background image

............................................................................................................................................................................................................................................................

Sync cable installation

Equipment and cable installation for 1665 Data Multiplexer 
(1665 DMX)

1 - 7 2

 365-372-304R7.1

Issue 1, November 2007

............................................................................................................................................................................................................................................................

Sync cable installation

Description

This section provides the instructions for installing the two types of synchronization 
(Sync) cables to the 1665 DMX High-Capacity shelf.

A Sync cable is required if the shelf is to be externally timed. The 1665 DMX High-
Capacity shelf can provide DS1 external timing to a BITS clock. When the shelf is 
externally timed by a DS1 Reference and/or is configured to provide a Sync Output, a 
Sync Input timing cable is required.

This procedure should be performed on each 1665 DMX High-Capacity shelf requiring an 
external timing source. There are two types of cables available:

1. Sync cable with a molded D-Sub 9-Pin (DB-9) connector 

2. Sync cable with a wire-wrap DB-9 connector. 

Important!

Each of the Sync connections on the backplane provides an input (gray) 

and output (red) termination for timing. Refer to 

Table 1-19, “Synchronization cable 

(DS1 timing reference) connections” (p. 1-77)

 for the pinouts.

Sync cable with molded DB-9 connector procedure

Perform the following steps when using a Sync cable with a molded DB-9 connector.

........................................................................................................................................................................................................................

1

Connect the DB-9 connector end of the Sync cable to the 

SYNC1

 (

J9

) port on the 1665 

DMX High-Capacity shelf backplane. Refer to 

Figure 1-23, “Sync cable with molded 

DB9 connector installation” (p. 1-73)

.

Содержание Data Multiplexer Explore 1665

Страница 1: ...Alcatel Lucent 1665 1665 DATA MULTIPLEXER RELEASE 7 1 INSTALLATION MANUAL 365 372 304R7 1 CC109666487 NOVEMBER 2007 ISSUE 1 ...

Страница 2: ...used in accordance with the guidelines in this document the equipment may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at the expense of the user Security Statement In rare instances unauthorized individuals make connections to the tele...

Страница 3: ... xxii Packaging collection and recovery requirements xxii Recycling take back disposal of product xxii Part I 1665 Data Multiplexer 1665 DMX physical installation and powering 1 Equipment and cable installation for 1665 Data Multiplexer 1665 DMX Planning 1 3 Connector references 1 7 Inspection 1 8 1665 DMX High Capacity shelf installation 1 9 Heat baffle installation 1 14 Power cable and cable bra...

Страница 4: ...tallation for low speed packs 1 90 1000Base F and 100Base F fiber installation 1 92 Fibre channel fiber installation 1 94 CIT cable installation 1 96 Final operations 1 99 2 Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX Description 2 2 Powering 2 3 Circuit pack compatibility 2 7 Initial circuit pack installation 2 12 Part II 1665 Data Multiplexer 1665 DMX stand ...

Страница 5: ...OC 3 low speed testing 4 43 OC 12 low speed testing 4 47 OC 48 low speed testing 4 52 LED test 4 56 Additional optical tests optional 4 57 5 Operational tests Office alarm test 5 4 Automatic protection switching and alarm test 5 8 Manual switching tests 5 11 External timing verification 5 13 Miscellaneous environmental discrete telemetry test 5 16 Modem connection test 5 19 Final operations 5 21 P...

Страница 6: ...ing inspecting optical connectors B 6 Cleaning pluggable optics modules B 12 C Installing fiber connectors and LBOs LBOs C 2 Fiber connections C 5 D Backplane pin replacement Pin and connector background D 2 Repair kits and tools D 4 Simple repair methods D 5 Replacement methods D 7 E Installation checklist Overview E 1 F Fiber labeling Fiber description F 2 Fiber labels F 4 G Pluggable transmissi...

Страница 7: ...Contents v i i 365 372 304R7 1 Issue 1 November 2007 GL Glossary Acronyms and abbreviations GL 1 Terms and definitions GL 15 IN Index ...

Страница 8: ... Contents v i i i 365 372 304R7 1 Issue 1 November 2007 ...

Страница 9: ...fle position 1 15 1 6 Cable brackets 1 17 1 7 Power connector mounting positions 1 19 1 8 Alternating power cable routing 1 20 1 9 Power connection 1 21 1 10 Power cable routing with cable bracket 1 22 1 11 Power cable routing without cable bracket 1 23 1 12 DS1 cable installation 1 35 1 13 DS1 cable routing 1 36 1 14 DS3 EC1 and 48TMUX cable installation 1 42 1 15 DS3 EC1 and 48TMUX cable routing...

Страница 10: ...259 channel positions 2 15 Part II 1665 Data Multiplexer 1665 DMX stand alone installation tests 4 Installation tests 4 1 Optical test set arrangement 4 59 4 2 Optical test arrangement RX fiber moved 4 60 5 Operational tests 5 1 1665 DMX Shelf Backplane 5 14 5 2 Miscellaneous Environmental Discrete Functions 5 17 Part IV 1665 Data Multiplexer 1665 DMX supplementary information and installation che...

Страница 11: ... Type Connector Port C 4 C 5 LC Type Fiber Connector C 5 C 6 LC Type Fiber Connection C 6 G Pluggable transmission module installation G 1 Pluggable Transmission Module With Dust Plug Optical PTMs Only G 6 G 2 Examples of Dust Plugs G 7 G 3 Module Types G 7 G 4 Latch Type 3 Opened and Closed G 9 G 5 Latch Type 4 5 6 7 and 8 Opened and Closed G 10 ...

Страница 12: ... List of figures x i i 365 372 304R7 1 Issue 1 November 2007 ...

Страница 13: ...S3 EC1 or TMUX cable assemblies 1 44 1 8 DS3 EC1 and TMUX transmission connections 1 50 1 9 12TMUX transmission connections 1 57 1 10 10 100BaseT Ethernet cable assemblies 1 60 1 11 10 100BaseT Ethernet connections 1 61 1 12 GbE Ethernet cables 1 63 1 13 LAN 10BaseT cable assemblies 1 67 1 14 LAN 10BaseT cross over cable connections 1 68 1 15 LAN 10BaseT straight through cable connections 1 68 1 1...

Страница 14: ...2 4 Installation tests 4 1 Cable lengths feet 4 5 4 2 DS1 Cross Connections 4 18 4 3 DS3 Cross Connections 4 33 4 4 Transmission rate 4 59 5 Operational tests 5 1 Office Alarm Connections 5 5 5 2 Miscellaneous Environmental Discrete Telemetry Connections 5 18 6 Ring setup and testing integration procedures 6 1 Attenuation Table 6 6 6 2 Attenuation table Pluggable Transmission Modules 6 7 A Laser s...

Страница 15: ...ovember 2007 E Installation checklist E 1 Installation Acceptance Checklist E 1 G Pluggable transmission module installation G 1 Alcatel Lucent Approved Pluggable Transmission Modules G 2 G 2 Insert Pluggable Transmission Module Into Socket G 11 ...

Страница 16: ... List of tables x v i 365 372 304R7 1 Issue 1 November 2007 ...

Страница 17: ...ou may receive a mixture of the company logo and product names on any of these items For example a document may say 1665 DMX while the software says Metropolis DMX Despite the name change rest assured that Metropolis DMX and 1665 DMX are the same product with the same product features interoperability and operations remain unchanged Reason for reissue This document is being reissued to include inf...

Страница 18: ...d DS1 and DS3 capacity Chapter 2 Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX This chapter provides information for verifying that the shelf is being supplied with the proper power and provides instructions for circuit pack installation Part II 1665 Data Multiplexer 1665 DMX stand alone installation tests Chapter 3 Software download and circuit pack installatio...

Страница 19: ...tput ports found on the 1665 DMX circuit packs Appendix D Backplane pin replacement This appendix provides information and the procedures used when a pin or blade on the 1665 DMX backplane has been bent or broken Appendix E Installation checklist This appendix provides a checklist to ensure that all necessary procedures have been completed Use of the installation checklist is required to ensure a ...

Страница 20: ...the minimum 1 megohm resistance Plug in storage Circuit packs should be stored in static safe packaging or in a grounded cabinet For additional safety precautions please see the 1665 Data Multiplexer 1665 DMX User Operations Guide Laser safety For more detailed information and safety precautions refer to Appendix A Laser safety and classifications and Electrostatic Discharge ESD considerations Con...

Страница 21: ...ation Manual 365 372 306R7 1 1665 Data Multiplexer Release 7 1 TL1 Message Details 1665 Data Multiplexer Software Release Description Paper 109665943 CD ROM 109665950 1665 DMX drawings ED8C871 10 1665 Data Multiplexer Release 1 0 7 1 0 Engineering and Ordering Information ED8C871 20 1665 Data Multiplexer Release 1 0 7 1 0 Interconnect Information Document support Alcatel Lucent provides a referral...

Страница 22: ...r from the waste stream Additionally reuse recovery and or recycling targets for the return and or collection of the packaging waste may be established For more information regarding collection and recovery of packaging and packaging waste within specific jurisdictions please contact the Alcatel Lucent Field Services Installation Environmental Health and Safety organization For installations not p...

Страница 23: ...3 August 2005 Moreover in compliance with legal requirements and contractual agreements where applicable Alcatel Lucent will offer to provide for the collection and treatment of Alcatel Lucent products at the end of their useful life Alcatel Lucent will also offer to provide for the collection and treatment of existing products displaced by Alcatel Lucent equipment For information regarding take b...

Страница 24: ... About this document x x i v 365 372 304R7 1 Issue 1 November 2007 ...

Страница 25: ...also covers initial circuit pack installation not seated Important The high capacity shelf does not require the installation of an additional fan shelf since the fan unit is integral to the shelf itself Check Figure 1 1 1665 DMX High Capacity shelf backplane p I 2 to determine if the shelf is a 1665 DMX High Capacity shelf shelf If the shelf you are installing is NOT equipped with the additional m...

Страница 26: ... OUT J4 B IN J2 A IN J13 ALM MULT J12 ALM J18 DLAN J10 X 25 J5 C IN J7 D IN NC DMX 156 J22 C IN J23 D IN J26 C OUT J27 D OUT J20 A IN J21 B IN J24 A OUT J25 B OUT IN OUT EXP2 EXP1 IN OUT CTL 48RTNB P15 J14 SYNC2 J11 MISC J17 MODEM J9 SYNC1 P14 48RTNA 48VA 48VB CTL J15 FAN Equipment and cable installation for 1665 Data Multiplexer 1665 DMX Chapter 1 Powering and initial circuit pack installation fo...

Страница 27: ...ing the 1665 DMX shelf to the frame It is also used when reattaching the mounting brackets to the 1665 DMX shelf 1 Multimeter Optional ITE 6379C The voltmeter must be capable of measuring DC voltage in the 40 to 60 volt range The use of the voltmeter is optional since the shelf will alarm or shut down if the proper voltage is not supplied 1 Ohmmeter ITE 6379C An ohmmeter is required to verify that...

Страница 28: ...esting of the individual ports 2 20 dB LC Type LBO ITE 7196 108279530 Two 20 dB LBOs are required when optically looping the 1665 DMX shelf equipped with LNW60 2 LC Type Optical Fiber Jumper 108918269 Two optical fiber jumpers with LC type connectors are required to optically loop the 1665 DMX shelf for test purposes Noyes OFS 300 200X Optical Fiber Scope ITE 7129 Optical Fiber Scope 2 5 mm Univer...

Страница 29: ...Type A Reel Luminex Stick Port Cleaners ITE 7134 ITE 7135 1 25 mm and 2 5 mm sizes Luminex Cloth R 6033 5 5 x 5 5 Registered trademark of Thomas Betts Corporation Registered trademark of Paladin Corporation Quantity Description Comments Quantity Description Comments 1 Personal Computer PC See PC minimum requirements below 1 CIT Interface Cable 8 ft long RJ45 to 9 pin D sub serial cable Comcode 848...

Страница 30: ...ocessor type and speed and the memory size will all factor into CIT performance Components Minimum Recommended Processor Pentium 266 MHz Pentium III 500 MHz RAM 1 system view 128 MB 256 MB RAM up to 5 system views 256 MB 256 MB Virtual Memory 139 MB 267 MB Available Hard Disk Space Available hard disk space required to install and store the CIT and Generic Software is approximately 250 MB it is 55...

Страница 31: ...Inspection 1 8 1665 DMX High Capacity shelf installation 1 9 Heat baffle installation 1 14 Power cable and cable bracket installation 1 16 Fiber management installation optional 1 27 Installing the fiber ducts optional 1 31 Cable and optical fiber installation 1 32 DS1 cable installation 1 34 DS3 EC1 and 48TMUX cable installation 1 41 12TMUX LNW18 cable installation 1 54 10 100BaseT backplane Ethe...

Страница 32: ...allation 1 72 Office alarm cable installation 1 78 Miscellaneous environmental discrete telemetry cable installation 1 84 Main optical fiber installation OC 12 OC 48 OC 192 1 88 Fiber installation for low speed packs 1 90 1000Base F and 100Base F fiber installation 1 92 Fibre channel fiber installation 1 94 CIT cable installation 1 96 Final operations 1 99 ...

Страница 33: ...lling the interfacing cables and for setting the circuit breakers to the OFF position 1 Thomas Betts R 5648B Crimping Tool The crimping tool wire stripper and soldering iron are only required if installing DS3 cables The replacement cassette is for the wire stripper tool 1 Paladin Coaxial Wire Stripper R 5648B D5 Replacement Paladin Cassette R 5648B D5 1 Wire Wrap Gun R 4496A The wire wrap gun is ...

Страница 34: ...ed to the Lambda Unite MSS configurations In order for the 1665 DMX shelf to be placed in a NEBS 2000 Cabinet frame combined with Lambda Unite MSS mounting kit 848856514 is required For a more complete view of mounting the 1665 DMX into the Lambda Unite Frame see SIG L WW 161A 1665 DMX added to the Lambda Unite MSS Configurations Cabling checklist This section briefly describes cabling information...

Страница 35: ...semblies are required for each Function Unit equipped for 28 DS1 service LNW6 LNW7 Four DS1 Cable Assemblies are required for each Function Unit equipped for 56 DS1 service LNW8 Each DS1 Cable Assembly consists of two separate cable assemblies both containing 28 pairs of 24 gauge cable One cable is for input and the other cable is for output Cable assembly description Required See note Power Yes 1...

Страница 36: ... One cable is required for channels 1 through 12 and another for channels 13 through 24 LNW66 and LNW71 LNW74 provides only ports 1 through 16 8 When cabling the 1665 DMX High Capacity shelf for office alarm applications one Office Alarm Cable Assembly is required for the bottom 1665 DMX shelf in a bay frame One Office Alarm Mult Cable Assembly is required for each additional 1665 DMX shelf in the...

Страница 37: ...f some of the connectors used to interface with the 1665 DMX Figure 1 1 Connector types and pinouts DB 9 male type connector DB 15 male type connector DB 25 male type connector DB 62 male type connector 1 5 6 9 1 8 9 15 1 13 14 25 1 21 43 62 22 42 DB 9 female type connector DB 15 female type connector DB 25 female type connector DB 62 female type connector 1 5 6 9 8 1 15 9 13 1 24 14 21 1 62 43 42...

Страница 38: ...before installing the 1665 DMX High Capacity shelf and cables Procedure 1 Inspect the shelf for visible damage including bent or touching backplane pins Important If any backplane pins are damaged refer to Appendix D Backplane pin replacement for instructions on repairing the damaged pin s 2 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 39: ...e Proceed as follows 1 Determine the mounting configuration for the 1665 DMX High Capacity shelf Type of bay frame 23 inch or 19 inch wide Mounting position front or rear Position in bay bottom to top Important The 1665 DMX High Capacity shelf is shipped with the mounting brackets positioned for mounting to the rear of a 23 inch wide network bay frame The 1665 DMX High Capacity shelf mounting brac...

Страница 40: ...pacity shelf installation Equipment and cable installation for 1665 Data Multiplexer 1665 DMX 1 1 0 365 372 304R7 1 Issue 1 November 2007 Figure 1 2 1665 DMX High Capacity shelf mounting bracket positions 23 inch frame ...

Страница 41: ...ting arrangements p 1 12 shows the recommended mounting positions Start at the bottom of the bay and add shelves from bottom to top Important There is a switch on the fan unit controller board It is labeled CF ALM ON Clogged Filter Alarm ON and CF ALM OFF Clogged Filter OFF The fan ships with the switch in the disable position which prevents the filter alarm from working To enable the filter alarm...

Страница 42: ... in the frame and secure it to the frame using the thread forming screws included with the shelf 4 screws per side Tighten the screws to 21 in lb minimum 30 in lb maximum Important Be sure to mount the shelf using the thread forming screws provided with the shelf to ensure a solid ground connection from the bay to the shelf Figure 1 4 Typical 1665 DMX High Capacity shelf bay mounting arrangements ...

Страница 43: ...ce ground lug on the bay frame Requirement The ohmmeter reads less than 1 ohm 6 If the Ohmmeter reading is not less than 1 ohm a secondary ground should be used for each shelf Use an 8 AWG wire from the UL Green M5 Screw safety ground on the side of the shelf to bay frame or office ground Important It is important to remove the paint in the area where the wire is to be connected to the bay and to ...

Страница 44: ... wide Mounting position front or rear Position in bay below shelf mounted above non DMX heat generating equipment Important The heat baffle is shipped with the mounting brackets positioned for mounting to the rear of a 23 inch wide network bay frame The heat baffle mounting brackets may have to be repositioned and remounted depending on the frame type and mounting position front or rear 2 If neces...

Страница 45: ...Heat baffle installation Equipment and cable installation for 1665 Data Multiplexer 1665 DMX 365 372 304R7 1 Issue 1 November 2007 1 1 5 Figure 1 5 Heat baffle position E N D O F S T E P S ...

Страница 46: ...Two feeders A and B are required from the battery distribution fuse board BDFB or battery distribution circuit breaker bay BDCBB to the 1665 DMX bay Table 1 2 Power cable assemblies p 1 25 and Table 1 3 Power connections p 1 26 list the available power cable assemblies and power connections respectively Procedure Proceed as follows 1 Install cable brackets two per 1665 DMX High Capacity shelf 1 on...

Страница 47: ... 1 November 2007 1 1 7 Figure 1 6 Cable brackets Important Depicted above is the 1665 DMX shelf for reference purposes only the cable bracket is the same for the 1665 DMX High Capacity shelf 2 If installation is on raised floors rotate the power connectors on each side of the shelf 180 degrees as shown CABLE BRACKET sold separately ...

Страница 48: ...ity shelf chassis as shown in Figure 1 7 Power connector mounting positions p 1 19 It is recommended that if multiple shelves are being installed in a frame the power connector positions be alternated as shown in Figure 1 8 Alternating power cable routing p 1 20 Determine if the power connector needs to be moved to the other mounting position If so move the power connector to the other mounting po...

Страница 49: ...r 1665 DMX High Capacity shelf shelves in a standard bay frame The side view shows the power connectors for shelves 3 and 1 mounted closest to the rear of the shelves default position with the cabling for shelf 1 bending away from the power connector on shelf 3 and running over it until the power cables exit the bay The power connectors for shelves 4 and 2 are mounted in the alternate position on ...

Страница 50: ...installation for 1665 Data Multiplexer 1665 DMX 1 2 0 365 372 304R7 1 Issue 1 November 2007 Figure 1 8 Alternating power cable routing 4 Connect power cable to the power connector housing on the 1665 DMX High Capacity shelf chassis Figure 1 9 Power connection p 1 21 ...

Страница 51: ...n in Figure 1 10 Power cable routing with cable bracket p 1 22 or Figure 1 11 Power cable routing without cable bracket p 1 23 Important The 1665 DMX High Capacity shelf is powered by 48 V DC CAUTION Equipment damage Ensure that the 4 pins inside the connector attached to the power cable are properly aligned before inserting the connector into the power connector housing Failure to do so may resul...

