Automatic protection switching and alarm test
Operational tests
............................................................................................................................................................................................................................................................
365-372-304R7.1
Issue 1, November 2007
5 - 9
OC-3
LNW82
OC-12
LNW48, LNW50, LNW54, LNW82
OC-48
LNW27, LNW29, LNW32, LNW76, LNW82, LNW202, LNW221-LNW259
OC-192
LNW56, LNW57, LNW58, LNW59 (VLF), LNW60, LNW502, LNW523, LNW527,
LNW554 or LNW555.
It should be noted that switching tests for Function Unit circuit packs were performed in
the previous chapter.
........................................................................................................................................................................................................................
1
Establish a CIT session by following the procedure under
Chapter 3, “Software download and circuit pack installation”
........................................................................................................................................................................................................................
2
Select View -> Cross-Connections.
........................................................................................................................................................................................................................
3
Choose shelf (1665 DMX) and click Select.
........................................................................................................................................................................................................................
4
Verify that the cross-connection entered in the previous section is on the list. If there is no
cross connect remaining from the previous section, then a cross connection must be
established before continuing.
........................................................................................................................................................................................................................
5
Select Configuration -> Cross-Connections.
........................................................................................................................................................................................................................
6
Use the Cross-Connection Wizard to enter a new cross-connection at the STS-1 rate,
UPSR Ring Add/Drop, between m1-1-1 and fn1-1 (fn will be a,b,c or d depending on the
slot where the DS1, DS3, or TMUX CP is located).
This command creates a cross-connection to map 28 DS1s of a DS1 circuit pack or the
first DS3 of a DS3/EC1 or TMUX circuit pack in a Function Unit slot(s) to the first STS-1
of the Main OLIUs.
Содержание Data Multiplexer Explore 1665
Страница 8: ... Contents v i i i 365 372 304R7 1 Issue 1 November 2007 ...
Страница 12: ... List of figures x i i 365 372 304R7 1 Issue 1 November 2007 ...
Страница 16: ... List of tables x v i 365 372 304R7 1 Issue 1 November 2007 ...
Страница 24: ... About this document x x i v 365 372 304R7 1 Issue 1 November 2007 ...
Страница 168: ... 1665 Data Multiplexer 1665 DMX stand alone installation tests I I 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 250: ... Additional optical tests optional Installation tests 4 6 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 272: ... Final operations Operational tests 5 2 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 274: ... 1665 Data Multiplexer 1665 DMX ring setup and testing I I I 2 365 372 304R7 1 Issue 1 November 2007 ...
Страница 326: ... Cleaning pluggable optics modules Fiber cleaning B 1 4 365 372 304R7 1 Issue 1 November 2007 ...
Страница 408: ...I N 4 365 372 304R7 1 Issue 1 November 2007 Index ...