58
Primary heat exchange
r (see
fi
g. 35)
●
Close the shut-off valves and drain the central
heating circuit of the boiler;
●
Switch off the power and gas supply to the
boiler;
●
Remove and dismantle the entire burner unit
(see 6.6.1 “Cleaning the condensation module
and burner unit”);
●
Remove the gas valve;
●
Remove the spring and then the condensate
drainpipe;
●
Remove the
fi
xing springs and then the deliv-
ery and return pipes;
●
Remove the support brackets and pull out the
heat exchanger;
●
Remove the regulation sensor from the old
heat exchanger and re
fi
t it together with the
two condensate drainpipes to the new one;
●
Replace the heat exchanger and re-assemble
the components following the above proce-
dure in reverse order;
●
Switch on the electricity, water and gas sup-
plies and
fi
ll the system with water. Check for
any leaks from the joints and bleed off any air
from the circuit. Restart the boiler, making sure
that there are no gas leaks;
d
Fig. 1
primary heat
exchanger
flue connection
chamber
steinless steel
pipe coil
ceramic fibre
washer
35
Содержание SERADENS SRD 20
Страница 1: ...SERADENS SRD 20 27 36 PREMIX CONDENSING BOILER INSTALLATION OPERATING and MAINTENANCE INSTRUCTIONS...
Страница 2: ...Code No A 1 4 3 Publishing Date 241109 Revision Date 241109...
Страница 31: ...31 80 48 5 313 48 5 111 5 187 111 5 80 163 137 122 106 131 SRD 36...
Страница 65: ...65 7 8 Troubleshooting...
Страница 67: ......