Страница 52: ...Figure 1 10 Power cable routing with cable bracket Important The shelf shown in Figure 1 10 is the 1665 DMX and not the 1665 DMX High Capacity shelf however the power cabling remains the same and is depicted here for reference CAUTION Verify that the BDCBB breakers are off or that the BDFB fuses are not installed POWER CABLE POWER CONNECTOR CABLES BRACKET ...

Страница 53: ...The shelf shown in Figure 1 10 is the 1665 DMX and not the 1665 DMX High Capacity shelf however the power cabling remains the same and is depicted here for reference 6 Splice feeders from the BDCBB or BDFB to the 1665 DMX High Capacity shelf power cable Refer to Table 1 3 Power connections p 1 26 Important Four cables are spliced to each power cable 1 BAT A 2 BAT A RTN 3 BAT B 4 BAT B RTN POWER PO...

Страница 54: ... the BDCBB should be rated 1 25 times the rating of the circuit breaker on the shelf For the BDFB the fuse rating should be 1 5 times the rating of the circuit breaker on the shelf 8 Leave the BDCBB breakers off or BDFB fuses out until you are ready to perform the procedures in Chapter 2 Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX of this manual 9 Check off th...

Страница 55: ... Cable gauge Cable assembly Cable length feet 1665 DMX High Capacity shelf backplane connections Power cable 10 848841839 12 Connectors mounted on sides of the shelf BAT A and BAT B 6 848635009 12 848635033 50 848635041 75 848635058 100 4 848935268 35 848634986 55 848635025 100 2 848935276 55 848634978 85 848635017 100 Cable connector kit 2 848635231 4 848635249 6 848635934 Cable bracket 846593002...

Страница 56: ...T A 2 W 48RTNA BAT A RTN P15 BAT B 1 R 48VB BAT B 2 W 48RTNB BAT B RTN Notes 1 Power cables for shelves 4 and 2 are mounted using the connector mounting holes located closest to the rear of the shelves with the cabling for shelf 2 bending away out from the power connector in shelf 4 and running over it until the power cables exit the bay The power runs for shelves 1 and 3 are run in the same manne...

Страница 57: ...h side This is typically done using base fillers Comcode numbers are in parentheses next to the part number Procedure 1 Locate three spools 106738156 one fiber radius control module 321 1B one left fiber spool bracket 848919213 and 3 M4 X 6 bracket mounting screws 901340059 for each shelf being installed 2 For each spool put a nylach fastener through the middle Then insert a pin halfway through Im...

Страница 58: ...007 4 Spin the spool until the peg on its back fits into the smaller hole on the arm of the bracket This will keep the spool from spinning any further 5 Push the pin until it is completely fastened 6 Repeat Step 3 through Step 5 for all the spools with three per bracket 7 Attach one fiber radius control module to the bottom of each bracket as shown ...

Страница 59: ... halfway through Important It is very important that the pin is not completely inserted This will deform the fastener and prevent it from being assembled to the bracket 12 Line up the nylach fastener in one of the spools with the large holes on the top arm of the bracket 13 Spin the spool until the peg on its back fits into the smaller hole on the arm of the bracket This will keep the spool from s...

Страница 60: ...4R7 1 Issue 1 November 2007 19 Using a label maker create 16 labels LS and 8 labels HS 20 Attach the HS labels to the uppermost spool on each of the brackets 21 Attach the LS labels to the middle and lower spools on each of the brackets 22 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 61: ...From the 848920476 Fiber Duct Components Kit locate 2 fiber ducts 848955845 6 metal fiber duct brackets 848915153 12 12 24 X 3 8 HWH screws 901211177 and 6 M5 X 8 901340547 2 Using the 12 24 X 3 8 screws secure the metal brackets to the front of the bay three on each side using the holes in between shelf 1 and shelf 2 shelf 2 and shelf 3 shelf 3 and shelf 4 3 Position one of the fiber ducts along ...

Страница 62: ...st spool b Fiber management of low speed fibers should start with the lowest spool Once full fiber should be routed along the fiber radius control module and then up to the middle spool c As shown in the picture below fiber from the lowest spool low speed is routed in the outermost section of the fiber duct the middle spool low speed to the middle section and the upper spool high speed to the inne...

Страница 63: ...fiber installation Equipment and cable installation for 1665 Data Multiplexer 1665 DMX 365 372 304R7 1 Issue 1 November 2007 1 3 3 2 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 64: ...lf end and must be wire wrapped at the DSX end A total of four function groups fully cabled will have 224 DS1 drop capacity when the higher density DS1 circuit packs become available Important The connectorized cable end is grounded to the 1665 Data Multiplexer 1665 DMX frame ground through the backplane Alcatel Lucent recommends that the shield at both ends of the cable be grounded Ground at the ...

Страница 65: ...ure 1 12 DS1 cable installation p 1 35 Important DS1 cable retaining screws must be tightened to a maximum of 6 5 in lb Do not overtighten Figure 1 12 DS1 cable installation 3 Route the cables along the backplane and out of the bay to the DSX per Figure 1 13 DS1 cable routing p 1 36 48RTNA 48VA P14 J9 SYNC1 J15 FAN J11 MISC J14 SYNC2 P15 J17 MODEM 48RTNB 48VB J16 IAOLAN J19 INTEROP J10 X 25 J18 DL...

Страница 66: ...uting 4 Route the cables along the cable rack and into the terminating bay 5 Remove slack and cut the DS1 cables to the desired length at the DSX 6 Referring to Table 1 5 DS1 transmission connections p 1 38 carefully observe color codes and wire wrap the cables at the DSX 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 67: ...55 848790788 Notes 1 Each group listed includes all the DS1 cables for one function group 2 One code provides one input and one output cable for 28 DS1 s i e for one DS1 function group e g J1 A OUT J2 A IN 3 For Input connections use cable CA1 DS1 IN and for Output connections use cable CA2 DS1 OUT 4 Cables are terminated in J1 through J8 and J20 through J27 connectors at the 1665 DMX High Capacit...

Страница 68: ...B6 B5 B4 B3 B2 B1 W BL W O W G W BR 19 40 18 39 60 59 17 38 J2 A In J1 A Out J4 B In J3 B Out J5 C In J6 C Out J7 D In J8 D Out 2 1 5 2 6 3 7 4 8 B8 B7 B6 B5 B4 B3 B2 B1 W S R BL R O R G 58 57 16 37 15 36 14 35 3 1 9 2 10 3 11 4 12 B8 B7 B6 B5 B4 B3 B2 B1 R BR R S BK BL BK O 56 55 13 34 54 53 12 33 4 1 13 2 14 3 15 4 16 B8 B7 B6 B5 B4 B3 B2 B1 BK G BK BR BK S Y BL 11 32 10 31 52 51 9 30 5 1 17 2 1...

Страница 69: ...1 R BR R S BK BL BK O 56 55 13 34 54 53 12 33 4 1 41 2 42 3 43 4 44 B8 B7 B6 B5 B4 B3 B2 B1 BK G BK BR BK S Y BL 11 32 10 31 52 51 9 30 5 1 45 2 46 3 47 4 48 B8 B7 B6 B5 B4 B3 B2 B1 Y O Y G Y BR Y S 50 49 8 29 7 28 6 27 6 1 49 2 50 3 51 4 52 B8 B7 B6 B5 B4 B3 B2 B1 V BL V O V G V BR 48 47 5 26 46 45 4 25 7 1 53 2 54 3 55 4 56 B8 B7 B6 B5 B4 B3 B2 B1 V S W BL W O W G 3 24 2 23 44 43 1 22 DSX 1 conn...

Страница 70: ...wice White binder cables are for Channel 1 through 25 and 29 through 53 blue binder cables are for Channels 26 27 28 54 55 and 56 DSX 1 connections 1665 DMX High Capacity shelf backplane connections G r o u p Chan DS1 T R term T R color 62 pin conn Pin T R Function group A conn Function group B conn Function group C conn Function group D conn In Out In Out In Out In Out ...

Страница 71: ...X cable assemblies p 1 44 DS3 EC1 and TMUX transmission connections are in Table 1 8 DS3 EC1 and TMUX transmission connections p 1 50 A total of four function groups fully cabled will have 192 DS3 drop capacity Procedure Proceed as follows 1 Refer to the engineering job specification Obtain the DS3 cables per Table 1 7 DS3 EC1 or TMUX cable assemblies p 1 44 and note the function group where each ...

Страница 72: ... DS3 EC1 and 48TMUX cable routing p 1 43 Function group Associated connectors A A IN J2 and J20 A OUT J1 and J24 B B IN J4 and J21 B OUT J3 and J25 C C IN J5 and J22 C OUT J6 and J26 D D IN J7 and J23 D OUT J8 and J27 J8 D OUT J6 C OUT J19 INTEROP J16 IAOLAN J3 B OUT J1 A OUT J4 B IN J2 A IN J13 ALM MULT J12 ALM J18 DLAN J10 X 25 J5 C IN J7 D IN NC DMX 156 J22 C IN J23 D IN J26 C OUT J27 D OUT J20...

Страница 73: ...ength and install the BNC connectors shipped with the cable assemblies Important When installing BNC connectors follow the manufacturer s instruction carefully to ensure a proper connection Failure to do so may result in faulty DS3 signals as a result of improperly installed BNC connectors 7 Connect the cables to their respective positions on the terminating equipment Important The 12 port cable a...

Страница 74: ...embly Cable length feet 1665 DMX backplane connections DS3 1 12 Cables with ITT Canon BNC s for LNW16 LNW18 only 12 individual 735A coaxial cables with 12 ITT Canon 75ohm BNC plugs shipped loose 848955407 10 J1 J24 J2 J20 A OUT A IN J3 J25 J4 J21 B OUT B IN J6 J26 J5 J22 C OUT C IN J8 J27 J7 J23 D OUT D IN 848955415 20 848955423 30 848955431 40 848548277 50 848980504 60 848548285 100 848548293 150...

Страница 75: ...nd lengths 450ft use 10ft 735A spliced to 734D cable and 900ft is the maximum amount of 734D allowed between two DMX s This splice is factory made Stagger the splices in the cable rack to save space 849040688 10 J1 J24 J2 J20 A OUT A IN J3 J25 J4 J21 B OUT B IN J6 J26 J5 J22 C OUT C IN J8 J27 J7 J23 D OUT D IN 849040696 20 849040704 30 849040712 40 849040720 50 849040738 60 849040746 100 849040753...

Страница 76: ...BNC plugs shipped loose 848923124 10 J1 J24 J2 J20 A OUT A IN J3 J25 J4 J21 B OUT B IN J6 J26 J5 J22 C OUT C IN J8 J27 J7 J23 D OUT D IN 848923132 20 848923140 30 848923157 40 848839478 50 848923165 60 848923173 70 848923181 80 848923199 90 848839486 100 848923207 110 848923215 120 848923223 140 848838494 150 848923231 160 848923249 180 848923256 200 848839502 250 848923264 300 848923272 400 84883...

Страница 77: ...loose 849040886 10 J1 J24 J2 J20 A OUT A IN J3 J25 J4 J21 B OUT B IN J6 J26 J5 J22 C OUT C IN J8 J27 J7 J23 D OUT D IN 849040894 20 849040902 30 849040910 40 849040928 50 849040936 60 849040944 70 849040951 80 849040969 90 849040977 100 849040985 110 849040993 120 849041009 140 849041017 150 849041025 160 849041033 180 849041041 200 849041066 250 849041074 300 849041082 400 849041090 450 Descripti...

Страница 78: ...018 275 848932026 300 848932034 325 848932042 350 848932059 375 848932067 400 848932075 425 848839528 450 848839536 750 848839544 900 DS3 1 24 Cables with no BNC Similar to above except no BNC s are shipped loose 849041785 250 J1 J24 J2 J20 A OUT A IN J3 J25 J4 J21 B OUT B IN J6 J26 J5 J22 C OUT C IN J8 J27 J7 J23 D OUT D IN 849041793 275 849041801 300 849041819 325 849041827 350 849041835 375 849...

Страница 79: ... J7 J23 109508333 50 109508341 75 109508358 100 109508366 125 109508374 150 109508382 175 109508390 200 109508408 250 Notes 1 All the DS3 EC1 or TMUX cable assemblies can be used for any function group 2 1665 DMX High Capacity shelf connectors J1 through J8 and J20 through J27 can be used for either DS1 DS3 EC1 or TMUX 3 Each Cable assembly listed above contains two cable assemblies therefore a qu...

Страница 80: ... Ground 19 2 DS3 2R 2T Signal 17 FRG2 Ground 38 3 DS3 3R 3T Signal 57 FRG3 Ground 58 4 DS3 4R 4T Signal 13 FRG4 Ground 34 5 DS3 5R 5T Signal 53 FRG5 Ground 54 6 DS3 6R 6T Signal 10 FRG6 Ground 31 7 DS3 7R 7T Signal 51 FRG7 Ground 52 8 DS3 8R 8T Signal 6 FRG8 Ground 27 9 DS3 9R 9T Signal 47 FRG9 Ground 48 10 DS3 10R 10T Signal 4 FRG10 Ground 25 11 DS3 11R 11T Signal 24 FRG11 Ground 3 12 DS3 12R 12T...

Страница 81: ... 19R 19T Signal 9 FRG19 Ground 30 20 DS3 20R 20T Signal 49 FRG20 Ground 50 21 DS3 21R 21T Signal 28 FRG21 Ground 7 22 DS3 22R 22T Signal 5 FRG22 Ground 26 23 DS3 23R 23T Signal 45 FRG23 Ground 46 24 DS3 24R 24T Signal 43 FRG24 Ground 44 Connectors J20 J27 Ports 25 48 25 DS3 25R 25T Signal 40 FRG25 Ground 19 26 DS3 26R 26T Signal 17 FRG26 Ground 38 27 DS3 27R 27T Signal 57 FRG27 Ground 58 28 DS3 28...

Страница 82: ...Ground 48 34 DS3 34R 34T Signal 4 FRG34 Ground 25 35 DS3 35R 35T Signal 24 FRG35 Ground 3 36 DS3 36R 36T Signal 1 FRG36 Ground 22 37 DS3 37R 37T Signal 59 FRG37 Ground 60 38 DS3 38R 38T Signal 16 FRG38 Ground 37 39 DS3 39R 39T Signal 36 FRG39 Ground 15 40 DS3 40R 40T Signal 55 FRG40 Ground 56 41 DS3 41R 41T Signal 12 FRG41 Ground 33 42 DS3 42R 42T Signal 32 FRG42 Ground 11 43 DS3 43R 43T Signal 9 ...

Страница 83: ... 45 DS3 45R 45T Signal 28 FRG45 Ground 7 46 DS3 46R 46T Signal 5 FRG46 Ground 26 47 DS3 47R 47T Signal 45 FRG47 Ground 46 48 DS3 48R 48T Signal 43 FRG48 Ground 44 Notes 1 Lead designation for EC1 connection for cable x should be read as EC1 xR xT instead of DS3 xR xT where x is a number from 1 to 48 Coaxial cable Lead designation Name Connector pin ...

Страница 84: ...lane connects to the IN of the DSX and the OUT of the 1665 DMX High Capacity shelf backplane connects to the OUT of the DSX TMUX cable options are listed in Table 1 7 DS3 EC1 or TMUX cable assemblies p 1 44 TMUX transmission connections are in Table 1 9 12TMUX transmission connections p 1 57 Total of four function groups fully cabled will have 48 DS3 drop capacity Procedure Proceed as follows 1 Re...

Страница 85: ...ation for 1665 Data Multiplexer 1665 DMX 365 372 304R7 1 Issue 1 November 2007 1 5 5 Figure 1 16 12TMUX cable installation 3 Route the cables along the backplane and out of the bay to the DSX per Figure 1 17 TMUX cable routing p 1 56 OUT IN OUT IN IN OUT IN OUT ...

Страница 86: ...ong the cable rack and into the terminating bay DSX or other terminating transmission equipment 5 Cut the cables to desired length and install the BNC connectors shipped with the cable assemblies Important When installing BNC connectors follow the manufacturer s instruction carefully to ensure a proper connection Failure to do so may result in faulty DS3 signals as a result of improperly installed...

Страница 87: ...le Lead designation Name Connector pin 1 DS3 1R 1T Signal 40 FRG1 Ground 39 2 DS3 2R 2T Signal 17 FRG2 Ground 18 3 DS3 3R 3T Signal 57 FRG3 Ground 58 4 DS3 4R 4T Signal 13 FRG4 Ground 14 5 DS3 5R 5T Signal 53 FRG5 Ground 54 6 DS3 6R 6T Signal 10 FRG6 Ground 11 7 DS3 7R 7T Signal 51 FRG8 Ground 50 8 DS3 8R 8T Signal 6 FRG8 Ground 7 9 DS3 9R 9T Signal 47 FRG9 Ground 46 10 DS3 10R 10T Signal 4 FRG10 ...

Страница 88: ...ted directly to SFP modules on circuit pack faceplates if applicable Procedure Proceed as follows 1 Refer to the engineering job specification Obtain the 100BASE TX Ethernet cables per Table 1 10 10 100BaseT Ethernet cable assemblies p 1 60 and note the function group where each cable will be used Label the cables indicating bay shelf and function group A B C or D at each end 2 Connect the functio...

Страница 89: ...1 15 DS3 EC1 and 48TMUX cable routing p 1 43 4 Route the cables along the cable rack and into the terminating bay 5 Cut cable to length and punch down cable to the 110 block Refer to Table 1 11 10 100BaseT Ethernet connections p 1 61 for pin out assignments OUT IN OUT IN IN OUT IN OUT CAUTION The LNW66 LNW71 and LNW74 10 100BaseT Ethernet packs do not have lightning protection for the metallic con...

Страница 90: ...n Appendix E Installation checklist E N D O F S T E P S Table 1 10 10 100BaseT Ethernet cable assemblies Description Cable assembly Cable length feet 1665 DMX backplane connections 10 100baseT Ethernet cable 848819090 8 J1A ports 1 12 J2A ports 13 24 J3B ports 1 12 J4B ports 13 24 J6C ports 1 12 J5C ports 13 24 J8D ports 1 12 J7D ports 13 24 NOTE LNW74 has only ports 1 12 and ports 13 16 848778114...

Страница 91: ...5 26 T T 3 6 15 3 R BL 7 28 R R 1 2 W S 6 27 T T 3 6 16 4 R G 46 45 R R 1 2 R O 4 25 T T 3 6 17 5 R S 56 55 R R 1 2 R BR 13 34 T T 3 6 18 6 BK O 11 32 R R 1 2 BK BL 10 31 T T 3 6 19 7 BK BR 54 53 R R 1 2 BK G 12 33 T T 3 6 20 8 Y BL 52 51 R R 1 2 BK S 9 30 T T 3 6 21 9 Y G 19 40 R R 1 2 Y O 18 39 T T 3 6 22 10 Y S 58 57 R R 1 2 Y BR 16 37 T T 3 6 23 11 V O 60 59 R R 1 2 V BL 17 38 T T 3 6 24 12 V ...

Страница 92: ...ssue 1 November 2007 Ethernet cabling to SFP modules on circuit pack faceplates Description Use this section to run Category 5e cables to the SFP modules on the front of LNW63 LNW64 LNW70 or LNW170 Ethernet circuit packs Refer to Figure 1 19 Procedure Proceed as follows 1 Refer to Figure 1 19 Figure 1 19 Ethernet cable routing to faceplate SFP modules ...

Страница 93: ...S T E P S Description Cable assembly Cable length feet GbE Ethernet cables CAT5e Gigabit Ethernet shielded connectorized on both ends with straight RJ45 connector 849010483 5 849010491 10 849010509 15 849010517 20 849010525 25 849010533 30 849010541 40 849010558 50 849010566 60 849010574 70 849010582 80 849010590 90 849010608 100 849010616 110 849010624 120 849010632 130 849010640 140 849010657 15...

Страница 94: ...e cable is available in two configurations cross over and straight through and may be connected to either the front or rear of the 1665 DMX High Capacity shelf The following tables provide additional information Table 1 13 LAN 10BaseT cable assemblies p 1 67 Table 1 14 LAN 10BaseT cross over cable connections p 1 68 Table 1 15 LAN 10BaseT straight through cable connections p 1 68 Procedure Proceed...

