i 365 372 304R7 1 Issue 1 November 2007 ...
Страница 12: ... List of figures x i i 365 372 304R7 1 Issue 1 November 2007 ...
Страница 16: ... List of tables x v i 365 372 304R7 1 Issue 1 November 2007 ...
Страница 24: ... About this document x x i v 365 372 304R7 1 Issue 1 November 2007 ...
Страница 168: ... 1665 Data Multiplexer 1665 DMX stand alone installation tests I I 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 250: ... Additional optical tests optional Installation tests 4 6 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 272: ... Final operations Operational tests 5 2 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 274: ... 1665 Data Multiplexer 1665 DMX ring setup and testing I I I 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 326: ... Cleaning pluggable optics modules Fiber cleaning B 1 4 365 372 304R7 1 Issue 1 November 2007 ...
Страница 408: ...I N 4 365 372 304R7 1 Issue 1 November 2007 Index ...