Страница 95: ...ion to front of 1665 DMX High Capacity shelf Important The above Figure shows a standard 1665 DMX shelf as reference only The placement of the packs and PC lan port are the same on the 1665 DMX High Capacity shelf OUT IN OUT IN OUT IN OUT IN OUT IN 1 1 1 1 2 2 2 2 3 3 4 4 OFF ON BRK A 20A ON OFF ON BRK B 20A ON OUT IN To PC LAN port cross over cable or hub port straight thru cable ...

Страница 96: ...007 Figure 1 21 IAO LAN TCP IP cable installation to rear of 1665 DMX High Capacity shelf 3 If a cross over cable is used route the cable to the desired PC LAN port If a straight through cable is used route the cable to the desired hub port location 4 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S LAN Cable ...

Страница 97: ...s over cable 109321810 10 SYSCTL LAN jack J16 IAO LAN 848605028 50 848605036 100 848605051 150 848605069 200 848605077 300 LAN 10BaseT straight through cable 109321836 20 SYSCTL LAN jack J16 IAO LAN 109321844 30 109321851 40 848604948 50 109321869 60 109321877 70 109321885 80 109321893 90 848604955 100 109321901 110 109321919 120 109321927 130 109321935 140 848604963 150 109321943 160 109321950 18...

Страница 98: ...ovember 2007 Table 1 14 LAN 10BaseT cross over cable connections Table 1 15 LAN 10BaseT straight through cable connections Connection 1665 DMX High Capacity shelf f bkpl Color Other side J16 IAO LAN 1 BL W 3 2 W BL 6 3 O W 1 6 W O 2 Connection 1665 DMX High Capacity shelf bkpl Color Other side J16 IAO LAN 1 BL W 1 2 W BL 2 3 O W 3 6 W O 6 ...

Страница 99: ...city shelf to be accessed remotely via dial up Important Perform this procedure for the shelf that will be directly connected to a modem or a distribution frame if specified in the order Procedure Proceed as follows 1 Obtain the modem cable per Table 1 16 Modem cable assemblies p 1 71 Connect the RJ45 end of the modem cable to the MODEM port J17 of 1665 DMX High Capacity shelf See Figure 1 22 Mode...

Страница 100: ...r 2007 Figure 1 22 Modem cable installation 2 Route the modem cable out of the 1665 DMX High Capacity shelf bay to the modem or distribution frame 3 Dress and tie the modem cable to the 1665 DMX High Capacity shelf backplane per Figure 1 22 Modem cable installation p 1 70 4 Connect the modem cable to the modem or distribution frame ...

Страница 101: ...stallation checklist E N D O F S T E P S Table 1 16 Modem cable assemblies Table 1 17 Modem cable connections Description Cable assembly Cable length feet 1665 DMX High Capacity shelf connections Modem cable 848756508 50 J17 MODEM 848756524 100 848756516 150 848756532 250 Connection RJ45 connector pin Color DB25 Connector Pin Modem cable J17 1 W O 8 2 BR 20 3 W BL 3 5 O Shield 7 6 G 2 ...

Страница 102: ...ed This procedure should be performed on each 1665 DMX High Capacity shelf requiring an external timing source There are two types of cables available 1 Sync cable with a molded D Sub 9 Pin DB 9 connector 2 Sync cable with a wire wrap DB 9 connector Important Each of the Sync connections on the backplane provides an input gray and output red termination for timing Refer to Table 1 19 Synchronizati...

Страница 103: ...or installation 2 Route the cable to proper location and cut to desired length 3 Terminate the wires in the red jacket for an output signal 4 Terminate the wires in the gray jacket for an input signal 5 Repeat Step 1 through Step 4 to connect the Sync cable to the SYNC2 J14 port TO DS1 SYNCHRONOUS TIMING REFERENCE CABLE TIE TYPICAL TIE CABLE ASSY S TO CABLE SUPPORT BAR AS REQUIRED ...

Страница 104: ...nc cable with wire wrap DB 9 connector procedure Perform the following steps when using the Sync cable with the wire wrap DB 9 connector 1 Connect the wire wrap DB 9 connector to SYNC1 J9 Refer to Figure 1 24 Sync cable with wire wrap connector installation p 1 74 Figure 1 24 Sync cable with wire wrap connector installation TO DS1 SYNCHRONOUS TIMING REFERENCE CABLE TIE TYPICAL TIE CABLE ASSY S TO ...

Страница 105: ...D Sub connector for an output signal 3 Wire wrap Rx2 and Tx2 gray cable on the D Sub connector for an input signal 4 Route the cable to proper location and cut to desire length 5 Terminate the other end to a clock source or equipment 6 Repeat Step 1 through Step 5 for SYNC2 J14 connection 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 106: ...100 848923371 125 848839635 150 848923389 175 848923439 200 848923447 225 848839643 250 848923454 275 848923462 300 848839650 450 Sync cable with wire wrap DB 9 connector DS1 timing reference for DS1 external sync in out timing 848631255 50 848631271 100 848631289 150 848631297 250 848631305 450 Sync cable with filter connector sync input signal only DS1 timing reference for DS1 external sync in t...

Страница 107: ...304R7 1 Issue 1 November 2007 1 7 7 Table 1 19 Synchronization cable DS1 timing reference connections Conn Jacket Color 9 Pin conn Special conn Designation Name Sync1 J9 Sync2 J14 Red BL 1 Rx1 RGO1 RGO2 Sync Output W 6 Tx1 TPO1 TPO2 Gray BL 2 Rx2 RGI1 RGI2 Sync Input W 7 Tx2 TPI1 TPI2 Drain 5 GND GRD ...

Страница 108: ...n the voltage and current limits If these protection devices are not sufficient an external buffer relay MUST be provided In all cases and as a matter of good practice suppression devices such as diodes or contact protection networks must be provided across any external relay coil being driven by the 1665 DMX High Capacity shelf to limit transient voltages and currents Office alarm cable assemblie...

Страница 109: ...arm cable to ALM J12 of the bottom 1665 DMX High Capacity shelf 2 Route the office alarm cable from the bottom shelf out of the 1665 DMX High Capacity shelf bay per Figure 1 25 Office alarm cable installation p 1 79 to the office alarm panel Figure 1 25 Office alarm cable installation 3 Inspect the office alarm panel and add a contact protection network if required CABLE TIE TYPICAL TIE CABLE ASSY...

Страница 110: ...office alarms in a bay to the bottom shelf In this procedure the bottom shelf is multed to the shelf immediately above That shelf is then multed to the shelf above it Continue until the top shelf is connected Important In order for office alarms in a shelf other than the bottom shelf to be reported all office alarm cable mults from that shelf to the bottom shelf must be in place No shelf should be...

Страница 111: ...65 372 304R7 1 Issue 1 November 2007 1 8 1 Figure 1 26 Office alarm mult cable installation 848589602 CABLE ASSEMBLY CONNECT THIS END OF CABLE ASSEMBLY AS FOLLOWS FROM TO PATCH CONNECTOR TO PANEL POSITION OFFICE ALARM MULT J13 ALM MULT CONNECT OTHER END OF CABLE ASSEMBLY TO SUCCEEDING DMX SHELF J12 ALM ...

Страница 112: ... 4 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S Table 1 20 Office alarm cable assemblies Description Cable assembly Cable length feet 1665 DMX backplane connections Office alarm cable 848558193 50 J12 848562286 100 848562294 150 848562302 250 Office alarm mult cable DMX to DMX 848589602 3 J13 Office alarm mult cable DMX to Lambda Unite 848861530 3 J13 ...

Страница 113: ... RYMNV2 RYMNA1 RYMNA2 Minor Alarm Visible Minor Alarm Visible Return Minor Alarm Audible Minor Alarm Audible Return 9 10 11 12 S W W S BL R R BL RYCRV1 RYCRV2 RYCRA1 RYCRA2 Critical Alarm Visible Critical Alarm Visible Return Critical Alarm Audible Critical Alarm Audible Return Notes 1 The SYSCTL circuit pack reports office alarms 2 The connection to the central office alarms from P12 is run for e...

Страница 114: ... to remotely initiate up to four contact closures at the remote terminal RT for equipment operation such as pumps generators etc The environmental alarm status indications allow up to 23 miscellaneous user settable alarm status indications SI at the remote terminal for transmission toward the central office Miscellaneous environmental discrete telemetry cable assemblies and the length options are ...

Страница 115: ... Miscellaneous discrete cable installation p 1 85 to the telemetry panel 3 Cut the miscellaneous environmental discrete telemetry cable to the desired length at the telemetry panel 4 Wire wrap the loose end of the miscellaneous environmental discrete telemetry cable to the wire wrap terminal strip making connections per Table 1 23 Miscellaneous environmental discrete telemetry connections p 1 87 T...

Страница 116: ... input common and the other lead should be connected to the appropriate alarm indication For each output one lead should be connected to output common and the other lead should be connected to the appropriate alarm indication 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S Table 1 22 Miscellaneous discrete cable assemblies Description Cable assembly Cable l...

Страница 117: ... Input 4 5 6 7 8 G W W G BR W W BR TLMI5 TLMI6 TLMI7 TLMI8 Env Input 5 Env Input 6 Env Input 7 Env Input 8 9 10 11 12 S W W S BL R R BL TLMI9 TLMI10 TLMI11 TLMI12 Env Input 9 Env Input 10 Env Input 11 Env Input 12 13 14 15 16 O R R O G R R G TLMI13 TLMI14 TLMI15 TLMI16 Env Input 13 Env Input 14 Env Input 15 Env Input 16 17 18 19 20 BR R R BR S R R S TLMI17 TLMI18 TLMI19 TLMIC48VTRN Env Input 17 En...

Страница 118: ... OLIUs Important The optical fiber cable is fragile and must be protected The fibers should be placed in a protective tube or channel such as PVC tubing or PANDUIT cable channel when running the cable from the 1665 DMX High Capacity shelf to the cable rack The fibers should be placed in the cable rack in a protective channel with nothing on top of them Cable ties should NOT be used with the optica...

Страница 119: ...1 Route the optical fiber cables from the interconnecting equipment into the 1665 DMX High Capacity shelf Important Protective covers must be left on fibers 2 Place the optical fiber cables in a protective tube or channel 3 Label the optical fiber cables indicating bay shelf pack and direction IN or OUT 4 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 120: ...e protected The fibers should be placed in a protective tube or channel such as PVC tubing or PANDUIT cable channel when running the cable from the 1665 DMX to the cable rack The fibers should be placed in the cable rack in a protective channel with nothing on top of them Cable ties should NOT be used with the optical fiber cables Important Ensure only ANGLED LC connectors appear at IN ports of op...

Страница 121: ...ill be inserted The OC 3 OC 12 OC 48 pack can be inserted into any of the function slots including the growth slots 2 Label the optical fiber cables indicating bay shelf function group pack and direction IN or OUT 3 Route optical fiber cables from the interconnecting equipment into the OC 3 OC 12 OC 48 optical ports 4 Place the optical fiber cables in a protective tube or channel 5 Check off the a...

Страница 122: ...ective tube or channel such as PVC tubing or PANDUIT cable channel when running the cable from the 1665 DMX High Capacity shelf to the cable rack The fibers should be placed in the cable rack in a protective channel with nothing on top of them Cable ties should NOT be used with the optical fiber cables Unterminated optical connectors may emit laser radiation Do not view an unterminated optical con...

Страница 123: ...ports can be used when LNW74 is located in the Growth 1 position 2 Label the optical fiber cables indicating bay shelf function group pack and direction IN or OUT 3 Route optical fiber cables from the interconnecting equipment into the optical ports 4 Place the optical fiber cables in a protective tube or channel 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E ...

Страница 124: ...channel such as PVC tubing or PANDUIT cable channel when running the cable from the 1665 DMX to the cable rack The fibers should be placed in the cable rack in a protective channel with nothing on top of them Cable ties should NOT be used with the optical fiber cables Unterminated optical connectors may emit laser radiation Do not view an unterminated optical connector with optical instruments Inv...

Страница 125: ...9 5 2 Label the optical fiber cables indicating bay shelf function group pack and direction IN or OUT 3 Route optical fiber cables from the interconnecting equipment into the optical ports 4 Place the optical fiber cables in a protective tube or channel 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 126: ...serial port This will allow communications between the PC and the CIT port located on the LNW2 Procedure 1 Connect the RJ45 end of the CIT cable to the CIT jack located on the LNW2 SYSCTL Refer to Figure 1 28 CIT cable installation p 1 97 Important The LNW2 SYSCTL is not in the shelf at this time this procedure is here to demonstrate the placement of the cable once the circuit pack is in place 2 C...

Страница 127: ...ovember 2007 1 9 7 Figure 1 28 CIT cable installation 3 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S Table 1 24 CIT Cable Assembly Description Cable assembly Cable length 1665 DMX High Capacity shelf connections Front CIT cable 848748869 8 feet CIT RS 232 jack on SYSCTL LNW2 ...

Страница 128: ...G 5 Ground 5 FTXD O 2 Receive Data 6 FRXD G 3 Transmit Data Notes 1 The connection and the colors shown above are for a standard Lucent made cable If you use a RJ 45 to DB 9 connector with a standard straight through 10BaseT LAN cable refer to Table 1 26 RJ 45 to DB 9 connector connections p 1 98 From RJ45 connector To 9 pin D type connector Pin Color Pin 1 Blue 6 3 Black 4 4 Red 5 5 Green 2 6 Yel...

Страница 129: ...tion Final check on equipment and cable installation Procedure Proceed as follows 1 Verify that all the cables are properly dressed connected 2 Verify that all cables are properly labeled 3 Verify that designations where cables were wire wrapped are properly labeled 4 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 130: ... Final operations Equipment and cable installation for 1665 Data Multiplexer 1665 DMX 1 1 0 0 365 372 304R7 1 Issue 1 November 2007 ...

Страница 131: ...orming the following Shelf powering Circuit pack option settings and installation Detailed information on the function of each circuit pack is contained in 365 372 300 1665 Data Multiplexer Applications and Planning Guide Contents This chapter provides information on the following topics Description 2 2 Powering 2 3 Circuit pack compatibility 2 7 Initial circuit pack installation 2 12 ...

Страница 132: ...nting brackets installing the interfacing cables and for setting the circuit breakers to the OFF position 1 ESD Wrist Strap A wrist strap must be worn when handling circuit packs Use the electrostatic discharge ESD jack provided on the shelf 1 Multimeter Optional The voltmeter must be capable of measuring DC voltage in the 40 to 60 volt range The use of the voltmeter is optional since the shelf wi...

Страница 133: ...y that the frame or structure into which the 1665 DMX High Capacity shelf is installed is properly grounded 2 Verify that both circuit breakers on the 1665 DMX High Capacity shelf are in the ON position These breakers are located on the front of the 1665 DMX High Capacity shelf 3 Disconnect the power cables from the backplane connectors P15 from J15 and P14 from J14 Item Description Voltage range ...

Страница 134: ...reakers are being used use circuit breakers that are rated 1 25 times higher than the circuit breaker value on the shelf in the BDCBB that powers the 1665 DMX High Capacity shelf Then switch the breakers to the ON position for the 1665 DMX High Capacity shelf A and B feeders Important The 30 ampere shelf is comcode 848793287 The 20 ampere shelf is comcode 848935193 J8 D OUT J6 C OUT J19 INTEROP J1...

Страница 135: ...s to the OFF position 8 Reconnect the A feed of the power cable to the backplane connector P14 to J14 and reconnect the B feed of the power cable to the backplane connector P15 to J15 9 Place both circuit breakers on the 1665 DMX High Capacity shelf in the ON position 10 Verify that the fans have started running 11 At the BDFB either remove the fuse or put the circuit breaker associated with the B...

Страница 136: ...s lighted with only the B feed powered 15 At the BDFB either insert the fuse or put the circuit breaker associated with the A feed of the 1665 DMX High Capacity shelf in the ON position 16 Verify that the both the PWR A LED and PWR B LED on the 1665 DMX High Capacity shelf user panel are lighted with both the A and B feeds powered 17 Verify that the fans are still running and are moving air 18 Che...

Страница 137: ...7 1 circuit pack compatibility Slot name A1 A2 B1 B2 G1 M1 CTL G2 M2 C1 C2 D1 D2 LNW2 LNW6 LNW6 LNW6 LNW6 LNW7 LNW7 LNW7 LNW7 LNW8 LNW8 LNW8 LNW8 LNW16 LNW16 LNW16 LNW16 LNW18 LNW18 LNW18 LNW18 LNW19 LNW19 LNW19 LNW19 LNW19B LNW19B LNW19B LNW19B LNW20 LNW20 LNW20 LNW20 LNW20 LNW20 LNW27 LNW27 LNW29 LNW29 LNW31 LNW31 LNW31 LNW31 LNW31 LNW31 LNW32 LNW32 LNW36 LNW36 LNW36 LNW36 LNW36 LNW36 LNW37 LNW3...

Страница 138: ...66 LNW66 LNW66 LNW66 LNW67 LNW67 LNW67 LNW67 LNW67 LNW67 LNW68 LNW68 LNW68 LNW68 LNW68 LNW68 LNW70 LNW70 LNW70 LNW70 LNW70 LNW70 LNW71 LNW71 LNW71 LNW71 LNW73 LNW73 LNW73 LNW73 LNW73 LNW73 LNW73C LNW73C LNW73C LNW73C LNW73C LNW73C LNW74 LNW74 LNW74 LNW74 LNW74 LNW74 LNW76 LNW76 LNW78 LNW78 LNW78 LNW78 LNW78 LNW78 LNW80 LNW80 LNW82 LNW82 LNW93 LNW93 LNW93 LNW93 LNW94 LNW94 LNW94 LNW94 LNW97 LNW98 L...

Страница 139: ...e alarm would be raised Important LNW26B LNW28 LNW77 and the LNW1xxB series circuit packs are not supported in R7 1 OC 12 Circuit Packs with 12 STS 1 switch fabric LNW48 LNW50 LNW54 OC 48 Circuit Packs with 12 STS 1 switch fabric Important LNW26B LNW28 LNW77 and the LNW1xxB series circuit packs are not supported in R7 1 LNW202 LNW202 LNW221 to LNW259 LNW221 to LNW259 LNW421 to LNW459 LNW421 to LNW...

Страница 140: ...it Packs with 48 STS 1 switch fabric LNW27 LNW29 LNW32 LNW76 LNW202 LNW221 259 OC 192 Circuit Packs with 48 STS 1 switch fabric LNW56 LNW57 LNW58 LNW60 LNW502 LNW523 LNW527 LNW554 LNW555 Main Switch Pack no optics with 96 STS 1 switch fabric LNW80 OC 192 Circuit Packs with 192 STS 1 switch fabric VLF LNW59 LNW82 Once a high speed OLIU is installed and placed in service another OLIU with a differen...

Страница 141: ...Circuit pack compatibility Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX 365 372 304R7 1 Issue 1 November 2007 2 1 1 Figure 2 2 1665 DMX High Capacity shelf ...

Страница 142: ...erforming the procedures in this section to prevent spurious alarms from being reported Reconnect the office alarm cable after completion of all testing To protect against damage due to electrostatic discharge a properly grounded ESD wrist strap must be worn when handling equipment Important When only one main OLIU OC 12 OC 48 OC 192 or main switch pack LNW80 is required it must be installed in th...

Страница 143: ...elf LNW27 LNW29 LNW32 LNW76 LNW202 SFP optics LNW221 259 Important From your work orders determine the wavelength that you wish to set on the LNW221 LNW259 Use the Channel Select Option Label on the faceplate of the circuit pack to determine the correct channel Refer to Figure 2 3 LNW221 259 channel positions p 2 15 for channel jumper location 1 Remove the first OC 48 OLIU circuit pack from the pa...

Страница 144: ...lf See Figure 2 2 1665 DMX High Capacity shelf p 2 11 6 Place the second OLIU circuit pack into the M2 slot on the 1665 DMX High Capacity shelf Do NOT engage the circuit pack in the backplane connector Important If any of the Main slots are to remain unequipped install a blank circuit pack to provide proper air flow for cooling 7 Check off the appropriate box in Appendix E Installation checklist E...

Страница 145: ...ue 1 November 2007 2 1 5 Figure 2 3 LNW221 259 channel positions OC192 main OLIU installation Follow this procedure to install the following OC 192 OLIU circuit packs in the 1665 DMX High Capacity shelf LNW56 LNW57 LNW58 LNW59 VLF LNW60 LNW502 SFP optics LNW523 LNW527 LNW554 LNW555 Connector Side nc dmx 244 Faceplate Side X Y CH X CH Y ...

Страница 146: ... M2 slot on the 1665 DMX High Capacity shelf See Figure 2 2 1665 DMX High Capacity shelf p 2 11 6 Place the second OLIU circuit pack into the M2 slot on the 1665 DMX High Capacity shelf Do NOT engage the circuit pack in the backplane connector Important If any of the Main slots are to remain unequipped install a blank circuit pack to provide proper air flow for cooling Always use Main 1 M1 for she...

Страница 147: ...slot on the 1665 DMX High Capacity shelf Do NOT engage the circuit pack in the backplane connector Important If any of the Main slots are to remain unequipped install a blank circuit pack to provide proper air flow for cooling Always use Main 1 M1 for shelves equipped with only one main pack 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S 8OC 3 8OC 12 2OC 4...

Страница 148: ...apacity shelf p 2 11 6 Place the second OLIU circuit pack into the M2 slot on the 1665 DMX High Capacity shelf Do NOT engage the circuit pack in the backplane connector Important If any of the Main slots are to remain unequipped install a blank circuit pack to provide proper air flow for cooling Always use Main 1 M1 for shelves equipped with only one main pack 7 Check off the appropriate box in Ap...

Страница 149: ...ipped install a blank circuit pack to provide proper air flow for cooling 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S LNW785 OMD5 8 8 channel low loss DWDM Optical Mux Demux Follow this procedure to install the LNW785 circuit packs in the 1665 DMX High Capacity shelf The LNW785 OMD5 8 circuit pack multiplexes demultiplexes up to 8 DWDM optical channels ...

Страница 150: ...DS1E1 circuit packs into the 1665 DMX High Capacity shelf Important LNW6 and LNW7 are not supported with LNW59 VLF main circuit packs 1 Refer to the engineering job specification Identify the proper function group slots where LNW6 LNW7 or LNW8 circuit packs will be installed 2 Remove the LNW6 LNW7 or LNW8 from the packing material 3 Place the circuit pack into the shelf slot A1 B1 C1 or D1 as requ...

Страница 151: ...NW19B 48 DS3 EC1 supporting Terminal Loopbacks or LNW20 48TMUX circuit packs into the 1665 DMX shelf 1 Refer to the engineering job specification Identify the proper function group s where LNW16 LNW18 LNW19 LNW19B or LNW20 circuit packs will be installed 2 Remove the LNW16 LNW18 LNW19 LNW19B or LNW20 from the packing material 3 Place the circuit pack into the shelf slot A1 B1 C1 D1 or G1 as requir...

Страница 152: ...NW16 LNW18 LNW19 LNW19B or LNW20 circuit packs 8 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S LNW36 OC 3 OLIU low speed installation optional Follow this procedure only if installing LNW36 OC3 OLIU circuit packs into the 1665 DMX shelf Important LNW36 and LNW37 may be used as a protection pair LNW36 may be replaced with LNW37 and vice versa as long as the ...

Страница 153: ... packs 8 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S LNW37 4 OC 3 SFP OLIU LNW45 8 OC 3 SFP OLIU LNW49 4 OC 12 SFP OLIU LNW55 12OC 3 12OC12 4 OC48 SFP OLIU or LNW62 4 OC 48 SFP OLIU low speed installation optional Follow this procedure only if installing the LNW37 4 OC 3 SFP OLIU LNW45 8 OC 3 SFP OLIU LNW49 4 OC 12 SFP OLIU LNW55 12 OC 3 12 OC 12 4 OC 48 ...

Страница 154: ...tinue with Step 5 If not install a blank circuit pack into the companion circuit pack slot A2 B2 C2 D2 or G2 as required then proceed to Step 7 Important Blank circuit packs are required in all unused slots to provide proper air flow for cooling 5 Remove the second OLIU from the packing material 6 Place the circuit pack into the shelf slot A2 B2 C2 D2 or G2 as required Do NOT engage the circuit pa...

Страница 155: ... into the shelf slot A1 B1 C1 D1 or G1 as required Do NOT engage the circuit pack in the backplane connector 4 If a companion circuit pack is required continue with Step 5 If not install a blank circuit pack into the companion circuit pack slot A2 B2 C2 D2 or G2 as required then proceed to Step 7 Important Blank circuit packs are required in all unused slots to provide proper air flow for cooling ...

Страница 156: ... into the shelf slot A1 B1 C1 D1 or G1 as required Do NOT engage the circuit pack in the backplane connector 4 If a companion circuit pack is required continue with Step 5 If not install a blank circuit pack into the companion circuit pack slot A2 B2 C2 D2 or G2 as required then proceed to Step 7 Important Blank circuit packs are required in all unused slots to provide proper air flow for cooling ...

Страница 157: ...portant The LNW66 or LNW71 circuit pack can only be installed in slot 1 of any function group 2 Remove the LNW66 or LNW71 from the packing material 3 Place the circuit pack into the shelf slot A1 B1 C1 or D1 as required Do NOT engage the circuit pack in the backplane connector 4 Install a blank circuit pack into the companion circuit pack slot A2 B2 C2 or D2 as required Important Blank circuit pac...

Страница 158: ...roup slot A1 A2 B1 B2 C1 C2 D1 D2 G1 or G2 where the LNW70 LNW74 LNW63 LNW64 LNW78 or LNW170 circuit pack will be installed Important When LNW74 is installed in the G1 or G2 position only the faceplate optical 100 Base F ports are available for use The LNW70 LNW74 LNW63 LNW64 LNW78 and LNW170 circuit packs can only be installed in slot 1 of any function group unless the mains are equipped with LNW...

Страница 159: ...entify the proper function group slot A1 A2 B1 B2 C1 C2 D1 D2 and or growth slot G1 or G2 where the LNW67 circuit pack will be installed Important Unless equipped with LNW59 VLF mains the LNW67 circuit pack can only be installed in slot 1 of any function group or growth slot 1 2 Remove the LNW67 from the packing material 3 Place the circuit pack into the shelf fn slot as required Do NOT engage the...

Страница 160: ...stallation Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX 2 3 0 365 372 304R7 1 Issue 1 November 2007 6 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 161: ...helf fn slot as required Do NOT engage the circuit pack in the backplane connector 4 Install a blank circuit pack into the companion circuit pack slot as required Important Blank circuit packs are required in all unused slots to provide proper air flow for cooling 5 Repeat Step 1 through Step 4 for each additional function group and or growth slot to be equipped with or LNW68 circuit packs 6 Check...

Страница 162: ...ion group or growth slot 1 2 Remove the LNW73 or LNW73C from the packing material 3 Place the circuit pack into the shelf fn slot as required Do NOT engage the circuit pack in the backplane connector 4 Install a blank circuit pack into the companion circuit pack slot as required Important Blank circuit packs are required in all unused slots to provide proper air flow for cooling 5 Repeat Step 1 th...

Страница 163: ... an unequipped slot on the shelf 4 Continue with the next unequipped slot until all the unused slots are equipped with an 177D Apparatus Blank or LNW98 Detectable Blank 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S 177E LNW97 blank CP installation optional Follow this procedure to install 177E Apparatus Blank s or LNW97 Detectable Blank s into the 1665 DM...

Страница 164: ...ed with a dust plug installed into the ports to maintain cleanliness during storage and or transportation It is recommended that the dust plug be kept in place to maintain cleanliness With proper care and handling cleaning the pluggable modules should not be necessary 2 Check the ports for cleanliness and clean the pluggable module if necessary See Appendix B Fiber cleaning 3 Insert the pluggable ...

Страница 165: ...stallation Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX 365 372 304R7 1 Issue 1 November 2007 2 3 5 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 166: ... Initial circuit pack installation Powering and initial circuit pack installation for 1665 Data Multiplexer 1665 DMX 2 3 6 365 372 304R7 1 Issue 1 November 2007 ...

Страница 167: ...plexer 1665 DMX stand alone installation tests to verify correct interconnect cabling alarm cabling and as required external timing and communication cabling This section also covers circuit pack installation fully seated Contents This section is organized into the following chapters Software download and circuit pack installation Chapter 3 Installation tests Chapter 4 Operational tests Chapter 5 ...

Страница 168: ... 1665 Data Multiplexer 1665 DMX stand alone installation tests I I 2 365 372 304R7 1 Issue 1 November 2007 ...

Страница 169: ...ies Listed below are the required tools test equipment and accessories Software installation 3 4 Circuit pack installation 3 5 Use of WaveStar CIT software 3 9 Circuit pack firmware version verification 3 12 1665 DMX shelf initialization 3 13 Provision enable disable TCP IP on an IAO LAN port 3 14 Reset system date and time 3 17 Provision Enable disable the 1665 DMX as a TL1 TCP IP GNE 3 18 Quanti...

Страница 170: ...front of the SYSCTL circuit pack CAT5 Ethernet cable with either a 10 100 hub or a cross over cable for the LAN CIT or IAO LAN ports LBOs 20 dB for LNW60 15 dB 10 dB and 5 dB LBOs are required when looping back the main OLIUs on themselves Components Minimum Recommended Processor Pentium 266 MHz Pentium IV 1 GHz RAM 1 system view 128 MB 512 MB RAM up to 5 system views 256 MB 1 GB Virtual Memory 13...

Страница 171: ...multiple NE types the processor type and speed and the memory size will all factor into CIT performance Internet Browser Internet Explorer 5 0 5 5 6 0 7 0 Internet Explorer 5 0 5 5 6 0 7 0 _________________________________________________________ Available hard disk space required to install and store the CIT and Generic Software is approximately 250 MB it is 550 MB if all graphical packages are i...

Страница 172: ...Software installation Description Software installation is accomplished by performing the appropriate software download procedures in the Software Release Description SRD which is shipped with the software When the software installation is complete check off the appropriate box in Appendix E Installation checklist ...

Страница 173: ... to prevent being inserted into the wrong shelf position Installing circuit packs requires some force When a circuit pack is installed its FAULT LED will light for several seconds to possibly several minutes then extinguish A properly grounded ESD wrist strap MUST be worn when handling circuit packs Important The UPD INIT pushbutton on the SYSCTL circuit pack is recessed and will require a pointed...

Страница 174: ...ck with no optics If equipped continue with Step 6 2 For circuit packs in the main slots determine if PTMs are required If the installation calls for optical interfaces to the mains locate and install the PTMs 3 Insert the proper LBO into the IN connectors of each MAIN OLIU Refer to Appendix A Laser safety and classifications and Electrostatic Discharge ESD considerations for maximum and minimum t...

Страница 175: ...attached in the back of the shelf The ACTIVE and FAULT LEDs should light when circuit packs are inserted and the FAULT LED should extinguish after a short period of time Some circuit packs such as LNW67 LNW68 may take several minutes before their FAULT LEDs extinguish 7 Continue seating the circuit packs with slot A2 and then on to B1 B2 G1 G2 C1 C2 D1 and D2 8 Fully seat Blank packs in any other ...

Страница 176: ...LEDs on or flashing on any of the inserted circuit packs press the UPD INIT pushbutton on the SYSCTL circuit pack Result The operation of the UPD INIT pushbutton on the SYSCTL circuit pack will update the system and should clear all standing alarms 11 If FAULT LEDs remain lit on any of the inserted circuit packs replace the respective circuit pack 12 Any other alarms will be cleared later on in th...

Страница 177: ...nstallation p 3 4 Login procedure 1 Connect the PC Serial cable to the RS232 Serial jack on the front of the SYSCTL circuit pack Or connect a PC LAN cable cross over to the LAN OSI connector on the front of the SYSCTL circuit pack 2 Start the WaveStar CIT software on the PC by double clicking on the WaveStar icon that was created by the installation procedure 3 Enter the following in the Login win...

Страница 178: ...Type click on the drop down menu arrow and choose Serial or OSI depending on the type of connection you are using Important An IP address must be assigned to the NIC card on the PC or laptop Otherwise you may experience login problems To assign an IP address start the DOS prompt on the computer and type the command ipconfig all The command will show an IP address line If there is no address line o...

Страница 179: ...ember 2007 3 1 1 9 Click on the Graphical button The following screen appears 10 Enter the Login for the shelf User Id LUC01 Password DMX2 5G10G case sensitive 11 Click OK Result The 1665 DMX system view is displayed 12 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 180: ...t packs have been installed in the shelf as described in the preceding sections Circuit pack firmware version verification procedure 1 Log on to the 1665 DMX shelf using the CIT 2 Select View Equipment 3 For each circuit pack listed in the View Equipment window highlight the CP and click Select 4 Compare the Program Version to the information provided in the Software Release Description SRD 5 If t...

Страница 181: ...on assume that the SYSCTL is installed and software has been successfully downloaded and the circuit packs have all been installed in the shelf as described in the preceding sections Shelf initialization procedure 1 Log on to the 1665 DMX shelf using the CIT software as described in the Use of WaveStar CIT software p 3 9 2 Select Fault Reset Initialize System 3 Click OK and then Yes to the Warning...

Страница 182: ... the IP Default Router Address if you are connecting to a router Be able to log in to a 1665 DMX with the WaveStar CIT and be familiar with the functions of the WaveStar CIT Procedure Proceed as follows 1 Use the WaveStar CIT to log in to the 1665 DMX shelf being provisioned using a Graphical connection 2 Determine which IAO LAN Port s you want to use front or rear Important If you are using the r...

Страница 183: ...menu and identify the duplication then assign correct addresses as necessary Important If you select Enable and click OK to apply any changes then execute the command when requested the system may reset and you will be logged off the system Selecting Disable allows you to stay logged on to the system to perform more provisioning You can then come back to this window and enable the TCP IP function ...

Страница 184: ...le disable TCP IP on an IAO LAN port Software download and circuit pack installation 3 1 6 365 372 304R7 1 Issue 1 November 2007 9 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 185: ... select Administration Set Date and Time to bring up the Set Systems Date and Time screen for 1665 DMX 3 From the Date panel select the Year and Month from the pull down menus Result A calendar is displayed for the month and year selected 4 Click on the Date from the calendar 5 From the Time panel select the Hour Minute and Second from the pull down menus based upon a 12 hour clock 6 Select am or ...

Страница 186: ...recautions prior to performing this task Use a static ground wrist strap whenever handling circuit packs or working on a system to prevent electrostatic discharge damage to sensitive components Before you begin Prior to performing this task you must Obtain the work instructions for this task Complete the Circuit pack firmware version verification procedure to provision and enable TCP IP for the se...

Страница 187: ...red LAN port s 5 In the Data Communications window click on the TCP IP Gateway tab at the top of the window Result The TCP IP Gateway parameters display 6 From your work instructions determine which IP calling addresses will be allowed to access the 1665 DMX TL1 TCP IP GNE 7 Use the instructions on the screen to add modify or delete a gateway host from the TCP IP Gateway Host List The following pa...

Страница 188: ... the TCP IP Gateway or select Disable to disable the TCP IP Gateway 9 Click Apply at the bottom of the window Result A warning window opens and asks if you want to execute this command 10 Click Yes to execute the command then click Close to exit the window if desired 11 Repeat this procedure for each TL1 TCP IP GNE to be modified enabled or disabled 12 Check off the appropriate box in Appendix E I...

Страница 189: ...ltiplexer User Operations Guide Contents This chapter provides information on the following topics LBO software settings 4 4 Clearing alarms 4 7 Local equipment and cross connect tests 4 9 DS1 protection switching 4 14 DS1 cleanup procedures 4 18 DS3 EC1 and TMUX testing procedure 4 22 DS3 protection switching 4 28 DS3 cleanup procedures 4 32 LNW66 LNW71 and LNW74 10 100T TX Ethernet cabling testi...

Страница 190: ...e the electrostatic discharge ESD jack provided on the shelf 1 DS1 Error Rate Test Set A DS1 error rate test set is required for testing of DS1 cabling A T BERD 2209 or equivalent is recommended 1 DS3 Error Rate Test Set A DS3 error rate test set is required for testing of DS3 EC1 and TMUX cabling A T BERD 2209 or equivalent is recommended 1 SONET Optical Test Set An OC 3 OC 12 or OC 48 test set a...

Страница 191: ...oping the 1665 DMX shelf equipped with LNW60 1 Personal Computer PC Required to run the WaveStar CIT software See Chapter 3 Software download and circuit pack installation PC minimum requirements p 3 2 1 CIT Interface Cable 8 ft long RJ45 to 9 pin D sub serial cable Comcode 848748869 Required to connect the PC to the CIT jack on the front of the SYSCTL circuit pack 2 LAN 10BaseT Straight through C...

Страница 192: ...S1 DS3 EC1 and TMUX circuit packs 1 Log on to the 1665 DMX shelf using the CIT software as described in the Chapter 3 Use of WaveStar CIT software p 3 9 2 Refer to the following table of cable lengths and LBO values Determine the LBO value corresponding to the DS1 cables installed 3 From the CIT GUI select Configuration Equipment 4 Select the desired DS1 port by clicking the sign next to the CP an...

Страница 193: ... provisioned for DS3 Set DS3 LBO values as follows 1 Refer to the following table of cable lengths and LBO values Determine the LBO value corresponding to the DS3 TMUX cables installed Table 4 1 Cable lengths feet 2 From the CIT GUI select Configuration Equipment 3 Select the desired DS3 port by clicking the sign next to the CP 4 Highlight the port and click Select 5 Next to Line Build Out choose ...

Страница 194: ... LBO software settings Installation tests 4 6 365 372 304R7 1 Issue 1 November 2007 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 195: ...prevent DCC alarms from being generated due to the optical loopback on the main OLIUs 1 Select Configuration Timing Sync Result From the Timing Mode pull down choose Free Running 2 Click OK 3 Select Configuration DCC Terminations 4 From the Port AID pull down select dcc m1 1 5 Next to OSI Over DCC click disabled 6 Click Apply 7 From the Port AID pull down select dcc m2 1 8 Next to OSI Over DCC cli...

Страница 196: ...circuit pack require either a 75 ohm termination or a loopback at the DSX 3 on all ports If loopbacks are used make sure to take down any cross connections 12 If there are still FAULT LEDs on replace the respective circuit pack 13 Disconnect the office alarm cable until all procedures and testing have been completed 14 Check off the appropriate box in Appendix E Installation checklist E N D O F S ...

Страница 197: ...s installed and synchronization set to free running On initial installation turn up of 1665 DMX there are no default cross connects All cross connects need to be entered for these tests Upon completion of this test all cross connections will be deleted Important If the shelf is not fully equipped move circuit packs to unequipped function slots and repeat the test Test all circuit pack positions wh...

Страница 198: ...helves If the 1665 DMX shelf is not fully populated it may be necessary to move the circuit pack s from slot to slot in order to test all DS1 cabling Procedure This command creates a cross connect to map the first DS1 of a DS1 circuit pack in a Function Unit to the first VT1 5 within the first VT Group of STS1 of the Main OLIUs 1 Log on to the 1665 DMX shelf using the CIT software as described in ...

Страница 199: ...lots that are cabled to a DSX 1 and not to any terminating equipment A Function Unit slot cabled to the DSX 1 must contain a 28DS1 LNW6 or LNW7 circuit pack or a 56DS1 E1 LNW8 circuit pack in order to perform these tests If the 1665 DMX shelf is not fully populated it may be necessary to move the circuit pack s from slot to slot in order to test all DS1 cabling This procedure requires the use of a...

Страница 200: ...n error free signal is not received Verify that the DS1 line coding format is set to B8ZS using the View Equipment command Verify that the LBOs are set according to cable length using the View Equipment command see Setting DS1 LBOs p 4 4 Check DS1 cabling for proper connections 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S DS1 non terminating equipment tr...

Страница 201: ...he DS1 terminating equipment which will verify that the cabling is correct Important A test set can be applied at the DSX 1 to test cabling toward the facility loopback 5 Once the test is complete remove the loopback Select Fault Analysis Loopback 6 Choose the DS1 port to test and click Select 7 Select Release and Loopback Type Facility and click Apply 8 Repeat Step 1 through Step 7 for each DS1 c...

Страница 202: ...ocate the Function Group equipped with the DS1 circuit pack 2 Determine the system is alarm free by clicking on the Alarm List button on the system view 3 Unseat the active circuit pack The active circuit pack has an ACTIVE LED lit Monitor the test set connected to the DSX patch panel Result The ACTIVE LED on the other circuit pack in the Function Group will light The MN alarm and the NE LED lamps...

Страница 203: ...on the second circuit pack will light for several seconds then extinguish On the SYSCTL the MN alarm extinguishes 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S DS1 function unit protection switching test command This test will initiate switching commands from the CIT and verify proper switching and LED indications Important It is not necessary to perform ...

Страница 204: ...s as the previous step 7 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S DS1 path switching test manual Important It is not mandatory to perform this test on each vt cross connection however this procedure should be performed on each Function Unit Slot pair 1 Select Fault Protection Switch 2 Under Path Protection click on Path m 1 1 1 1 3 Click Select 4 At th...

Страница 205: ...Installation tests 365 372 304R7 1 Issue 1 November 2007 4 1 7 8 Repeat Step 1 through Step 7 to verify a switch back to the original ring 9 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 206: ... Update All Result This command will remove alarms generated by removing the test signals from the DSX 1 5 Repeat the DS1 terminating equipment loopback testing p 4 10 or the DS1 non terminating equipment transmission testing optical main OLIU p 4 11 procedure and the Delete any existing DS1 cross connections p 4 18 procedure to test each of the remaining DS1 tributaries of the Function Unit This ...

Страница 207: ... a 1 3 4 13 m 1 1 4 1 a 1 4 1 14 m 1 1 4 2 a 1 4 2 15 m 1 1 4 3 a 1 4 3 16 m 1 1 4 4 a 1 4 4 17 m 1 1 5 1 a 1 5 1 18 m 1 1 5 2 a 1 5 2 19 m 1 1 5 3 a 1 5 3 20 m 1 1 5 4 a 1 5 4 21 m 1 1 6 1 a 1 6 1 22 m 1 1 6 2 a 1 6 2 23 m 1 1 6 3 a 1 6 3 24 m 1 1 6 4 a 1 6 4 25 m 1 1 7 1 a 1 7 1 26 m 1 1 7 2 a 1 7 2 27 m 1 1 7 3 a 1 7 3 28 m 1 1 7 4 a 1 7 4 29 m 1 2 1 1 a 2 1 1 30 m 1 2 1 2 a 2 1 2 31 m 1 2 1 3 ...

Страница 208: ...1 2 2 3 a 2 2 3 36 m 1 2 2 4 a 2 2 4 37 m 1 2 3 1 a 2 3 1 38 m 1 2 3 2 a 2 3 2 39 m 1 2 3 3 a 2 3 3 40 m 1 2 3 4 a 2 3 4 41 m 1 2 4 1 a 2 4 1 42 m 1 2 4 2 a 2 4 2 43 m 1 2 4 3 a 2 4 3 44 m 1 2 4 4 a 2 4 4 45 m 1 2 5 1 a 2 5 1 46 m 1 2 5 2 a 2 5 2 47 m 1 2 5 3 a 2 5 3 48 m 1 2 5 4 a 2 5 4 49 m 1 2 6 1 a 2 6 1 50 m 1 2 6 2 a 2 6 2 51 m 1 2 6 3 a 2 6 3 52 m 1 2 6 4 a 2 6 4 53 m 1 2 7 1 a 2 7 1 54 m 1...

Страница 209: ...cross connects removed 1 Select View Cross Connections 2 Choose shelf 1665 DMX and click Select 3 Verify that there are no cross connections on the shelf 4 Select Configuration Update System Update All Result This command will remove alarms generated by removing the test signals from the DSX 1 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 210: ...to move the circuit pack s from slot to slot in order to test all DS3 EC1 and TMUX cabling This procedure requires the use of a DS3 test set Important The LNW16 and LNW19 LNW19B circuit packs are provisioned on a per port basis for DS3 or EC1 The default setting for all ports is DS3 Tests in the section will verify proper cabling by using a DS3 test set with all ports provisioned as DS3 TMUX is on...

Страница 211: ...ical cabling to the 1665 DMX NE Follow the procedure below to perform a facility loopback test at the 1665 DMX shelf When the 1665 DMX is cabled to other DS3 terminating equipment in order to complete the loopback testing it will be necessary to contact the Customer Network Control Center and have a signal established at the port s under test 1 Log on to the 1665 DMX shelf using the CIT software a...

Страница 212: ... not received Check the LBOs settings using View Equipment see Setting DS3 EC1 and TMUX LBOs p 4 5 Verify that the pack is provisioned for the framing format being sent from the test set CBIT or M13 Verify that the port is provisioned for DS3 See Verify provisioning p 4 22 Check the DS3 EC1 cabling for proper connections 9 Once the test is complete remove the loopback Select Fault Analysis Loopbac...

Страница 213: ...elect Operate and Loopback Type Facility and click Apply 4 Once the loopback is up a test signal shall be generated at the DS3 terminating equipment which will verify that the cabling is correct Important A test set can be applied at the DSX 3 to test cabling toward the facility loopback 5 While observing the error free transmission grasp the DS3 cable about two inches from the BNC connector head ...

Страница 214: ...dure for all Function Groups equipped with LNW16 12DS3 EC1 LNW19 LNW19B 48DS3 EC1 LNW18 TMUX or LNW20 48TMUX circuit packs that are terminated at a DSX3 patch panel 1 Select Configuration Cross Connections 2 Use the Cross Connection Wizard to enter a new cross connection at the STS1 rate UPSR Ring Add Drop between m 1 1 and fn 1 fn will be a b c or d depending on the slot where the DS3 or TMUX CP ...

Страница 215: ...al to the port 6 While observing the error free transmission at the DSX grasp the DS3 cable about two inches from the BNC connector head and gently rotate twist the cable in a clockwise and counter clockwise direction about 45 degrees gently Result If any errors are detected while performing this wiggle test the BNC connector must be cut off and replaced If an error free signal is not received Che...

Страница 216: ...ped with the DS3 TMUX circuit pack 2 Unseat the active circuit pack The active circuit pack has an ACTIVE LED lit Result The ACTIVE LED on the other circuit pack in the Function Group will light The MN alarm and the NE LED lamps on the SYSCTL will light Transmission at the test set will take a momentary hit and then re establish 3 Unseat the second circuit pack of the pair Result On the SYSCTL the...

Страница 217: ... will initiate switching commands from the CIT and verify proper switching and LED indications while monitoring transmission at a test set Important It is not necessary to perform this test on each sts cross connection however this procedure should be performed on each Function Unit Slot pair 1 Select Fault Protection Switch 2 Click on 1 1 Equip fn x x is a b c or d corresponding to the function g...

Страница 218: ... a test set is connected path switching will be verified Important It is not mandatory to perform this test on each sts cross connection however this procedure should be performed on each Function Unit Slot pair 1 Select Fault Protection Switch 2 Under Path Protection click on Path m 1 1 3 Click Select 4 At the Switch Type pull down select Manual 5 Click Apply Result The Active Path indicates a ch...

Страница 219: ...e 1 November 2007 4 3 1 8 Repeat Step 1 through Step 7 to verify a switch back to the original ring 9 Repeat Step 1 through Step 7 to verify a switch back to the original ring 10 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 220: ...and will remove alarms generated by removing the test signals from the DSX 3 5 Repeat the DS3 terminating equipment loopback testing optical main OLIUs p 4 23 or the DS3 non terminating transmission optical main OLIU p 4 26 procedure and the Delete the existing DS3 cross connections p 4 32 procedure to test each of the remaining DS3 tributaries of the Function Unit substituting the following addre...

Страница 221: ... 3 4 m 1 4 a 4 5 m 1 5 a 5 6 m 1 6 a 6 7 m 1 7 a 7 8 m 1 8 a 8 9 m 1 9 a 9 10 m 1 10 a 10 11 m 1 11 a 11 12 m 1 12 a 12 13 m 1 13 a 13 14 m 1 14 a 14 15 m 1 15 a 15 16 m 1 16 a 16 17 m 1 17 a 17 18 m 1 18 a 18 19 m 1 19 a 19 20 m 1 20 a 20 21 m 1 21 a 21 22 m 1 22 a 22 23 m 1 23 a 23 24 m 1 24 a 24 25 m 1 25 a 25 26 m 1 26 a 26 27 m 1 27 a 27 28 m 1 28 a 28 29 m 1 29 a 29 ...

Страница 222: ... 7 Verify there are no existing DS3 cross connections Use the View Cross Connections command 8 Select Configuration Update System Update All 30 m 1 30 a 30 31 m 1 31 a 31 32 m 1 32 a 32 33 m 1 33 a 33 34 m 1 34 a 34 35 m 1 35 a 35 36 m 1 36 a 36 37 m 1 37 a 37 38 m 1 38 a 38 39 m 1 39 a 39 40 m 1 40 a 40 41 m 1 41 a 41 42 m 1 42 a 42 43 m 1 43 a 43 44 m 1 44 a 44 45 m 1 45 a 45 46 m 1 46 a 46 47 m...

Страница 223: ...on tests 365 372 304R7 1 Issue 1 November 2007 4 3 5 Result This command will remove alarms generated by removing the test signals from the DSX 3 9 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 224: ...in an LNW66 LNW71 or LNW74 10 100T circuit packs with cabling for testing 3 Identify the RJ45 patch panel associated with the function groups identified above 4 Connect the RJ45 cable from the first RJ45 on the patch panel to the Ethernet port on your PC 5 Watch for the link LED to light on the PC s Ethernet card or wait for 30 seconds and then disconnect the RJ45 cable from the patch panel 6 The ...

Страница 225: ...tion testing Important Continue with the following section only for LNW66 circuit packs Testing is complete for LNW71 and LNW74 packs 1 If not still connected serially from the last procedure then connect the Front CIT cable between the PC and the CIT RS 232 jack of System Controller and login to the shelf using the serial connection 2 Select Configuration Data Create Virtual Switch 3 Choose the L...

Страница 226: ...L to the first position on the RJ45 Ethernet patch panel 17 Connect a second RJ45 Ethernet cable from the PC Ethernet port to the second position on the RJ45 Ethernet patch panel 18 Watch for the link LED to light on the PC s Ethernet card or wait for 30 seconds 19 Login to the shelf using the OSI connection Result Successful login to the 1665 DMX 20 Log out of the 1665 DMX shelf 21 At the RJ45 Et...

Страница 227: ...remaining Ethernet connections on the RJ45 patch panel connected to the LNW66 under test then continue on to Step 27 27 Disconnect the PC from the RJ45 patch panel and the 1665 DMX LAN port from the RJ45 patch panel 28 Connect the Front CIT cable between the PC and the CIT RS 232 jack of System Controller and login to the shelf using the serial connection 29 Select Configuration Update System Upda...

Страница 228: ...ts 4 4 0 365 372 304R7 1 Issue 1 November 2007 33 Log out and disconnect the PC from the 1665 DMX serial port 34 Repeat this procedure for every slot containing and LNW66 LNW71 and LNW74 35 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 229: ... of the first SFP equipped Refer to Appendix C Installing fiber connectors and LBOs Connect the fibers labeled IN and OUT from the LGX to the OLIU Port 1 3 Connect the Port 1 IN connector to the Port 1 OUT connector at the LGX of the OC 3 OC 12 or OC 48 OLIU using an optical fiber jumper cable Refer to Appendix B Fiber cleaning for proper fiber cleaning instructions Requirement The FAULT LED on th...

Страница 230: ... port being tested 6 Select Configuration Update System Update All Requirement The flashing FAULT LED should extinguish on the OLIU There should be no alarm indications on the 1665 DMX shelf 7 From the system view click Alarm List to verify that the circuit pack alarm is cleared 8 Repeat this entire procedure for each LNW37 LNW45 LNW49 LNW55 or LNW62 SFP equipped in the 1665 DMX shelf 9 Replace al...

Страница 231: ...nnector Port 1 of the OC 3 OLIU Refer to Appendix C Installing fiber connectors and LBOs Connect the fibers labeled IN and OUT from the LGX to the OLIU Port 1 3 Connect the Port 1 IN connector to the Port 1 OUT connector at the LGX of the OC 3 OLIU using an optical fiber jumper cable Refer to Appendix A Laser safety and classifications and Electrostatic Discharge ESD considerations for proper fibe...

Страница 232: ...lace it on the IN connector directly below it Port 2 Connect the fibers labeled IN and OUT from the LGX to the OLIU Port 2 8 Connect the Port 2 IN connector to the Port 2 OUT connector at the LGX of the OC 3 OLIU using an optical fiber jumper cable Requirement The FAULT LED on the OC 3 OLIU will begin flashing and the MN and NE LEDs should be lit on the SYSCTL circuit pack After approximately 20 s...

Страница 233: ...lit on the SYSCTL circuit pack After approximately 20 seconds the flashing FAULT LED should extinguish on the OC 3 OLIU and the FAULT MJ and NE LEDs should be lit on the SYSCTL circuit pack 14 Remove the optical fiber jumper from the OC 3 OLIU at the LGX Result The FAULT LED should begin flashing on the OC 3 OLIU and only the MN and NE LEDs should be lit on the SYSCTL circuit pack 15 From the syst...

Страница 234: ...sult The FAULT LED should begin flashing on the OC 3 OLIU and only the MN and NE LEDs should be lit on the SYSCTL circuit pack 20 From the system view click Alarm List to verify that the circuit pack alarm is associated with the optical port being tested 21 Select Configuration Update System Update All Requirement The flashing FAULT LED should extinguish on the OC 3 OLIU There should be no alarm i...

Страница 235: ... dB LC type LBO into the top IN connector Port 1 of the OC 12 OLIU Refer to Appendix C Installing fiber connectors and LBOs Connect the fibers labeled IN and OUT from the LGX to the OLIU Port 1 3 Connect the Port 1 IN connector to the Port 1 OUT connector at the LGX of the OC 12 OLIU using an optical fiber jumper cable Refer to Appendix B Fiber cleaning for proper fiber cleaning instructions Requi...

Страница 236: ...on the IN connector directly below it Port 2 Connect the fibers labeled IN and OUT from the LGX to the OLIU Port 2 8 Connect the Port 2 IN connector to the Port 2 OUT connector at the LGX of the OC 12 OLIU using an optical fiber jumper cable Requirement The FAULT LED on the OC 12 OLIU will begin flashing and the MN and NE LEDs should be lit on the SYSCTL circuit pack After approximately 20 seconds...

Страница 237: ...D O F S T E P S OC 12 facility loopback testing Facility Loopback testing allows the installer to verify cabling to the OC 12 equipment This test is only required if the 1665 DMX shelf is connected to OC 12 equipment If the shelf is NOT connected to OC 12 equipment skip this section and continue to the section on OC 48 low speed testing procedure p 4 52 Important An optical test set with the capab...

Страница 238: ...l 5 Select Configuration Cross Connections 6 Use the Cross Connection Wizard to Delete leg s of an existing cross connection associated with CP main 1 Port 1 the OC 12 cross connection 7 Verify loss of transmission at the patch panel This should be evident by a SONET alarm and a loss of pattern alarm 8 Select Fault Analysis Loopback 9 Choose the correct port on the OC 12 CP and click Select 10 Cli...

Страница 239: ...n the OC 12 CP and click Select 15 Click on Release 16 Click Apply 17 Verify loss of transmission at the patch panel This should be evident by a SONET alarm and a loss of pattern alarm 18 Repeat this section for all OC 12 ports 19 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 240: ...lit on the OC 48 OLIU 2 Insert a 15 dB LC type LBO into the IN connector of the OC 48 OLIU Refer to Appendix C Installing fiber connectors and LBOs Connect the fibers labeled IN and OUT from the LGX to the OLIU Port 1 3 Connect the IN connector to the OUT connector at the LGX of the OC 48 OLIU using an optical fiber jumper cable Refer to Appendix B Fiber cleaning for proper fiber cleaning instruct...

Страница 241: ...eplace all protective dust covers on the OC 48 OLIU connectors that were removed to perform this procedure 9 Repeat this entire procedure for each OC 48 OLIU in the 1665 DMX shelf 10 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S OC 48 facility loopback testing Facility Loopback testing allows the installer to verify cabling to the OC 48 equipment This test ...

Страница 242: ...a cross connect to map the first STS 48 of an OC 48 circuit pack to the first STS 48 of the Main OLIUs 4 Verify transmission at the patch panel There should be no alarms at the test set 5 Select Configuration Cross Connections 6 Use the Cross Connection Wizard to Delete leg s of an existing cross connection associated with CP main 1 Port 1 the OC 48 cross connection 7 Verify loss of transmission a...

Страница 243: ...Select Fault Analysis Loopback 14 Choose the correct port on the OC 48 CP and click Select 15 Click on Release 16 Click Apply 17 Verify loss of transmission at the patch panel This should be evident by a SONET alarm and a loss of pattern alarm 18 Repeat this section for all OC 48 ports 19 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 244: ...lf and replace the faulty unit Important If the shelf is not fully equipped move circuit packs around and repeat the test for all valid circuit pack positions LED test procedure 1 Select Fault Test LED 2 Choose shelf 1665 DMX 3 Click Select 4 Choose Number of Iterations 1 5 Click OK Result All LEDs on the shelf should light for 10 seconds then extinguish for 10 seconds and then the proper LEDs wil...

Страница 245: ... the dcc disabled to prevent dcc alarms The dcc can be verified with the View DCC GUI command If the high speed packs are no longer looped back do so at the LGX panel The dcc should also be disabled at the function unit slot under test since it will be connected to a test set and will register alarms The dcc can be provisioned with the Provision DCC Terminations GUI command Change the dcc on M2 an...

Страница 246: ...lace the pack with a spare and return the suspect pack back through the RMA process If levels meet specifications check the fiber to the LGX panel for continuity 3 Ensure that the optical packs to be tested have 15 dB attenuators inserted to the IN port of the port under test Failing to insert attenuators may overdrive the circuitry and cause permanent damage to the circuit packs Start testing in ...

Страница 247: ... This is due to the fact that we have not established a cross connection Enter a cross connection either through the GUI using the cross connect wizard Enter the command according to the optical pack and function slot under test TX RX 1x2 splitter RX RX TX OC3 OC12 OC48 Optical Test Set TX Standby FN 2 Active FN 1 OC 3 LNW36 LNW37 LNW45 LNW55 OC 12 LNW46 LNW49 LNW55 OC 48 LNW31 LNW55 LNW62 LNW425 ...

Страница 248: ...ve and slot 1 is standby reseat the pack in slot 2 switching the active path to slot 1 9 At the LS LGX Bay move the Test Set RX cable to the Standby TX Port refer to Figure 4 2 Examine the test traffic received by the test set Look for errors or any other signal information that the test set is capable of indicating The Standby OCN card should be running without errors Figure 4 2 Optical test arra...

Страница 249: ...ransmission hit indicating the switch but should clear and show good transmission 11 Return the Test Set TX Cable to normal operation and ensure that the LOS alarm clears 12 Delete any cross connects through the GUI Cross Connection Wizard 13 Select Configuration Update System Update All 14 Repeat this test on all OCN ports for all optical packs which will reside in the shelf 15 Check off the appr...

Страница 250: ... Additional optical tests optional Installation tests 4 6 2 365 372 304R7 1 Issue 1 November 2007 ...

Страница 251: ...lems are encountered refer to 365 373 302 1665 Data Multiplexer Alarm Messages and Trouble Clearing Guide for detailed troubleshooting procedures Contents This chapter provides information on the following topics Office alarm test 5 4 Automatic protection switching and alarm test 5 8 Manual switching tests 5 11 External timing verification 5 13 Miscellaneous environmental discrete telemetry test 5...

Страница 252: ...lied 1 DS1 Error Rate Test Set A DS1 error rate test set is required for testing of DS1 cabling A T BERD 211 or equivalent is recommended 1 DS3 Error Rate Test Set A DS3 error rate test set is required for testing of DS3 cabling A T BERD 305 or equivalent is recommended 1 SONET Optical Test Set An ONC3 OC 12 or OC 48 test set is required for testing of optical circuit packs An Agilent OmniBER 718 ...

Страница 253: ...rd CAUTION Laser Safety When connecting fiber loops between the IN and OUT ports on optical circuit packs always connect to the IN port first and then the OUT port This will prevent any optical radiation from being present at the fiber end CAUTION The operational tests in this section are run only in an out of service mode of operation Office alarms will normally be connected only during the offic...

Страница 254: ...l be temporarily connected during this procedure Table 5 1 Office Alarm Connections p 5 5 lists the office alarms connections It is a requirement that alarms on the 1665 DMX do not affect and are not affected by other equipment via office alarm connections During this test the alarm state of other equipment connected to the same office alarms as the 1665 DMX should be examined after creating or cl...

Страница 255: ...wnload and circuit pack installation 4 Select Configuration Cross Connections 5 Use the Cross Connection Wizard to enter a new cross connection at the STS 1 rate UPSR Ring Add Drop between m1 1 1 and fn1 1 fn will be a b c or d depending on the slot where the DS1 DS3 or TMUX CP is located Conn Pin Color Designation Name J12 J13 1 2 3 4 BL W W BL O W W O RYMJV1 RYMJV2 RYMJA1 RYMJA2 Minor Alarm Visi...

Страница 256: ...nt Activated office alarms MN visual MN audible Important Alarms will not be activated until the alarm delay time has passed The default time is 2 seconds 10 Press the ACO pushbutton on the SYSCTL Requirement Activated office alarm MN visual The MN audible alarm clears 11 Using a small flat bladed screwdriver set one of the circuit breakers to OFF Requirement Activated office alarms MN visual MN a...

Страница 257: ...was turned off in Step 11 Result After a few minutes all alarm indications should clear 17 Disconnect the office alarm cable connected in Step 1 for the remainder of the test procedures in this chapter 18 Select Configuration Alarms Alarm Configuration 19 Choose Power Alarm Level Minor 20 Click OK Important Do NOT delete the cross connect that was entered for this test 21 Check off the appropriate...

Страница 258: ...k on itself that is with the IN of the OLIU M1 looped to the OUT of the OLIU M1 and the IN of the OLIU M2 looped to the OUT of the OLIU M2 Prior to performing each test the shelf under test must be clear of all alarms that is only green LEDs are lit A properly grounded ESD wrist strap MUST be worn when handling circuit packs Unterminated optical connectors may emit laser radiation Do not view beam...

Страница 259: ...installation 2 Select View Cross Connections 3 Choose shelf 1665 DMX and click Select 4 Verify that the cross connection entered in the previous section is on the list If there is no cross connect remaining from the previous section then a cross connection must be established before continuing 5 Select Configuration Cross Connections 6 Use the Cross Connection Wizard to enter a new cross connectio...

Страница 260: ... active receiver Result The MN and then NE alarm LED should light on the SYSCTL and the FAULT LED should flash on the OLIU 12 Click Refresh in the View Protection window Result The Active path has changed If m1 1 1 was active before m2 1 1 is active now 13 Reconnect the fiber at the OLIU Result After a short time the MN and NE alarm LEDs on the SYSCTL and the FAULT LED on the OLIU should extinguis...

Страница 261: ...1 cross connect should still exist from the previous tests 1 Select Fault Protection Switch 2 Under Path Protection choose Path m 1 1 3 Click Select 4 Note the Active Path 5 In the Switch Type pull down choose Manual 6 Click Apply Requirement The ring that was active in Step 4 is no longer active and the other ring is now active 7 In the Switch Type pull down choose Clear 8 Click Apply 9 Repeat St...

Страница 262: ... Manual switching tests Operational tests 5 1 2 365 372 304R7 1 Issue 1 November 2007 10 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 263: ... the frame format SF or ESF and line code AMI or B8ZS of the DS1 timing signals being generated by the timing source 2 Select Configuration Timing Sync 3 In the Timing Mode pull down verify External Timing is displayed If not choose External and click OK and select Configuration Timing Sync 4 Click on the Timing Input Ports tab at the top of the window 5 Enter the DS1 Input and Output Format SF or...

Страница 264: ... Shelf Backplane p 5 14 disconnect the input timing cable from the connector associated with the active reference Requirement The MN LED lights on the SYSCTL and the FAULT LED flashes on the MAIN OLIU circuit pack associated with that reference SYNC1 is associated with M1 and SYNC2 is associated with M2 Figure 5 1 1665 DMX Shelf Backplane MISCELLANEOUS DISCRETE CONNECTOR J11 TIMING CONNECTORS SYNC...

Страница 265: ...he same for the 1665 DMX High Capacity shelf 10 Click Refresh in the View Timing Sync window Result The other reference is now the active reference 11 Reconnect the timing cable at the rear of the shelf Requirement The MN LED extinguishes on the SYSCTL and the FAULT LED on the OLIU stops flashing 12 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 266: ...he miscellaneous discrete cable is connected to the J11 MISC connector on the shelf See Figure 5 1 1665 DMX Shelf Backplane p 5 14 3 Refer to Table 5 2 Miscellaneous Environmental Discrete Telemetry Connections p 5 18 to determine the wire color of the cable lead associated with the environmental input to be tested 4 At the far end of the cable short the associated environmental input lead to the ...

Страница 267: ...ndix E Installation checklist E N D O F S T E P S Figure 5 2 Miscellaneous Environmental Discrete Functions Env Alarm Status Env Input 19 Env Input 2 Env Input 1 2 1 20 Water Fire etc High Temp High Inputs Open Door Remote Terminal Input Common 19 Env Output 3 Env Output 2 Env Output 1 Pump etc Generator 25 24 23 22 21 Env Output 4 J11 Output Common To ...

Страница 268: ...BR TLMI5 TLMI6 TLMI7 TLMI8 Env Input 5 Env Input 6 Env Input 7 Env Input 8 9 10 11 12 S W W S BL R R BL TLMI9 TLMI10 TLMI11 TLMI12 Env Input 9 Env Input 10 Env Input 11 Env Input 12 13 14 15 16 O R R O G R R G TLMI13 TLMI14 TLMI15 TLMI16 Env Input 13 Env Input 14 Env Input 15 Env Input 16 17 18 19 20 BR R R BR S R R S TLMI17 TLMI18 TLMI19 TLMIC48VT RN Env Input 17 Env Input 18 Env Input 19 Input C...

Страница 269: ...baud Full duplex 8 data bits No parity bits 1 start bit 1 stop bit No flow control Transparent data mode ON Direct operating mode ON Important Modems supporting a large set of options and error detection capabilities may require other options be set before using the modems to download generic software Refer to manufacture s manuals for instructions on setting modem parameters 2 Verify that the mod...

Страница 270: ...ers 9 After a connection is established press the enter key Result SYSTEM TID LT DMX 10 Enter the command act user LT DMX LUC01 ctag DMX2 5G10G Result A message indicating that the command completed will be displayed along with the Alcatel Lucent disclosure 11 Enter the command canc user LT DMX LUC01 ctag Result A message indicating that the command completed will be displayed 12 Disconnect the Hy...

Страница 271: ...n 3 Click Next and continue with the Cross Connection Wizard to delete the cross connections associated with CP main 1 Port 1 4 To verify that all cross connections are deleted select View Cross Connections 5 Choose shelf 1665 DMX and click select 6 Verify that no alarm LEDs are lit and no FAULT LED is lit on any circuit pack If any alarm is present refer to 365 373 302 1665 Data Multiplexer Alarm...

Страница 272: ... Final operations Operational tests 5 2 2 365 372 304R7 1 Issue 1 November 2007 ...

Страница 273: ...tion starts the process of integrating the 1665 Data Multiplexer 1665 DMX into the customer s network The section provides the procedures to connect inter office fibers and verify DCC communications and path switching Contents This section is organized into the following chapters Ring setup and testing integration procedures Chapter 6 ...

Страница 274: ... 1665 Data Multiplexer 1665 DMX ring setup and testing I I I 2 365 372 304R7 1 Issue 1 November 2007 ...

Страница 275: ...fer to 365 373 302 1665 Data Multiplexer Alarm Messages and Trouble Clearing Guide for detailed troubleshooting procedures If additional provisioning procedures are desired refer to 365 372 301 1665 Data Multiplexer User Operations Guide Contents This chapter provides information on the following topics Fiber installation 6 4 Optical transmission test OC 192 OC 48 OC 12 6 11 Automatic protection s...

Страница 276: ...Multimeter Optional The voltmeter must be capable of measuring DC voltage in the 40 to 60 volt range The use of the voltmeter is optional since the shelf will alarm or shut down if the proper voltage is not supplied 1 DS1 Error Rate Test Set A DS1 error rate test set is required for testing of DS1 cabling A T BERD 2209 or equivalent is recommended 1 DS3 Error Rate Test Set A DS3 error rate test se...

Страница 277: ... handling fiber Unterminated optical connectors may emit laser radiation Do not view beam with optical instruments WARNING Laser hazard CAUTION The operational tests in this section are run only in an out of service mode of operation Office alarms will normally be connected only during the office alarm test to prevent constant alarms throughout this section ...

Страница 278: ...evious section Verify that the 1665 DMX shelf is clear of all alarms only green LEDs are lighted prior to and after completing this test CIT is still connected to the 1665 DMX The office alarm cable will remain disconnected during this procedure A properly grounded ESD wrist strap MUST be worn when handling circuit packs Unterminated optical connectors may emit laser radiation Do not view beam wit...

Страница 279: ...ministration Set NE 5 Dress optical cables in the fiber tray at the bottom front of the shelf 6 Route the optical jumpers from the bottom of the shelf 7 Establish communications with the technician at the other end of the optical span 8 At both ends of the optical span remove protective covers from receive and transmit optical jumper cables and clean LC connectors Important The 1665 DMX OLIUs requ...

Страница 280: ...helf the 1665 DMX is being connected to The Function Group slot A B C D or G 2 will connect to Main 1 10 At each end of the optical span connect the optical fiber transmit cables to the OLIU OUT connectors 11 At each end of the optical span measure the optical power of the optical fiber receive cables using an optical power meter 12 Determine the LBO value required based on the received optical po...

Страница 281: ...OC 192 high speed LNW57 6 0 to 3 0 15 3 0 to 7 0 10 7 0 to 24 0 0 LNW60 12 5 to 6 0 20 6 0 to 3 0 15 2 0 to 7 0 10 7 0 to 24 0 0 LNW555 6 0 to 0 15 0 0 to 22 0 0 LNW523 LNW527 LNW554 6 0 to 1 0 15 1 0 to 7 0 10 7 0 to 24 0 0 LNW56 2 0 to 1 0 5 1 0 to 14 0 0 LNW58 1 0 to 11 0 0 SFP XFP optics Circuit Pack Received Power dBM LBO dB S15512 LNW37 LNW45 LNW55 LNW82 8 0 to 23 0 0 OC 3 IR1 I1 LNW37 LNW45...

Страница 282: ...NW82 2 0 to 5 0 15 5 0 to 15 10 15 to 28 0 0 OC 48 SR I1 LNW55 LNW62 LNW82 LNW202 3 0 to 18 0 0 OC 48 LR I1 LNW55 LNW62 LNW82 LNW202 3 0 to 5 0 15 5 0 to 10 0 10 10 0 to 15 0 5 15 0 to 27 0 0 OC 48 LR2 I1 LNW55 LNW62 LNW82 LNW202 3 0 to 5 0 15 5 0 to 10 0 10 10 0 to 15 0 5 15 0 to 27 0 0 S2DxxC6 series LNW55 LNW62 LNW82 LNW202 3 0 to 5 0 15 5 0 to 10 0 10 10 0 to 15 0 5 15 0 to 27 0 0 OC192SR1 C1 ...

Страница 283: ...AULT LED on the OLIU extinguishes 17 Disconnect the fiber cable from the OUT connector on the OLIU at one end of the span At the other end verify that the associated FAULT LED is flashing indicating a loss of signal Reconnect the fiber and repeat the process for the other direction of transmission 18 Enable communications with the adjacent 1665 DMX nodes Configuration DCC Terminations 19 Select Po...

Страница 284: ...g 22 Verify proper communications with the adjacent 1665 DMX nodes Administration OSI Neighbor Map Result The adjacent node appears in the neighbor list 23 Perform steps in this procedure on all adjacent nodes in the ring 24 After all connections and tests have been made verify optical fiber cables are placed in fiber tray and properly routed in bay framework 25 Reconnect the office alarm cable di...

Страница 285: ...oose CP main 1 Port 1 3 Click Select 4 Select Time Period 15 Min Monitored Date Current Date and Monitor Level 0 UP 5 Click Select All to move all Available Parameters to the Selected Parameters column 6 Click Apply Result The Response Window indicates no transmission errors 7 Repeat Step 1 through Step 6 substituting CP main 2 in Step 2 8 Repeat Step 1 through Step 7 for all 1665 DMX shelves at t...

Страница 286: ...ust be clear of all alarms that is only green LEDs are lighted Main OLIU switch test 1 In order to perform path switching an add drop cross connection must be entered Select Configuration Cross Connections and use the Cross Connection Wizard to enter an add drop cross connection 2 Select View Protection 3 Under Path Protection choose Path m 1 1 and click Select 4 Note the Active Path m1 or m2 5 Di...

Страница 287: ... Reconnect the optical fiber to the OLIU Result After a short time the MJ alarm LED on the SYSCTL and the FAULT LED on the OLIU should extinguish 9 Repeat Step 2 through Step 8 to verify a switch back to the OLIU that was originally active 10 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 288: ...al switching test procedure 1 Enter an STS 1 add drop cross connection between an equipped Function Unit and the Main OLIU Select Configuration Cross Connections and use the Cross Connection Wizard to enter an add drop cross connection 2 Select Fault Protection Switch 3 Under Path Protection choose Path m 1 1 and click Select 4 Note the Active Path m1 or m2 5 Choose Switch Type Manual 6 Click Appl...

Страница 289: ...ch 2 Click on 1 1 Equip fn x x is a b c or d corresponding to the function group equipped 3 Click Select 4 Note which Function Unit or Growth Slot circuit pack is the active circuit pack 5 In the Switch Type pull down select Manual Normal 6 Click Apply Result The pack that was active should now be the standby pack and the pack that was standby is now active Transmission should take a momentary hit...

Страница 290: ...ng integration procedures 6 1 6 365 372 304R7 1 Issue 1 November 2007 9 Swap circuit packs from another function group to test any unequipped function slots 10 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 291: ... leg s of an existing cross connection associated with CP main 1 Port 1 3 Select Configuration Update System Update All 4 Verify that no alarm LEDs are lit and no FAULT LED is lit on any circuit pack If any alarm is present refer to 365 373 302 1665 Data Multiplexer 1665 DMX Alarm Messages and Trouble Clearing Guide 5 Check off the appropriate box in Appendix E Installation checklist E N D O F S T...

Страница 292: ... Final operations Ring setup and testing integration procedures 6 1 8 365 372 304R7 1 Issue 1 November 2007 3 Check off the appropriate box in Appendix E Installation checklist E N D O F S T E P S ...

Страница 293: ...llation Manual The Installation Checklist is also contained in this part Contents This section is organized into the following sections Appendix A Laser safety and classifications and Electrostatic Discharge ESD considerations Appendix B Fiber cleaning Appendix C Installing fiber connectors and LBOs Appendix D Backplane pin replacement Appendix E Installation checklist Appendix F Fiber labeling Ap...

Страница 294: ... 1665 Data Multiplexer 1665 DMX supplementary information and installation checklist I V 2 365 372 304R7 1 Issue 1 November 2007 ...

Страница 295: ...charge ESD considerations Overview Purpose This appendix provides laser safety information and precautions Contents This appendix provides information on the following topics Laser safety A 2 Electrostatic Discharge ESD considerations A 5 Laser product classification A 9 1665 DMX optical specifications A 11 ...

Страница 296: ...d in the Food and Drug Administration s Center for Devices and Radiological Health FDA CDRH regulations and the international standards IEC 60825 or DIN EN 60825 are met Please also refer to Laser product classification p A 9 Potential sources of danger Beware of the following potential sources of danger which will remain despite all safety measures taken Laser radiation can cause damage to the sk...

Страница 297: ...lass and the maximum output power 3 Laser warning labels CAUTION Do not view directly with optical instruments CLASS 1M INVISIBLE LASER RADIATION WHEN OPEN AND FIBER DISCONNECTED ATTENTION RAYONNEMENT LASER DE CLASSE 1M INVISIBLE LORSQUE L APPAREIL EST OUVERT ET QUE LA FIBRE EST DÉCONNECT E Ne pas regarder directement au moyen d un instrument optique É 848950572 MA DMX 416 H H HAZARD LEVEL 1M 1 2 ...

Страница 298: ...ollow the instructions Ignoring the instructions can result in exposure to dangerous radiation Do not view directly into the laser beam with optical instruments such as a fiber microscope because viewing of laser emission in excess of Class 1 limits significantly increases the risk of eye damage Never look into the end of an exposed fiber or an open connector as long as the optical source is still...

Страница 299: ...sipating floor mat If a static dissipating floor mat is used be sure that it is clean to ensure a good discharge path Handle all circuit packs by the faceplate or latch and by the top and bottom outermost edges Never touch the components conductors or connector pins Observe warning labels on bags and cartons Whenever possible do not remove circuit packs from antistatic packaging until ready to ins...

Страница 300: ...g this product When installing operating or maintaining this equipment basic safety precautions should always be followed to reduce the risk of fire electric shock and injury to persons including the following 1 Read and understand all instructions 2 Follow all warnings and instructions marked on this product 3 This product should be only operated from the type of power sources indicated on the ma...

Страница 301: ... product 17 Slots and openings in the unit are provided for ventilation to protect it from overheating and these openings must not be blocked or covered This product should not be placed in a built in installation unless proper ventilation is provided 18 To reduce the risk of an electrical shock do not disassemble this product Service should be performed by trained personnel only Opening or removi...

Страница 302: ...nnected to the unit Installation must include an independent frame ground drop to building ground This ground symbol is marked on the product adjacent to the ground earth area for the connection of the ground earth conductor This Equipment is to be installed only in restricted access Areas on business and customer premises applications in accordance with Articles 110 16 110 17 and 110 18 of the Na...

Страница 303: ...nd laser systems in the infrared wavelength range greater than 700 nm are assigned to one of the following classes Class I Class IIIb or Class IV Laser classification is dependent upon operating wavelength output power and fiber modefield diameter core diameter IEC requirements There are five major differences between the FDA CDRH regulations and the IEC requirements According to the IEC classific...

Страница 304: ...cal transmission equipment are assigned in either of the following two ways actual output power from the connector or fiber cut if automatic power reduction is used output power at the connector or fiber cut at one second after automatic power reduction takes place provided that maximum output and restart conditions are met Classification of optical telecommunication equipment Optical telecommunic...

Страница 305: ...le Mode 9 LC I LN50 1 LNW48 1310 8 0 Single Mode 9 LC I LN50 1 LNW50 1310 2 0 Single Mode 9 LC I LN50 1 LNW54 1550 2 0 Single Mode 9 LC I LN50 1 LNW27 1310 3 0 Single Mode 9 LC I LN50 1 LNW29 1550 3 0 Single Mode 9 LC I LN50 1 LNW31 1310 0 0 Single Mode 9 LC I LN50 1 LNW32 1310 1 5 Single Mode 9 LC I LN50 1 LNW76 1310 3 0 Single Mode 9 LC I LN50 1 LNW223 1558 98 1558 17 2 0 Single Mode 9 LC I LN50...

Страница 306: ...ode 9 LC I LN50 1 LNW427 1555 75 1554 94 2 0 Single Mode 9 LC I LN50 1 LNW447 1540 56 1539 77 2 0 Single Mode 9 LC I LN50 1 LNW449 1538 98 1538 19 2 0 Single Mode 9 LC I LN50 1 LNW453 1535 82 1535 04 2 0 Single Mode 9 LC I LN50 1 LNW455 1534 25 1533 47 2 0 Single Mode 9 LC I LN50 1 LNW459 1531 12 1530 33 2 0 Single Mode 9 LC I LN50 1 LNW56 1550 2 0 Single Mode 9 LC I LN50 1 LNW57 1550 6 0 Single M...

Страница 307: ... Circuit Pack Code Wavelength nm Maximum Output Power dBm Fiber Type µm Connector Type FDA Class IEC Class Module Code Supported Circuit Pack s Wavelength nm Output Power dBm Fiber Type µm Connector Type FDA Class IEC Class 100BASE LX L1 LNW70 LNW74 LNW78 LNW170 1310 8 0 Single Mode 9 LC I LN50 1 1000BASE SX C1 LNW70 LNW78 850 0 0 Multimode 50 and 62 5 LC I LN50 1 1000BASE ZX I1 LNW63 LNW64 LNW70 ...

Страница 308: ...imode 50 and 62 5 LC I LN50 1 GE 1X2XFC SX I1 LNW63 LNW64 LNW70 LNW73 73C LNW78 LNW170 850 2 5 Multimode 50 and 62 5 LC I LN50 1 S15512 LNW37 LNW45 LNW55 LNW82 1310 8 0 Single Mode 9 LC I LN50 1 OC3IR1 I1 LNW37 LNW45 LNW55 LNW82 1310 8 0 Single Mode 9 LC I LN50 1 OC3LR1 I1 LNW37 LNW45 LNW55 LNW82 1310 0 0 Single Mode 9 LC I LN50 1 OC12IR1 I1 LNW49 LNW55 LNW82 1310 8 0 Single Mode 9 LC I LN50 1 Mod...

Страница 309: ...de 9 LC I LN50 1 OC48LR2 I1 LNW55 LNW62 LNW82 LNW202 1550 3 0 Single Mode 9 LC I LN50 1 OC48SR1 I1 LNW55 LNW62 LNW82 LNW202 1310 3 0 Single Mode 9 LC I LN50 1 S2D23C6 LNW82 LNW202 1558 983 4 0 Single Mode 9 LC I LN50 1 S2D25C6 LNW55 LNW62 LNW82 LNW202 1557 363 4 0 Single Mode 9 LC I LN50 1 S2D27C6 LNW55 LNW62 LNW82 LNW202 1555 747 4 0 Single Mode 9 LC I LN50 1 S2D31C6 LNW82 LNW202 1552 524 4 0 Sin...

Страница 310: ...LN50 1 S2D47C6 LNW55 LNW62 LNW82 LNW202 1539 766 4 0 Single Mode 9 LC I LN50 1 S2D49C6 LNW82 LNW202 1538 186 4 0 Single Mode 9 LC I LN50 1 S2D53C6 LNW55 LNW62 LNW82 LNW202 1535 036 4 0 Single Mode 9 LC I LN50 1 S2D55C6 LNW55 LNW62 LNW82 LNW202 1533 465 4 0 Single Mode 9 LC I LN50 1 S2D59C6 LNW55 LNW62 LNW82 LNW202 1530 334 4 0 Single Mode 9 LC I LN50 1 OC192IR2 C1 LNW59 LNW502 1550 2 0 Single Mode...

Страница 311: ...and Electrostatic Discharge ESD considerations 365 372 304R7 1 Issue 1 November 2007 A 1 7 OC192SR1 C1 LNW59 LNW502 1310 1 0 Single Mode 9 LC I LN50 1 Module Code Supported Circuit Pack s Wavelength nm Output Power dBm Fiber Type µm Connector Type FDA Class IEC Class ...

Страница 312: ... 1665 DMX optical specifications Laser safety and classifications and Electrostatic Discharge ESD considerations A 1 8 365 372 304R7 1 Issue 1 November 2007 ...

Страница 313: ...ination to assure proper performance and reliability of lightwave systems With the modern high speed high power and wider bandwidth optical transmission systems clean connectors along the optical path are essential for successful operation Contents This appendix provides information on the following topics Objectives This chapter provides information to perform the following 1 Properly clean an op...

Страница 314: ...course on connector cleaning and the connector inspection process is now offered through Alcatel Lucent University Course Code LMC200H Understanding Fiber Optic Cleaning Inspection and Testing To learn more about this course consult your local Alcatel Lucent Account Representative ...

Страница 315: ...712900 2 5mm Universal adapter cap For use with the Noyes OFS 300 200X 408197044 ITE 7129D1 33712901 1 25mm Universal adapter cap For use with the Noyes OFS 300 200X 408197069 ITE 7129D2 33712902 Video Fiber Scope1 Noyes VFS 1 TBD TBD TBD Individual presaturated alcohol wipes 99 pure isopropyl alcohol 901375147 ITE 7136 33713600 CLETOP Cleaning Cassette Type A Reel 901375154 ITE 7137 33713700 CLET...

Страница 316: ... this procedure Substitution of equipment or materials is at the discretion of the user and is not recommended Luminex Cloth 5 5 x 5 5 408201226 R6033 23603300 Notes 1 This equipment may not be necessary at all locations It is to be used when the ports need to be verified for cleanliness If care is exercised when cleaning fibers the video scope may not be needed Product Model Description Comcode I...

Страница 317: ...tical connectors may emit invisible laser radiation and direct exposure can severely injure the eye If inspecting the endface of a connector with a fiberscope be absolutely certain that the system is deactivated Alcohol is flammable and is harmful if swallowed inhaled or absorbed through the skin Keep alcohol away from heat sparks or flame Avoid contact with eyes skin and clothing WARNING Laser ha...

Страница 318: ...e located longitudinally down the center of its axis allowing enough tolerance for a fiber to pass through All optical connectors should be cleaned prior to being connected Keep the protective ferrule dust cap on the connector until initiating the cleaning process Cleaning procedure The following cleaning procedure is acceptable for field service installation activities 1 Remove the dust cap from ...

Страница 319: ...rwise hold the CLETOP cassette cleaner in the palm of your hand with the cassette shutter door facing up See Figure B 2 CleTop Cleaner p B 8 Rotate the cassette lever all the way down with your thumb Do not release the lever The lever advances the dry Luminex cleaning cloth inside the case and simultaneously opens the shutter The CLETOP cassette shutter door is now open and ready for cleaning the ...

Страница 320: ...pressed snug against the cleaning cloth while dragging the ferrule to assure the proper cleaning action 6 Release the cassette lever allowing the shutter door to close to its initial position Continue with Step 5 7 Wrap a Luminex cleaning cloth around the ferrule and rotate the connector housing cleaning the outside periphery of ferrule Follow this by folding an unused portion of the cloth over th...

Страница 321: ...e ferrule and fiber as observed by the inspection system scope should be free of any contaminates See Figure B 3 Acceptability Criteria for Fiber Cleaning p B 10 Repeat the Cleaning Procedure if the fiber endface does not meet the following requirements Requirement No fixed type of contamination contaminates that remain at the same location after three wet dry cleaning cycles regardless of size is...

Страница 322: ...imes Following this procedure carefully place the cap over the ferrule When the cleaned connector is ready for assembly it should be re inspected for cleanliness prior to connection E N D O F S T E P S Fiber adapters or circuit pack connectors During testing and or trouble shooting activities it may be necessary to clean the optical buildout adapter or the circuit pack connector The following proc...

Страница 323: ... the connector Apply slight pressure upon contact and rotate stick 360 degrees at least three 3 times 2 Remove the stick cleaner rotating it upon removal 3 Using a dry CLETOP stick cleaner of appropriate diameter repeat the above cleaning procedure This procedure will clean the side walls of the adapter and the endface of the circuit pack connector 4 Gently insert the Video Fiber Scope probe into ...

Страница 324: ...extremely important to clean the connector ferrule end surface each time before making connections Procedure Complete the following steps to clean a pluggable optics module 1 Remove the protective process plug from the pluggable optics module Keep the process plug clean until reinstalled later if required When performing this step hold the canned dry nitrogen or air upright If the canned dry nitro...

Страница 325: ...peat Step 4 6 If required reinstall the process plug into the optical ports to maintain cleanliness E N D O F S T E P S CAUTION This step should only be performed on the transmit TX port if the air blows did not work Do not perform this step on the receive RX port The receive RX port contains a lens for focusing a wide input The lens is more easily scratched than cleaned CAUTION It is recommended ...

Страница 326: ... Cleaning pluggable optics modules Fiber cleaning B 1 4 365 372 304R7 1 Issue 1 November 2007 ...

Страница 327: ...al circuit packs Contents This appendix provides information on the following topics Objectives This appendix provides information to perform the following Install and remove LC type LBOs onto and from LC type ports Install and remove LC type fiber connections Fiber cleaning Refer to Appendix B Fiber cleaning for fiber cleaning information Do not attempt to clean LBOs as they may be damaged by a c...

Страница 328: ...Dust caps should be applied on all LBOs when not installed in connector ports LC type connector port The LC type connector port will only accept LC type LBOs for external fiber connection Figure C 1 LC Type Connector Ports on Circuit Pack LC type LBO 1665 DMX utilizes Alcatel Lucent s state of the art AllWave ADVANTAGE Fiber Optic Attenuators These attenuators reduce optical power from the transmi...

Страница 329: ...C Type LBO Assembly of LC type LBO into LC block The LC type LBOs are installed into the LC type connector by aligning the alignment key with the slot in the connector port and pushing the LBO into the port until it snaps into place Figure C 3 LC Type LBO Inserted Into LC Type Connector Port Removal of LC type LBO from LC block The LC type LBOs are removed from the LC type connector port by depres...

Страница 330: ... LBOs Installing fiber connectors and LBOs C 4 365 372 304R7 1 Issue 1 November 2007 Figure C 4 Removing LC Type LBO From LC Type Connector Port DEPRESS TAB TO RELEASE LBO ...

Страница 331: ... Appendix B Fiber cleaning for Fiber Cleaning information Dust caps should be applied to all fiber connectors when not installed in a connector port LC type connections LC type fiber connectors use a snap action lever tab locking method to join the fiber connector to the port connector Figure C 5 LC Type Fiber Connector The LC type fiber connector is assembled onto an LC type connector port of a c...

Страница 332: ... Fiber connections Installing fiber connectors and LBOs C 6 365 372 304R7 1 Issue 1 November 2007 Figure C 6 LC Type Fiber Connection ALIGNMENT SLOT DEPRESS LEVER TO RELEASE THE SNAP ACTION TAB ...

Страница 333: ...5 DMX backplane has been bent or broken Contents This appendix provides information on the following topics Objectives This appendix provides information and procedures to do the following Identify a bent or broken pin Determine the correct replacement pin and pin kit Straighten bent pin Replace broken pins Pin and connector background D 2 Repair kits and tools D 4 Simple repair methods D 5 Replac...

Страница 334: ...have been press fit into the backplane Should these connectors be damaged beyond simple repair methods contact your next level of support for the replacement procedure RJ45 jacks Interface cabling to and from the 1665 DMX shelves is connected through RJ45 connectors jacks which have been press fit into the backplane Should these jacks be damaged beyond simple repair methods contact your next level...

Страница 335: ...372 304R7 1 Issue 1 November 2007 D 3 Table D 1 Backplane Locations of METRAL Pins Row Column Type Mating Length mm Tail Length mm 001 154 156 162 GND Signal Pin 5 75 4 30 001 154 156 162 a b c d e Signal Pin 8 00 4 30 All others All others Signal Pin 5 75 4 30 ...

Страница 336: ...ent pins are available These pins are defined by the mating length extending beyond the inside of the plastic shroud and by their tail length for press fitting into the backplane The tail length includes a compliant press fit section needed to achieve a gas tight connection in four contact areas All the METRAL pins used on the 1665 DMX shelves have the same tail length of 4 30 mm 0 169 in Addition...

Страница 337: ... reliable connection If the visual examination suggests that the connector pins are loose or are damaged beyond repair replace the connector pin METRAL backplane pins Follow the instructions and use the tools provided in the MT370 01 Shelf Level Press Fit Repair Kit to straighten METRAL pins which may have been bent out of position Guide pins and keying pins If a stainless steel guide pin or keyin...

Страница 338: ...e manner that the exposed pin terminals of a plug might be bent The damage concern for these receptacle terminals is that they may be crushed or otherwise distorted out of shape Attempts to straighten these terminals may result in fracturing them If a receptacle terminal has been damaged to the extent that the mating plug connector cannot be connected then the recommended alternative is to replace...

Страница 339: ...65 DMX backplane A second removal and replacement in the same plated through hole may not meet the long term reliability objectives If a replacement is needed for a previously replaced connector pin contact your next level of support before proceeding Important Protect the surrounding area from any debris which may be generated during the pin removal and replacement Procedure for METRAL pins Use t...

Страница 340: ...eplace Guide or Keying Pins contact your next level of support for tooling replacement parts and detailed replacement procedures The replacements will need to installed with screws and washers D subminiature pin procedure If it becomes necessary to replace either the D Subminiature pins or connector contact your next level of support for detailed replacement procedures RJ45 jacks If it becomes nec...

Страница 341: ... as to the reason why This checklist should be turned in as part of your job complete paperwork Contents This chapter contains the following Table E 1 Installation Acceptance Checklist Overview E 1 Section and Chapter Procedure Required Completed Yes No Part I 1665 Data Multiplexer 1665 DMX physical installation and powering Chapter 1 Equipment and cable installation for 1665 Data Multiplexer 1665...

Страница 342: ...ble installation p 1 64 See Note 1 Modem cable installation p 1 69 See Note 1 Sync cable installation p 1 72 Sync cable with molded DB 9 connector procedure p 1 72 See Note 1 Sync cable with wire wrap DB 9 connector procedure p 1 74 See Note 1 Office alarm cable installation p 1 78 See Note 1 Miscellaneous environmental discrete telemetry cable installation p 1 84 See Note 1 Main optical fiber ins...

Страница 343: ...5 8 8 channel low loss DWDM Optical Mux Demux p 2 19 See Note 1 LNW6 28DS1 LNW7 28DS1PM LNW8 56DS1E1 low speed installation optional p 2 20 See Note 1 LNW16 12DS3 EC1 LNW18 TMUX LNW19 LNW19B 48 DS3 EC1 LNW20 48TMUX low speed installation optional p 2 21 See Note 1 LNW36 OC 3 OLIU low speed installation optional p 2 22 See Note 1 LNW37 4 OC 3 SFP OLIU LNW45 8 OC 3 SFP OLIU LNW49 4 OC 12 SFP OLIU LN...

Страница 344: ...ee Note 1 Install pluggable transmission modules p 2 34 See Note 1 Part II 1665 Data Multiplexer 1665 DMX stand alone installation tests Chapter 3 Software download and circuit pack installation Software installation p 3 4 See Note 1 Circuit pack installation p 3 5 See Note 1 Use of WaveStar CIT software p 3 9 Yes Circuit pack firmware version verification p 3 12 See Note 1 1665 DMX shelf initiali...

Страница 345: ...path switching test manual p 4 16 See Note 1 DS1 cleanup procedures p 4 18 Delete any existing DS1 cross connections p 4 18 See Note 1 Verify cross connects removed p 4 21 See Note 1 DS3 EC1 and TMUX testing procedure p 4 22 Verify provisioning p 4 22 See Note 1 DS3 terminating equipment loopback testing optical main OLIUs p 4 23 See Note 1 DS3 non terminating transmission optical main OLIU p 4 26...

Страница 346: ...eed testing p 4 43 OC 3 testing procedure p 4 43 See Note 1 OC 12 low speed testing p 4 47 OC 12 testing procedure p 4 47 See Note 1 OC 12 facility loopback testing p 4 49 See Note 1 OC 48 low speed testing p 4 52 OC 48 low speed testing procedure p 4 52 See Note 1 OC 48 facility loopback testing p 4 53 See Note 1 LED test p 4 56 LED test procedure p 4 56 See Note 1 Additional optical tests option...

Страница 347: ...tion p 5 13 Timing verification test procedure p 5 13 See Note 1 Miscellaneous environmental discrete telemetry test p 5 16 Miscellaneous discrete telemetry test procedure p 5 16 See Note 1 Modem connection test p 5 19 Modem connection test procedure p 5 19 See Note 1 Final operations p 5 21 Procedure p 5 21 Yes Section and Chapter Procedure Required Completed Yes No ...

Страница 348: ...re p 6 5 Optical transmission test OC 192 OC 48 OC 12 p 6 11 Transmission test procedure p 6 11 Automatic protection switching test p 6 12 Main OLIU switch test p 6 12 Manual switching tests p 6 14 Manual switching test procedure p 6 14 Yes Function units growth slots switching test p 6 15 Final operations p 6 17 Procedure p 6 17 Clear PM registers p 6 17 Notes 1 Only required if equipped Section ...

Страница 349: ...372 304R7 1 Issue 1 November 2007 Appendix F Fiber labeling Overview Purpose This chapter describes the labeling of the fiber Contents This chapter contains the following Fiber description F 2 Fiber labels F 4 ...

Страница 350: ...tallation is covered in Chapter 1 Chapter 2 Chapter 3 and Chapter 6 Yellow fiber Yellow fiber is made up of a single mode yellow colored fiber equipped with LC connectors at both ends The Yellow Fibers come in different lengths as well as custom lengths The length is given on the protection boot of the LC connector These fibers are used to make connections from the circuit pack to the LGX Installa...

Страница 351: ...ll cable tags shall be removed A 1310 nm or 1550 nm test source and an ITE 7116 or equivalent optical power meter shall be used to perform all tests The light source shall first be measured for a reference point baseline No fiber jumper may have a measured loss of more than 2 dB CAUTION Equipment Damage Fiber is constructed of glass and should be treated with care It should not be pulled or stretc...

Страница 352: ...bel maker 2 Apply the label to the strain relief boot close to the body of the LC connector 3 Adhere the end of the label with the printed text first 4 The label must be oriented perpendicular to the main axis of the connector 5 Wrap the label around the boot so that the second wrap is directly on top of the first wrap The label will wrap around the boot approximately two times The text is printed...

Страница 353: ... pack PTMs are sometimes referred to as SFP small form pluggable modules Contents This chapter contains the following CAUTION Laser Safety When connecting fiber loops between the IN and OUT ports on optical circuit packs always connect to the IN port first and then the OUT port This will prevent any optical radiation from being present at the fiber end Pluggable transmission modules G 2 Install pl...

Страница 354: ...nt approved RJ 45 Cat 5 E cable maximum span length of 100 meters LNW63 LNW64 LNW70 LNW78 LNW170 OC 3IR1 I1 109453894 OC 3 PTM TRCVR Intermediate Reach 1 3 IR 1 1310nm LNW37 LNW45 LNW55 LNW82 OC 3LR1 I1 109453886 OC 3 PTM TRCVR Long Reach 1 3 LR 1 1310nm LNW37 LNW45 LNW55 LNW82 S15512 109602599 OC 3 PTM TRCVR Short Reach 1 3 SR 1 1310 nm LNW37 LNW45 LNW55 LNW82 OC 12IR1 I1 109453902 OC 12 PTM TRCV...

Страница 355: ...82 LNW202 S2D27C6 109610410 OC48 STM16 OTU1 DWDM 192 7THz 1555 747nm LNW55 LNW62 LNW82 LNW202 S2D31C6 109610451 OC48 STM16 OTU1 DWDM 193 1THz 1552 524nm LNW82 LNW202 S2D33C6 109610477 OC48 STM16 OTU1 DWDM 193 3THz 1550 918nm LNW82 LNW202 S2D35C6 109610493 OC48 STM16 OTU1 DWDM 193 5THz 1549 315nm LNW82 LNW202 S2D37C6 109610519 OC48 STM16 OTU1 DWDM 193 7THz 1547 715nm LNW82 LNW202 S2D45C6 109610600 ...

Страница 356: ...09537555 OC 192 XFP TRCVR Long Reach 1 5 LR 2 80 km 1550 nm LNW59 LNW502 100BASE LX I1 FE TX 109527812 Optical Fast Ethernet PTM LC type connectors FE 1310SM LNW74 LNW70 LNW78 LNW170 GE 1X2XFC LX C1 1000BASE LX 1Gbps and 2 Gbps Fibre Channel FICON 109527804 GbE long reach Single Mode PTM supports Ethernet FICON and Fibre Channel traffic LC type connectors GbE FC 2FC 1310 LNW64 LNW70 LNW73 LNW73C L...

Страница 357: ...2FC 850 LNW63 LNW64 LNW70 LNW73 LNW73C LNW78 LNW170 GE 1X2XFC LX I1 1000BASE LX 1 Gbps 109568782 GbE long reach Single Mode PTM supports Ethernet FICON and Fibre Channel traffic LC type connectors OSP hardened GbE FC 2FC 1310 LNW63 LNW64 LNW70 LNW73 LNW73C LNW78 LNW170 1000BASE ZX I1 1000BASE ZX 1Gbps 109541862 GbE Short reach Single Mode PTM supports Ethernet LC type connectors OSP hardened GbE 1...

Страница 358: ...ld the connector latch end of the module in your left hand with the gold fingers facing you The module should be positioned in manner similar to Figure G 1 Pluggable Transmission Module With Dust Plug Optical PTMs Only p G 6 Figure G 1 Pluggable Transmission Module With Dust Plug Optical PTMs Only Important Do not remove the dust plug unless you are ready to connect fibers or if you need to clean ...

Страница 359: ...sue 1 November 2007 G 7 Figure G 2 Examples of Dust Plugs 3 Referring to Figure G 3 Module Types p G 7 below determine the type of latching mechanism on the pluggable transmission module you have Figure G 3 Module Types MA DMX 421 Gold Fingers Gold Fingers MA DMX 445 1 2 3 Gold Fingers Port Port Port ...

Страница 360: ... into the optical ports to maintain cleanliness during storage and or transportation It is recommended that the dust plug be kept in place to maintain cleanliness until the cabling is connected With proper care and handling cleaning the pluggable transmission modules should not be necessary Gold Fingers Gold Fingers Gold Fingers MA DMX 439 4 5 6 Port Port Port 7 8 MA DMX 442 Gold Fingers Port Gold...

Страница 361: ... port opening and latch mechanism may vary Figure G 4 Latch Type 3 Opened and Closed 6 Proceed to Step 8 7 Before inserting the module the latch must be in the closed position With the dust plug in place the latch is in the closed position Figure G 5 shows the open and closed position of the latch Depending on your PTM type the appearance of the port opening and latch mechanism may vary If Then Ty...

Страница 362: ...u Do not insert pluggable transmission module 9 Rotate the module the dust plug or port end is facing you and the gold fingers are pointing away from you and are facing to the right Do not insert pluggable transmission module 10 Insert the pluggable transmission module in the required socket of the circuit pack faceplate Confirm that the pluggable transmission module is locked in the socket Verify...

Страница 363: ...mission module has unique internal data for warranty purposes If this data for any reason is not unique both pluggable transmission modules with the duplicated information will be declared failed Refer to the 1665 Data Multiplexer Alarm Messages and Trouble Clearing Guide 365 372 302 11 Push on the dust plug or port end to insert the module The latch automatically catches when the module is insert...

Страница 364: ... lighted on the SYSCTL circuit pack 15 From the System View window select Configuration Update System Update All Result The port LED stops flashing All alarms are cleared 16 Repeat Step 1 to Step 15 for additional pluggable transmission modules 17 If all pluggable transmission modules are installed then from the System View menu click on the Alarm List button to verify that no alarms are present f...

Страница 365: ...is chapter provides important technical assistance information for the 1665 Data Multiplexer 1665 DMX Contents This appendix contains the following sections Technical assistance H 2 Accessing and navigating the On Line Customer Support OLCS web site H 7 Other technical support services H 13 ...

Страница 366: ...rt Services are available 24 hours a day 7 days a week For additional information regarding Alcatel Lucent Worldwide Services refer to the Alcatel Lucent web site at http www alcatel lucent com solutions Select the appropriate category Service Providers Enterprise Important Use the appropriate steps below for the above categories Service Providers 1 Select Service Providers 2 Select Services 3 Sel...

Страница 367: ...atel Lucent Welcome Center operator can direct the request to engineers that are highly trained and skilled in resolving issues involving Alcatel Lucent products Technical assistance is available 24 hours a day 7 days a week On line customer support Overview On Line Customer Support OLCS is the Customer Support web site for our customers technical support needs This customer web access tool provid...

Страница 368: ...Users can choose a method for receiving updates email text messaging messages or none Users can choose when updates are wanted when the state of the AR changes any update to the investigation field occurs or any time any text field is modified Users can log into the OLCS web site and view ARs 24 hours a day 7 days a week Data Drop Box The Data Drop Box feature allows Alcatel Lucent support technic...

Страница 369: ...ich are technical documents that explain the operation of a particular part of the system The following documents are available in this section Change Notice CN Ethernet Management Guide Method of Procedure MOP Planning Guide Service Assurance Guide Engineering Change Procedure ECP Feature Contents Operations Interworking OI Guide Screen Help White Papers These documents will vary from product to ...

Страница 370: ...nce or preventive nature Alcatel Lucent Alerts contain detailed text descriptions and urgency of Alcatel Lucent product issues that need to be quickly communicated to customers after the deployment of a release or product Product Change Notices The Product Change Notices PCN area provides information on hardware changes for a product There is a selection of choices to help you search for Change No...

Страница 371: ...irmation is sent within 2 business days The following steps tell you how to register for a login 1 Select Register Here on the top right just below the Login and Password boxes of the Online Customer Support https support lucent com portal olcsHome do web site 2 Follow this registration process Select the role and accept the terms of use Provide a business identification and enter in all of the re...

Страница 372: ...me The changes take effect immediately There are two methods to find product information Click My Products to choose a product or click Documentation or Downloads to display a complete product listing When the full product list is displayed use the alphabetic listing default or the category list whichever you prefer Once a product is selected a Product Summary Page is displayed which describes all...

Страница 373: ... are both legacy tools The new tools Alcatel Lucent Alerts and Ask AL Knowledge base are discussed in other sections of this document When you select CARES a general web page displays From that page a particular function can be selected from the left column To provide more information on the selected tool select More from the center column ARs can be viewed using Find an AR or Advanced query creat...

Страница 374: ...tion Center CIC web site or to another OLCS webpage that contains the product documentation Within the Documentation and Downloads area the Technical Notes link brings you to a web page which contains documents that are not release specific and are technical in nature Also within the Documentation and Downloads area the Release Information link brings you to a Library of Release Notes web page tha...

Страница 375: ...e to You have the option to click Modify Subscription or Cancel Subscription Modify Subscription allows you to modify the Urgency Type and or Products selected Cancel Subscription will stop future Alcatel Lucent Alerts email messages Product Change Notices PCNs You can access Product Change Notices PCNs from the left column on the Customer Support home page unless this view has been changed from t...

Страница 376: ...S web site Technical support H 1 2 365 372 304R7 1 Issue 1 November 2007 Once on the RMA web page a table with contact information is displayed Use the contact information provided or choose to fill in the online RMA request form at the bottom of that web page ...

Страница 377: ...ules will round out the understanding of the network element NE troubleshooting performed Objectives Each module has specific objectives Some overall series objectives are listed below Understand advanced network element security features Setup and understand interworking between Alcatel Lucent network elements Perform provisioning operations and remote trouble shooting using CIT EMS and TL1 inter...

Страница 378: ...sed Workshop Location This workshop will be delivered in the Customer Advocate System Test Labs in Westford MA The format is 75 hands on lab exercises reinforced with 25 classroom instruction How to Sign Up To enroll in the training course Within the United States Visit https training lucent com Call 1 888 582 3688 Prompt 2 Outside the continental United States Visit https training lucent com Cont...

Страница 379: ...O SW Alarm Cutoff and Test ADM Add Drop Multiplexer AGNE Alarm Gateway Network Element AIS Alarm Indication Signal AMI Alternate Mark Inversion ANSI American National Standards Institute APS Automatic Protection Switch ARM Access Resource Manager AS C Alarm Status and Control ASCII American Standard Code for Information Interchange ...

Страница 380: ...olar 3 Zero Substitution B8ZS Bipolar 8 Zero Substitution BDFB Battery Distribution and Fuse Bay BER Bit Error Ratio BIP Bit Interleaved Parity BITS Building Integrated Timing Supply BRI Basic Rate Interface C CC Clear Channel CCITT International Telephone and Telegraph Consultative Committee CEV Controlled Environment Vault CD ROM Compact Disk Read Only Memory CDTU Channel and Drop Test Unit ...

Страница 381: ...ntary Metal Oxide Semiconductor CMTS Cable Modem Termination System CO Central Office CP Circuit Pack CPE Customer Premises Equipment CR Critical alarm status CSA Carrier Serving Area CSU Channel Service Unit CS O Customer Support and Operations CV Coding Violation CVFE Coding Violation Far End D DCC Data Communications Channel DCE Data Communications Equipment DEMUX Demultiplexer ...

Страница 382: ...lexer DSNE Directory Services Network Element DSX Digital Cross Connect Panel DT Distant Terminal DTE Data Terminating Equipment E EC 1 Electrical Carrier Level 1 ECI Equipment Catalog Item EEPROM Electrically Erasable Programmable Read Only Memory EIA Electronic Industries Association EMC Electromagnetic Compatibility EMI Electromagnetic Interference EOOF Excessive Out of Frame EPROM Erasable Pro...

Страница 383: ...ST Environmental Stress Testing F FCC Federal Communications Commission FDDI Fiber Distribution Data Interface FE Far End FE ACTY Far End Activity FEBE Far End Block Error FE ID Far End Identification FEPROM Flash EPROM FERF Far End Receive Failure FE SEL Far End Select FIT Failures in 109 hours of operation G GbE Gigabit Ethernet GNE Gateway Network Element ...

Страница 384: ...orm GUI Graphical User Interface H HECI Humans Equipment Catalog Item I IC Internal Clock ID Identifier IEC International Electrotechnology Commission IMF Infant Mortality Factor INC Incoming Status I O Input Output IP Internet Protocol IR Intermediate Reach IS In Service ISCI Intershelf control Interface ISI Intershelf Interface ISDN Integrated Services Digital Network ...

Страница 385: ...telligent Vehicle Highway System L LAN Local Area Network LAPD Link Access Procedure D LBO Line Build Out LCN Local Communications Network LEC Local Exchange Carrier LED Light Emitting Diode LOF Loss of Frame LOP Loss of Pointer LOS Loss of Signal LR Long Reach LS Low Speed M MD Mediation Device MJ Major Alarm MM Multimode ...

Страница 386: ... Failures MTBMA Mean Time Between Maintenance Activities Mult Multipling MUX Multiplex MXBIU Multiplexer and Backplane Interface Unit N NE Near End NE Network Element NE ACTY Near End Activity NEBS Network Equipment Building System nm Nanometer 10 9 meters NMA Network Monitoring and Analysis NMON Not Monitored provisioning state NRZ Nonreturn to Zero NNI Network Network Interface ...

Страница 387: ...Optical Carrier Level 3 Signal 155 Mb s OC 12 Optical Carrier Level 12 Signal 622 Mb s OC 48 Optical Carrier Level 48 Signal OLIU Optical Line Interface Unit OOF Out of Frame OOL Out of Lock OPS INE Operations System Intelligent Network Element OS Operations System OSGNE Operations System Gateway Network Element OSI Open Systems Interconnection OSMINE Operations Systems Modifications for the Integ...

Страница 388: ... Negative Field Effect Transistor PJC Pointer Justification Count PLL Phase Locked Loop PM Performance Monitoring PMN Power Minor Alarm POH Path Overhead POP Points of Presence POTS Plain Old Telephone Service PRM Performance Report Message PROTN Protection PRS Primary Reference Source PSU Power Supply Unit PTM Pluggable Transmission Module PVC Permanent Virtual Circuit ...

Страница 389: ...t Regional Technical Assistance Center 1 866 LUCENT8 RZ Return to Zero S SA Service Affecting SCADA Supervisory Control and Data Acquisition SD Signal Degrade SDH Synchronous Digital Hierarchy SEFS Severely Errored Frame Seconds SEO Single Ended Operations SES Severely Errored Seconds SF Super Frame format for DS1 signal SFP Small Form Pluggable SID System Identification SLA Service Level Agreemen...

Страница 390: ...S 1 SPE STS 1 Synchronous Payload Envelope STS 3c Synchronous Transport Level 3 Concatenated Signal STS 12c Synchronous Transport Level 12 Concatenated Signal SYSCTL System Controller circuit pack T T1X1 and T1M1 The ANSI committees responsible for telecommunications standards TA Telcordia Technologies Technical Advisory TABS Telemetry Asynchronous Byte Serial Protocol TARP Target ID Address Resol...

Страница 391: ...age 1 TLB Timing Looped Back TOP Task Oriented Practice TR Telcordia Technologies Technical Requirement TSA Time Slot Assignment TSI Time Slot Interchange TSO Technical Support Organization U UAS Unavailable Seconds UNI User Network Interface UOC Universal Optical Connector UPD INIT Update Intialize UPSR Unidirectional Path Switched Rings V VF Voice Frequency VLAN Virtual Local Area Network ...

Страница 392: ...tegration VM Violation Monitor VMR Violation Monitor and Removal VoIP Voice over Internet Protocol VONU Virtual Optical Network Unit VPN Virtual Private Network VT Virtual Tributary VT1 5 Virtual Tributary 1 5 1 728 Mb s VT G Virtual Tributary Group W WAN Wide Area Network ...

Страница 393: ... single spare protection circuit pack 1x1 is a special case of 1xN with N 1 In 1x1 only one is active at a time A Active Active identifies a 1 1 protected OC N line which is currently selected by the receiver at either end as the payload carrying signal or a 1x1 or 1xN protected circuit pack that is currently carrying service See Standby AGNE Alarm Gateway Network Element A defined NE in an alarm ...

Страница 394: ...oring over a specified number of bits that is BIP 3 or BIP 8 BITS Building Integrated Timing Supply A single clock that provides all the DS1 and DS0 synchronization references required by clocks in a building Broadband Any communications channel with greater bandwidth than a voice channel sometimes used synonomously with wideband Also refers to signals at the DS3 44 736 Mb s and higher Wideband re...

Страница 395: ...in the SONET line It is used for end to end communications and maintenance It carries alarm control and status information between network elements in a SONET network DCE Data Communications Equipment In a data station the equipment that provides the signal conversion and coding between the data terminal equipment DTE and the line The DCE may be separate equipment or an integral part of the DTE or...

Страница 396: ...per ring Can also be a GNE DSX Digital Cross Connect Panel A panel designed to interconnect to equipment that operates at a designated rate For example a DSX 3 interconnects equipment operating at the DS3 rate DTE Data Terminating Equipment That part of a data station that serves as a data source originates data for transmission a data sink accepts transmitted data or both Dual Homing A network to...

Страница 397: ...the faceplate of the SYSCTL circuit pack FIT Failures in 109 hours of operation Free Running An operating condition of a clock in which its local oscillator is not locked to an internal synchronization reference and is using no storage techniques to sustain its accuracy FT 2000 Lucent s SONET OC 48 Lightwave System Function Unit Refers to any one of a number of different circuit packs that can res...

Страница 398: ...t An equalizer network between the DMX 2 5G Multiplexer and the DSX panel It guarantees the proper signal level and shape at the DSX panel LED Light Emitting Diode Used on a circuit pack faceplate to show failure red or service state It is also used to show the alarm and status condition of the system Line Timing The capability to directly derive clock timing from an incoming OC N signal while pro...

Страница 399: ...tal signal Mult Multipling The cascading of signals in a bay In the MULT mode the DS1 external reference can be cascaded to other shelves in a bay using Mult cables Normally starting with the bottom shelf Number 1 and working towards the top of the bay N NE Near End The network element the user is at or working on Also called local NE Network Element The basic building block of a telecommunication...

Страница 400: ...cal Carrier Level 3 Concatenated Signal Low speed broadband equivalent to three STS 1s linked together with a single path overhead OC 12 Optical Carrier Level 12 Signal 622 Mb s OC 12c STS 12c Optical Carrier Level 12 Concatenated Signal High speed broadband equivalent to twelve STS 1s linked together with a single path overhead OC 48 Optical Carrier Level 48 Signal Operations Interface Any interf...

Страница 401: ...ee Channel State Provisioning Proactive Maintenance Refers to the process of detecting degrading conditions not severe enough to initiate protection switching or alarming but indicative of an impending signal fail or signal degrade defect for example performance monitoring Protection Line As defined by the SONET standard the protection line is the pair of fibers one transmit and one receive that c...

Страница 402: ... Operations The maintenance capability that provides remote access to all DMX 2 5G Multiplexer systems from a single location over the DCC Service Line On a DMX 2 5G Multiplexer system a service or working line is a pair of fibers one transmit and one receive that terminate on an OLIU circuit pack in the Main 1 A 1 B 1 C 1 or D 1 slots As defined by the SONET standard the SONET APS channel is not ...

Страница 403: ...t Signal The basic building block signal with a rate of 51 840 Mb s for an STS 1 signal and a rate of n times 51 840 Mb s for an STS n signal STS 1 SPE STS 1 Synchronous Payload Envelope A 125 microsecond frame structure composed of STS path overhead and the STS 1 payload STS 3c Synchronous Transport Level 3 Concatenated Signal See OC 3c Subnetwork Group of SONET network elements that share a SONE...

Страница 404: ...hich line the near end receiver has chosen so that an active indication may be made at the far end UOC Univeral Optical Connector Receptacles on the faceplate of some OLIUs that accept ST SC or FC connectors UPD INIT A push button on the SYSCTL faceplate V VM Violation Monitor A mode of the DS3 circuit pack in which it will monitor but not remove P bit parity violations on the DS3 signal from the ...

Страница 405: ...BDFB 1 16 1 21 1 22 1 23 1 24 bay frame ground 6 bipolar 8 zero substitution B8ZS 5 13 BITS clock 5 13 C cable s 10 100Base T 1 58 1000Base T 1 92 1 94 1000Base T optical fiber optical fiber 1000Base T 1 93 1 95 CIT 3 2 CIT interface 2 2 4 3 5 2 6 2 discrete cables 1 84 DS1 1 34 1 36 1 41 1 54 DS1 color codes 1 36 DS3 EC 1 1 41 1 54 DS3 EC 1 cable connections 1 44 environmental 1 84 IAO LAN TCP IP...

Страница 406: ... Extended superframe ESF 5 13 external buffer relay 1 78 F fan alarm 5 8 6 12 FDA CDRH A 2 21 CFR 1040 10 and 1040 11 A 2 FDA CDRH regulations A 9 fiber cleaning B 1 acceptable criteria B 10 function group 5 6 function unit 5 7 6 15 G ground 1 3 1 4 1 12 1 13 bay frame 6 I IAO LAN TCP IP cabling 1 64 IEC 60825 1 A 2 IEC requirements A 9 J jumper s optical fiber 1 4 4 2 4 43 4 44 4 45 4 46 4 47 4 4...

Страница 407: ...mic network bay frame 1 4 serial port 1 96 single mode fiber 1 88 standards Pacific Bell Equipment Framework Standard PBS 000 102PT 1 4 Superframe SF 5 13 SYNC cable 1 74 cable s SYNC 1 72 SYNC cables DS1 timing 1 77 synchronization cable connections 1 77 timing 1 77 T technical support H 1 telemetry 1 84 5 16 connections 5 18 telemetry panel 1 85 test equipment CIT interface cable 2 2 DS1 error r...

Страница 408: ...I N 4 365 372 304R7 1 Issue 1 November 2007 Index ...

Отзывы: